Attach. 4 - Schedule of Material Submittals.xlsx
XLSX spreadsheet 107 KB Posted
- Attached to
- Replace Miltary Family Housing Units Federal contract opportunity
- Solicitation number
- FA557521B0002
About this file
This document is a solicitation for a construction project to replace military family housing units. The project involves replacing housing units 650 and 658 and has an estimated value between $1,000,000 and $5,000,000 USD. A pre-proposal site visit will be held on May 20, 2021 at 10:00 local time. Questions regarding the solicitation are due by May 26, 2021, and bids must be received by June 9, 2021. In accordance with agreements between the US and Spain, Spanish labor, materials, and equipment must be used where feasible. The solicitation notes that funds are not presently available and no award will be made until funding is received. The government reserves the right to cancel the solicitation before or after the closing date without obligation to reimburse offerors for any costs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA557521B00020001.pdf | ||
| Attach. 6 - MFH Housing QandA.pdf | ||
| FA557521B00020001 - Amendment 1 QandA SF 30.pdf | ||
| Attach. 2 - Especificaciones (Espanol).pdf | ||
| Solicitation - FA557521B0002.pdf | ||
| Attach. 3 - Drawings.pdf | ||
| Attach. 1 - Specifications (English).pdf | ||
| Attach. 5 - Construction Cost Estimate Breakdown.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Sch. (ENG)
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 06-4001 | PROJECT TITLE: | |||
| RPL MFH COMMAND UNITS | SOLICITATION / CONTRACT NO. |
FA557520F0006
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 01 | ||||||||||||||
| 01 | Warranty letter | 1 | Acceptance+15 | |||||||||||
| 02 | Construction Schedule | 1 | CNTP+7 | |||||||||||
| 03 | Progress Schedule | 1 | CNTP+10 | |||||||||||
| 04 | Work Plan | 1 | CNTP+7 | |||||||||||
| 05 | Mobility Plan | 1 | CNTP+15 | |||||||||||
| 06 | Project Sign | 1 | CNTP+15 | |||||||||||
| 07 | Quality Control Plan | 1 | CNTP+15 | |||||||||||
| 08 | Environmental Protection Plan | 1 | CNTP+15 | |||||||||||
| 09 | DD Form 1354 | 1 | FI+15 | |||||||||||
| 10 | Waste & construction debris management | 1 | Final Inspection | |||||||||||
| 11 | As-Built drawings | 1 | FI+15 | |||||||||||
| 12 | Spatial Data | 1 | As Built+10 | |||||||||||
| 13 | Key Staff | 1 | CNTP+15 | |||||||||||
| 14 | Health and safety Plan | 1 | CNTP +15 | |||||||||||
| SECTION 01 11 02 | ||||||||||||||
| 15 | Work Phasing Plan | 1 | Commencement of work - 15 | |||||||||||
| 16 | Utilities shuto off Plan | 1 | Commencement of work - 15 | |||||||||||
| 17 | Salvage plan | 1 | CNTP + 15 | |||||||||||
| 18 | Operation & Maintenance (O&M) Manuals | 1 | FI + 15 | |||||||||||
| SECTION 02 41 00 | ||||||||||||||
| 19 | Existing Conditions | 1 | ||||||||||||
| 20 | Demolition and Deconstruction Plan | 1 | ||||||||||||
| 21 | Receipts | 1 | ||||||||||||
| 22 | Waste Management Plan | 1 | ||||||||||||
| 23 | Waste Manager for Demolition and Construction | 1 | ||||||||||||
| 24 | Authorized dump or Treatment and Recovery Plant | 1 | ||||||||||||
| 25 | Delivery and disposal Certificate of Waste from Construction and Demolition | 1 | ||||||||||||
| SECTION 03 30 00 | ||||||||||||||
| 26 | Reinforcing steel. Identification marking | 1 | 1 | |||||||||||
| 27 | Reinforcement | 1 | ||||||||||||
| 28 | Concrete Data sheet | 1 | ||||||||||||
| 29 | Concrete mix design | 1 | 1 | |||||||||||
| 30 | Aggregates | 1 | ||||||||||||
| 31 | Compressive strength tests | 1 | ||||||||||||
| 32 | Unit weight of structural concrete | 1 | ||||||||||||
| 33 | Air Content | 1 | ||||||||||||
| 34 | Slump Tests | 1 | ||||||||||||
| 35 | Water | 1 | ||||||||||||
| 36 | Reinforcing Bars | 1 | ||||||||||||
| SECTION 03 41 33 | ||||||||||||||
| 37 | Fabrication Drawings | 1 | ||||||||||||
| 38 | Precast Concrete Hollow-Core Slab | 1 | ||||||||||||
| 39 | Precast concrete lintels | 1 | ||||||||||||
| 40 | Normal Weight Concrete | 1 | ||||||||||||
| 41 | Normal Weight Concrete Air Content | 1 | ||||||||||||
| 42 | Normal Weight Concrete Compressive Strenght | 1 | ||||||||||||
| 43 | Slump for Normal-Weight Concrete | 1 | ||||||||||||
| 44 | Moisture Content | 1 | ||||||||||||
| 45 | Design Mix | 1 | ||||||||||||
| 46 | Nondestructive Test | 1 | ||||||||||||
| 47 | Manufacturer Certificate | 1 | ||||||||||||
| 48 | Pretensioning Certificate | 1 | ||||||||||||
| 49 | Detensioning Certificate | 1 | ||||||||||||
| SECTION 04 20 00 | ||||||||||||||
| 50 | Manufacturer´s Catalog Data | 1 | ||||||||||||
| 51 | Layout Drawings for each thermoclay façade | 1 | 1 | |||||||||||
| 52 | Lintels in Masonry Walls | 1 | ||||||||||||
| 53 | Manufacturer´s certificates of compliance of INCE and AENOR | 1 | ||||||||||||
| SECTION 05 05 23. 16 | ||||||||||||||
| 54 | Welding Procedure Qualifications | 1 | ||||||||||||
| 55 | Welder, Welding Operator, and Tracker Qualification | 1 | ||||||||||||
| 56 | Welding Electrodes and Rods | 1 | ||||||||||||
| 57 | Certified Welder Performance Qualifications | 1 | ||||||||||||
| SECTION 05 12 00 | ||||||||||||||
| 58 | Shop Drawings | 1 | ||||||||||||
| 59 | Structural Calculations | 1 | ||||||||||||
| 60 | Shop Primer | 1 | ||||||||||||
| 61 | Welding Electrodes and Rods | 1 | ||||||||||||
| 62 | Non-shrink Grout | 1 | ||||||||||||
| 63 | Steel | 1 | ||||||||||||
| 64 | Bolts, Nuts, and Washers | 1 | ||||||||||||
| 65 | Galvanizing | 1 | ||||||||||||
| 66 | Structure Warranty | 1 | ||||||||||||
| SECTION 06 20 00 | ||||||||||||||
| 67 | Detail Drawings Indicating All Wood Assemblies | 1 | ||||||||||||
| 68 | Manufacturer´s Catalog Data and color chart | 1 | ||||||||||||
| 69 | Samples | 1 | ||||||||||||
| 70 | Manufacturer´s certificates of compliance of AENOR | 1 | ||||||||||||
| SECTION 07 05 23 | ||||||||||||||
| 71 | Work Plan | 1 | ||||||||||||
| 72 | Thermal Imaging Camera | 1 | ||||||||||||
| 73 | Design Data | 1 | ||||||||||||
| 74 | Envelope Surface Area Calculations | 1 | ||||||||||||
| 75 | Pressure Test Agency | 1 | ||||||||||||
| 76 | Thermographer Qualifications | 1 | ||||||||||||
| 77 | Test Instruments | 1 | ||||||||||||
| 78 | Date Of Last Calibration | 1 | ||||||||||||
| 79 | Pressure Test Procedures | 1 | ||||||||||||
| 80 | Air Leakage Test Report | 1 | ||||||||||||
| 81 | Diagnostic Test Report | 1 | ||||||||||||
| SECTION 07 13 53 | ||||||||||||||
| 82 | Manufacturer´s Standard Details | 1 | ||||||||||||
| 83 | Elastometric Waterproofing Sheet Material | 1 | ||||||||||||
| 84 | Final Special Warranties | 1 | ||||||||||||
| 85 | Certificates of Compliance AENOR / CE | 1 | ||||||||||||
| SECTION 07 21 13 | ||||||||||||||
| 86 | Board Insulation | 1 | ||||||||||||
| 87 | Air Barrier Coating | 1 | ||||||||||||
| 88 | Seam tape | 1 | ||||||||||||
| 89 | Protection Board Insulation or coating | 1 | ||||||||||||
| 90 | Air-tight sealant/pipes/ducts | 1 | ||||||||||||
| 91 | Sealing sleeves for conduits | 1 | ||||||||||||
| 92 | Board Insulation | 1 | ||||||||||||
| 93 | Adhesive | 1 | ||||||||||||
| 94 | Certified Passive House Tradesperson Installer Qualifications | 1 | ||||||||||||
| SECTION 07 22 00 | ||||||||||||||
| 95 | Roof Insulation | 1 | ||||||||||||
| 96 | Fasteners | 1 | ||||||||||||
| 97 | Air Barrier Coating | 1 | ||||||||||||
| 98 | Fall Arresting System | 1 | 1 | 1 | ||||||||||
| 99 | Roof Insulation | 1 | ||||||||||||
| 100 | Nails and Fasteners | 1 | ||||||||||||
| 101 | Certified Passive House Tradesperson Installer Qualifications | 1 | ||||||||||||
| SECTION 07 32 13 | ||||||||||||||
| 102 | Clay tile Roofing Systems | 1 | 1 | 1 | ||||||||||
| 103 | Vapor Barrier | 1 | ||||||||||||
| 104 | Clay Roofing tile | 1 | ||||||||||||
| 105 | Materials | 1 | ||||||||||||
| 106 | Qualifications of roofing personnel | 1 | ||||||||||||
| SECTION 07 92 00 | ||||||||||||||
| 107 | Sealants | 1 | 1 | 1 | ||||||||||
| 108 | Primers | 1 | 1 | 1 | ||||||||||
| 109 | Bond Breakers | 1 | 1 | 1 | ||||||||||
| SECTION 08 14 00 | ||||||||||||||
| 110 | Wood doors Manufacturer | 1 | ||||||||||||
| 111 | Drop-down Seal | 1 | 1 | 1 | ||||||||||
| SECTION 08 51 13 | ||||||||||||||
| 112 | Aluminum windows and doors Manufacturer´s Catalog Data | 1 | 1 | |||||||||||
| 113 | Certified Passive House Tradesperson Installer Qualifications | 1 | ||||||||||||
| 114 | Color | 1 | ||||||||||||
| 115 | ||||||||||||||
| SECTION 08 71 00 | ||||||||||||||
| 115 | Hardware Items | 1 | ||||||||||||
| 116 | Installation of door hardware | 1 | ||||||||||||
| SECTION 08 81 00 | ||||||||||||||
| 117 | Manufacturer's descriptive product data | 1 | ||||||||||||
| 118 | Indulating Glass | 1 | ||||||||||||
| 119 | Setting and sealing materials | 1 | ||||||||||||
| 120 | Glass setting | 1 | ||||||||||||
| SECTION 09 24 23 | ||||||||||||||
| 121 | Plaster and Stucco | 1 | 1 | |||||||||||
| SECTION 09 29 00 | ||||||||||||||
| 122 | Gypsum/Cement boards | 1 | 1 | |||||||||||
| 123 | Suspension system | 1 | 1 | |||||||||||
| 124 | Registers | 1 | ||||||||||||
| 125 | Manufacturer's printed installation instructions | 1 | ||||||||||||
| 126 | Gypsum/Cement board ceilings | 1 | ||||||||||||
| 127 | Asbestos Free Materials | 1 | ||||||||||||
| SECTION 09 30 10 | ||||||||||||||
| 128 | Manufacturer's Catalog Data | 1 | ||||||||||||
| 129 | Porcelanic gres floor tile | 1 | ||||||||||||
| 130 | Non-slip Porcelanic gres floor tile | 1 | ||||||||||||
| 131 | Ceramic wall tile | 1 | ||||||||||||
| SECTION 09 90 00 | ||||||||||||||
| 132 | Coating | 1 | ||||||||||||
| 133 | Manufacturer´s Technical Data Sheets (paint) | 1 | ||||||||||||
| 134 | Sealant | 1 | ||||||||||||
| 135 | Color | 1 | ||||||||||||
| 136 | Application instructions | 1 | ||||||||||||
| 137 | Manufacturer's Instructions Mixing | 1 | ||||||||||||
| 138 | Manufacturer's Material Safety Data Sheets for coatings, solvents and hazardous materials | 1 | ||||||||||||
| 139 | Paints and Coatings Delivery Notes | 1 | ||||||||||||
| SECTION 10 28 13 | ||||||||||||||
| 140 | Wash basin and accessories | 1 | ||||||||||||
| 141 | WC bowl and accessories | 1 | ||||||||||||
| 142 | Bath tub and accessories | 1 | ||||||||||||
| 143 | Shower soap holder | 1 | ||||||||||||
| 144 | Kitchen sink and accessories | 1 | ||||||||||||
| 145 | Service sink and accessories | 1 | ||||||||||||
| 146 | Robe hook | 1 | ||||||||||||
| 147 | Mirrors | 1 | ||||||||||||
| 148 | Toilet paper dispenser | 1 | ||||||||||||
| 149 | Water savings devices | 1 | ||||||||||||
| 150 | Faucets | 1 | ||||||||||||
| 150 | Glass Front partitions | 1 | ||||||||||||
| 151 | Heated Towel rail | 1 | ||||||||||||
| SECTION 12 21 00 | ||||||||||||||
| 152 | Window blinds | 1 | 1 | 1 | 1 | |||||||||
| 153 | Drawer for insulated folding blind | 1 | ||||||||||||
| SECTION 21 13 13 | ||||||||||||||
| 154 | Automatic sprinklers | 1 | ||||||||||||
| 155 | Piping and accessories | 1 | ||||||||||||
| 156 | Pipe hangers and supports | 1 | ||||||||||||
| 157 | Fire Riser | 1 | ||||||||||||
| 158 | Backflow preventer | 1 | ||||||||||||
| 159 | Gate Valve | 1 | ||||||||||||
| 160 | Sprinklers | 1 | ||||||||||||
| 161 | Piping | 1 | ||||||||||||
| 162 | Qualifications of installer | 1 | ||||||||||||
| 163 | Designer's Certificate of Competence | 1 | ||||||||||||
| 164 | Inspection by Specialized Fire Prevention Engineer | 1 | ||||||||||||
| 165 | Sprinkler system hydraulic calculation | 1 | ||||||||||||
| 166 | Shop drawings | 1 | ||||||||||||
| 167 | As-built drawings | 1 | ||||||||||||
| SECTION 22 00 00 | ||||||||||||||
| 168 | High-density polyethylene piping | 1 | ||||||||||||
| 169 | Cross-linked polyethilene piping | 1 | ||||||||||||
| 170 | Cooper piping | 1 | ||||||||||||
| 171 | Accessories for polyethylene pipe connections | 1 | ||||||||||||
| 172 | Domestic Hot Water recirculation pump | 1 | ||||||||||||
| 173 | Valves and accesories | 1 | ||||||||||||
| 174 | System related components (Thermometer, temperature probe, manometer, expansion tank, anti-vibration sleeve, filter) | 1 | ||||||||||||
| 175 | Reduced Pressure Backflow Preventer | 1 | ||||||||||||
| 176 | Floor Drain | 1 | ||||||||||||
| 177 | Rigid PVC piping | 1 | ||||||||||||
| 178 | Plumbing System Supports | 1 | ||||||||||||
| SECTION 22 33 30.00 10 | ||||||||||||||
| 179 | Pipe installation | 1 | ||||||||||||
| 180 | Collector support system | 1 | ||||||||||||
| 181 | Solar collectors | 1 | ||||||||||||
| 182 | Pump Station | 1 | ||||||||||||
| 183 | Solar Exchanger Kit | 1 | ||||||||||||
| 184 | Hot water tank | 1 | ||||||||||||
| 185 | Operation & Maintenance (O&M) Procedures. Solar system | 1 | ||||||||||||
| SECTION 23 07 00 | ||||||||||||||
| 186 | Domestic cold-water piping insulation | 1 | ||||||||||||
| 187 | Domestic hot water piping insulation | 1 | ||||||||||||
| 188 | Heat pump water piping insulation | 1 | ||||||||||||
| 189 | Solar system piping insulation | 1 | ||||||||||||
| 190 | HVAC Duct insulation | 1 | ||||||||||||
| SECTION 23 30 00 | ||||||||||||||
| 191 | Sheet metal rectangular ducts | 1 | ||||||||||||
| 192 | Circular flexible ductwork | 1 | ||||||||||||
| 193 | Linear Diffusers | 1 | ||||||||||||
| 194 | Supply/Return grilles | 1 | ||||||||||||
| 195 | Fan Coil Unit | 1 | ||||||||||||
| 196 | Mechanical Ventilation with Heat Recovery Unit | 1 | ||||||||||||
| 197 | Motorized Volume Dampers | 1 | ||||||||||||
| 198 | Control System | 1 | ||||||||||||
| 199 | Pipes | 1 | ||||||||||||
| 200 | Hydrobox heatpump and components | 1 | ||||||||||||
| 201 | Supply/return ducts for air handling units | 1 | ||||||||||||
| 202 | Duct supports and seismic bracing if required | 1 | ||||||||||||
| 203 | Control Diagrams of air conditioning system | 1 | ||||||||||||
| 204 | Performance Tests | 1 | ||||||||||||
| 205 | Testing, adjusting and balancing of air conditioning systems | 1 | ||||||||||||
| 206 | Manufacturers Representative Certificate | 1 | ||||||||||||
| SECTION 26 20 00 | ||||||||||||||
| 207 | Rigid Metal Conduit and fittings | 1 | ||||||||||||
| 208 | Electrical Metal Tubing | 1 | ||||||||||||
| 209 | Flexible Nonmetal conduits | 1 | ||||||||||||
| 210 | Flexible Metal Conduit | 1 | ||||||||||||
| 211 | Junction and pull boxes | 1 | ||||||||||||
| 212 | Receptacles | 1 | ||||||||||||
| 213 | Switches (All types) | 1 | ||||||||||||
| 214 | Wires and cables | 1 | ||||||||||||
| 215 | Circuit breakers | 1 | ||||||||||||
| 216 | Panelboards Switchboards and meter enclosures | 1 | ||||||||||||
| 217 | Panel boards | 1 | 1 | 1 | ||||||||||
| 218 | Meters | 1 | ||||||||||||
| 219 | Wiring diagram | 1 | ||||||||||||
| 220 | Devices Subject to Manual Operation | 1 | ||||||||||||
| 221 | 1000-Volt Wiring Test | 1 | ||||||||||||
| 222 | Grounding System Test | 1 | ||||||||||||
| 223 | Motor Louvers | 1 | ||||||||||||
| 224 | Grounding system. Grounding bars, Ring, busbar and Test Wells | 1 | ||||||||||||
| 225 | Electrical system O&M Manuals | 1 | ||||||||||||
| SECTION 26 51 00 | ||||||||||||||
| 226 | Local LED Luminaires | 1 | 1 | 1 | ||||||||||
| 227 | USA LED Luminaires | 1 | 1 | 1 | ||||||||||
| 228 | Luminaire Light Sources | 1 | ||||||||||||
| 229 | LED drivers | 1 | ||||||||||||
| 230 | LED Luminaires and Occupancy Vacancy sensor/dimmer control scene | 1 | 1 | |||||||||||
| 231 | Luminaires Useful Life | 1 | ||||||||||||
| 232 | Spare Part Delivery | 1 | ||||||||||||
| 233 | Occupancy Sensor Coverage | 1 | ||||||||||||
| SECTION 26 56 00 | ||||||||||||||
| 234 | LED Luminaires, Luminaire Light Sources, Lighting contactor, Motion sensor | 1 | ||||||||||||
| 235 | Led Luminaires and Motion sensor | 1 | ||||||||||||
| 236 | Led Luminaires and Spare Part Delivery | 1 | ||||||||||||
| 237 | Led Luminaires | 1 | ||||||||||||
| SECTION 27 10 00 | ||||||||||||||
| 238 | Communication Rack Closet Layout | 1 | ||||||||||||
| 239 | Pre-installation of satellite. Sleeve plugged and chimney detail | 1 | ||||||||||||
| 240 | Telecommunication cabling | 1 | ||||||||||||
| 241 | Patch Panel | 1 | ||||||||||||
| 242 | Telecommunication outlet/connector assemblies | 1 | ||||||||||||
| 243 | Cable tray | 1 | ||||||||||||
| 244 | Telecommunications cabling testing | 1 | ||||||||||||
| SECTION 28 31 00 | ||||||||||||||
| 245 | Smoke Detector | 1 | ||||||||||||
| 246 | Manufacturer instructions | 1 | ||||||||||||
| 247 | Fire Alarm system | 1 | ||||||||||||
| SECTION 31 00 00 | ||||||||||||||
| 248 | Artificial Graded-Aggregate | 1 | ||||||||||||
| SECTION 32 03 30 | ||||||||||||||
| 249 | Tolerable soil identification (embankment foundation) | 1 | ||||||||||||
| 250 | Selected soil origin control (embankment core) | 1 | ||||||||||||
| 251 | Tolerable soil test section | 1 | 1 | |||||||||||
| 252 | Selected soil test section | 1 | 1 | |||||||||||
| 253 | Finished Surface of Tolerable Soil and Pavement | 1 | ||||||||||||
| 254 | Tolerable soil acceptance control | 1 | 1 | |||||||||||
| 255 | Selected soil acceptance control | 1 | 1 | |||||||||||
| SECTION 32 04 22 | ||||||||||||||
| 256 | Geotextile | 1 | 1 | 1 | 1 | |||||||||
| 257 | Execution control | 1 | 1 | |||||||||||
| SECTION 32 05 10 | ||||||||||||||
| 258 | Aggregates origin control | 1 | 1 | 1 | ||||||||||
| 259 | Job mix formula | 1 | ||||||||||||
| 260 | Test section | 1 | 1 | |||||||||||
| 261 | Acceptance control | 1 | ||||||||||||
| SECTION 32 05 12 | ||||||||||||||
| 262 | Underlaying surface | 1 | ||||||||||||
| 263 | Water | 1 | ||||||||||||
| 264 | Cement origin control | 1 | 1 | 1 | ||||||||||
| 265 | Soil origin control | 1 | 1 | |||||||||||
| 266 | Job Mix Formula | 1 | ||||||||||||
| 267 | Test section | 1 | 1 | |||||||||||
| 268 | Execution control | 1 | 1 | |||||||||||
| 269 | Acceptance control | 1 | ||||||||||||
| SECTION 32 05 30 | ||||||||||||||
| 270 | Existing surface | 1 | ||||||||||||
| 271 | Prime coat origin control | 1 | 1 | 1 | 1 | 1 | ||||||||
| 272 | Coverage aggregate origin control | 1 | 1 | 1 | 1 | |||||||||
| 273 | Prime coat application rate to be applied | 1 | ||||||||||||
| 274 | Coverage aggregate application rate to be placed | 1 | ||||||||||||
| 275 | Execution control | 1 | 1 | |||||||||||
| SECTION 32 05 31 | ||||||||||||||
| 276 | Tack coat origin control | 1 | 1 | 1 | 1 | 1 | ||||||||
| 277 | Tack coat application rate to be applied | 1 | ||||||||||||
| 278 | Execution control | 1 | 1 | |||||||||||
| 279 | Acceptance control | 1 | 1 | |||||||||||
| SECTION 32 05 32 | ||||||||||||||
| 280 | Curing coat origin control | 1 | 1 | 1 | 1 | 1 | ||||||||
| 281 | Coverage aggregate origin control | 1 | 1 | 1 | 1 | |||||||||
| 282 | Curing coat application rate to be applied | 1 | ||||||||||||
| 283 | Coverage aggregate application rate to be placed | 1 | ||||||||||||
| 284 | Execution control | 1 | ||||||||||||
| SECTION 32 05 42 | ||||||||||||||
| 285 | Control of origin of the Bitumen | 1 | 1 | |||||||||||
| 286 | Control of origin of the aggregates | 1 | 1 | |||||||||||
| 287 | Control of origin of the filler | 1 | 1 | |||||||||||
| 288 | Production plant | 1 | ||||||||||||
| 289 | Job mix formula | 1 | ||||||||||||
| 290 | Test section | 1 | 1 | |||||||||||
| 291 | Paving plan | 1 | ||||||||||||
| 292 | Production control | 1 | 1 | |||||||||||
| 293 | Placement and compaction control | 1 | ||||||||||||
| 294 | Acceptance control | 1 | ||||||||||||
| SECTION 32 07 01 | ||||||||||||||
| 295 | CE Certification of the Sign | 1 | ||||||||||||
| 296 | Signing System, workes, materials and equipment | 1 | ||||||||||||
| SECTION 32 16 19 | ||||||||||||||
| 297 | Concrete | 1 | ||||||||||||
| 298 | Field Quality control | 1 | ||||||||||||
| SECTION 32 17 23 | ||||||||||||||
| 299 | Painting CE certification | 1 | ||||||||||||
| 300 | CE certification of the glass microsphere | 1 | ||||||||||||
| 301 | Signing system | 1 | 1 | |||||||||||
| 302 | Tests of verification | 1 | ||||||||||||
| SECTION 32 92 19 | ||||||||||||||
| 303 | Topsoil Composition | 1 | ||||||||||||
| 304 | Wood Cellulose Fiber Mulch | 1 | ||||||||||||
| 305 | Fertilizer | 1 | ||||||||||||
| 306 | Topsoil Composition Tests | 1 | ||||||||||||
| SECTION 32 93 00 | ||||||||||||||
| 307 | Time Restrictions and Planting Conditions | 1 | ||||||||||||
| 308 | Dates and locations for each type of planting | 1 | ||||||||||||
| 309 | Local / Regional Materials | 1 | ||||||||||||
| 310 | Peat | 1 | ||||||||||||
| 311 | Composted Derivatives | 1 | ||||||||||||
| 312 | Organic Mulch Materials | 1 | ||||||||||||
| 313 | Gypsum | 1 | ||||||||||||
| 314 | Mulch | 1 | ||||||||||||
| 315 | Ground Stakes | 1 | ||||||||||||
| 316 | Fertilizer | 1 | ||||||||||||
| 317 | Staking Material | 1 | ||||||||||||
| 318 | Antidesiccants | 1 | ||||||||||||
| 319 | Backyard Fence | 1 | ||||||||||||
| 320 | Topsoil Composition Tests | 1 | ||||||||||||
| 321 | Percolation Test | 1 | ||||||||||||
| 322 | Nursery Certifications | 1 | ||||||||||||
| SECTION 33 30 00 | ||||||||||||||
| 323 | PVC pipe and fittings | 1 | ||||||||||||
| 324 | Round manhole (more than 1,2m depth) | 1 | ||||||||||||
| 325 | Round manhole frame and cover | 1 | ||||||||||||
| 326 | Sewer pipe protection film and sealant | 1 | ||||||||||||
| 327 | Modular register manhole | 1 | ||||||||||||
| 328 | Register manhole cover | 1 | ||||||||||||
| 329 | Plan and topographic profile for new pipe | 1 | ||||||||||||
| SECTION 33 40 00 | ||||||||||||||
| 330 | Post-Installation Inspection Report | 1 | ||||||||||||
| 331 | Precast Concrete Curb Line | 1 | ||||||||||||
| 332 | Lineal Drain Channel | 1 | ||||||||||||
| 333 | Joint Sealant | 1 | ||||||||||||
| 334 | Drainage Handholes | 1 | ||||||||||||
| 335 | Catch Basin | 1 | ||||||||||||
| 336 | French Drainage Pipe and components | 1 | ||||||||||||
| 337 | Drainage System accessories | 1 | ||||||||||||
| SECTION 33 71 02 | ||||||||||||||
| 338 | Precast underground structures | 1 | ||||||||||||
| 339 | Precast concrete structures | 1 | ||||||||||||
| 340 | Manhole frames and covers | 1 | ||||||||||||
| 341 | Conduits and spacers | 1 | ||||||||||||
| 342 | Cables and conductors | 1 | ||||||||||||
| 343 | Warning and identification tape | 1 | ||||||||||||
| 344 | Field Acceptance Checks and Tests | 1 | ||||||||||||
| 345 | Manhole Certificate | 1 | ||||||||||||
| 346 | Warning tape | 1 | ||||||||||||
| SECTION 33 82 00 | ||||||||||||||
| 347 | Conduits | 1 | ||||||||||||
| 348 | Manholes | 1 |
&"Arial,Negrita"&8QUUG 06-4001. 100%DESIGN SUBMITTAL Schedule of Material Submittals, March 2021 Page &P of &N
Resumen Muestras de Mat. (ESP)
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | ||
| QUUG 06-4001 | TÍTULO DE PROYECTO: |
RPL MFH COMMAND UNITS
SOLICITACIÓN / CONTRATO NO.
FA557520F0006
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 01 | ||||||||||||||
| 01 | Carta de garantía | 1 | Antes de Inspección final (IF) | |||||||||||
| 02 | Plan de obra | 1 | CNTP+7 | |||||||||||
| 03 | Programa de avance de obras | 1 | CNTP+10 | |||||||||||
| 04 | Plan de obra | 1 | CNTP+7 | |||||||||||
| 05 | Plan de movilización | 1 | CNTP+15 | |||||||||||
| 06 | Cartel de proyecto | 1 | CNTP+15 | |||||||||||
| 07 | Plan de control de calidad | 1 | CNTP+15 | |||||||||||
| 08 | Plan de protección medioambiental | 1 | CNTP+15 | |||||||||||
| 09 | Formularino DD 1354 | 1 | Inspección Final + 15 | |||||||||||
| 10 | Certificado de gestión de residuos y escombros | 1 | Antes de Inspección final (IF) | |||||||||||
| 11 | Planos As-Builts | 1 | Inspección Final + 15 | |||||||||||
| 12 | Datos espaciales | 1 | Antes de Inspección final (IF), tras la aprobación de as-builts + 10 | |||||||||||
| 13 | Personal Clave | 1 | CNTP+15 | |||||||||||
| 14 | Plan de salud y seguridad | 1 | CNTP+15 | |||||||||||
| SECCIÓN 01 11 02 | ||||||||||||||
| 15 | Plan de Fases del Trabajo | 1 | Comienzo de los Trabajos - 15 | |||||||||||
| 16 | Plan de cortes de suministros | 1 | Comienzo de los Trabajos - 15 | |||||||||||
| 17 | Plan de recuperación | 1 | CNTP + 15 | |||||||||||
| 18 | Manuales de Operación y Mantenimiento | 1 | Antes de Inspección final (IF) + 15 | |||||||||||
| SECCIÓN 02 41 00 | ||||||||||||||
| 19 | Condiciones Existentes | 1 | ||||||||||||
| 20 | Plan de Demoliciones y Desmontaje | 1 | ||||||||||||
| 21 | Comprobantes de Recepción (Alboranes) | 1 | ||||||||||||
| 22 | Plan de Gestión de Residuos | 1 | ||||||||||||
| 23 | Gestor de Residuos de Demolición y Construcción | 1 | ||||||||||||
| 24 | Vertedero Autorizado o Planta de Tratamiento y Recuperación | 1 | ||||||||||||
| 25 | Certificado de Entregas y Eliminación de Residuos de Construcción y Demolición | 1 | ||||||||||||
| SECCIÓN 03 30 00 | ||||||||||||||
| 26 | Refuerzos de acero. Marca de identificaicón | 1 | 1 | |||||||||||
| 27 | Armaduras | 1 | ||||||||||||
| 28 | Ficha de Hormigón | 1 | ||||||||||||
| 29 | Diseño de la mezcla de hormigón | 1 | 1 | |||||||||||
| 30 | Agregados | 1 | ||||||||||||
| 31 | Pruebas de resistencia a compresión | 1 | ||||||||||||
| 32 | Peso unitario del hormigón estructural | 1 | ||||||||||||
| 33 | Contenido de aire | 1 | ||||||||||||
| 34 | Pruebas de consistencia | 1 | ||||||||||||
| 35 | Agua | 1 | ||||||||||||
| 36 | Armaduras de refuerzo | 1 | ||||||||||||
| SECTION 03 41 33 | ||||||||||||||
| 37 | Planos de fabricación | 1 | ||||||||||||
| 38 | Placa Alveolar de Hormigón Prefabricada | 1 | ||||||||||||
| 39 | Dinteles prefabricados de Hormigón | 1 | ||||||||||||
| 40 | Hormigón de peso normal | 1 | ||||||||||||
| 41 | Contenido del aire de hormigón de Peso Normal | 1 | ||||||||||||
| 42 | Resistencia a la Compresión de Hormigón de Peso Normal | 1 | ||||||||||||
| 43 | Prueba de Asentamiento de Hormigón de Peso Normal | 1 | ||||||||||||
| 44 | Contenido de Humedad | 1 | ||||||||||||
| 45 | Mezcla de Diseño | 1 | ||||||||||||
| 46 | Pruebas no Destructivas | 1 | ||||||||||||
| 47 | Certificado del Fabricante | 1 | ||||||||||||
| 48 | Certificado de Pretensado | 1 | ||||||||||||
| 49 | Certificado de Destensado | 1 | ||||||||||||
| SECCIÓN 04 20 00 | ||||||||||||||
| 50 | Datos del catálogo del fabricante | 1 | ||||||||||||
| 51 | Planos de replanteo de cada fachada de termoarcilla | 1 | 1 | |||||||||||
| 52 | Planos de taller de Dinteles en muros de albañilería | 1 | ||||||||||||
| 53 | Certificados de cumplimiento de los fabricantes del INCE y AENOR | 1 | ||||||||||||
| SECCIÓN 05 05 23. 16 | ||||||||||||||
| 54 | Calificaciones del Procedimiento de Soldadura | 1 | ||||||||||||
| 55 | Cualificación del soldador, Operador de Soldadura, | 1 | ||||||||||||
| 56 | Electrodos y Varillas de Soldadura | 1 | ||||||||||||
| 57 | Cualificaciones del Soldador Certificado | 1 | ||||||||||||
| SECCIÓN 05 12 00 | ||||||||||||||
| 58 | Planos de Taller | 1 | ||||||||||||
| 59 | Cálculos Estructurales | 1 | ||||||||||||
| 60 | Imprimación en Taller | 1 | ||||||||||||
| 61 | Electrodos y Varillas de Soldadura | 1 | ||||||||||||
| 62 | Mortero sin Retracción | 1 | ||||||||||||
| 63 | Acero | 1 | ||||||||||||
| 64 | Pernos, Tuercas y Arandelas | 1 | ||||||||||||
| 65 | Galvanizado | 1 | ||||||||||||
| 66 | Garantía de Estructura | 1 | ||||||||||||
| SECCIÓN 06 20 00 | ||||||||||||||
| 67 | Planos detallados que indiquen todos los ensamblajes de madera | 1 | ||||||||||||
| 68 | Datos del catálog del fabricante y carta de colores | 1 | ||||||||||||
| 69 | Muestras | 1 | ||||||||||||
| 70 | Certificados de cumplimiento AENOR fabricantes | 1 | ||||||||||||
| SECCIÓN 07 05 23 | ||||||||||||||
| 71 | Plan de trabajo | 1 | ||||||||||||
| 72 | Cámara termográfica | 1 | ||||||||||||
| 73 | Datos de diseño | 1 | ||||||||||||
| 74 | Cálculos del área de la superficie de envolvente | 1 | ||||||||||||
| 75 | Agencia de pruebas de presión | 1 | ||||||||||||
| 76 | Cualificaciones del termógrafo | 1 | ||||||||||||
| 77 | Instrumentos de prueba | 1 | ||||||||||||
| 78 | Fecha de la última calibración | 1 | ||||||||||||
| 79 | Procedimientos de prueba de presión | 1 | ||||||||||||
| 80 | Informe de la prueba de fugas de aire | 1 | ||||||||||||
| 81 | Informe de la prueba de diagnóstico | 1 | ||||||||||||
| SECCIÓN 07 13 53 | ||||||||||||||
| 82 | Detalles de los estándares del fabricante | 1 | ||||||||||||
| 83 | Lámina de impermeabilización elastométrica | 1 | ||||||||||||
| 84 | Garantías especiales finales | 1 | ||||||||||||
| 85 | Certificados de cumplimiento AENOR / CE | 1 | ||||||||||||
| SECCIÓN 07 21 13 | ||||||||||||||
| 86 | Panel de aislamiento | 1 | ||||||||||||
| 87 | Recubrimiento de la barrera de aire | 1 | ||||||||||||
| 88 | Cinta de cierre / sellado | 1 | ||||||||||||
| 89 | Panel de protección de aislamiento/Revestimiento | 1 | ||||||||||||
| 90 | Sellante Hermético | 1 | ||||||||||||
| 91 | Manguito sellante para paso de conductos/tuberías | 1 | ||||||||||||
| 92 | Panel de aislamiento | 1 | ||||||||||||
| 93 | Adhesivo | 1 | ||||||||||||
| 94 | Calificaciones del instalador Passive House Tradesperson certificado | 1 | ||||||||||||
| SECCIÓN 07 22 00 | ||||||||||||||
| 95 | Aislamiento de cubierta | 1 | ||||||||||||
| 96 | Fijaciones | 1 | ||||||||||||
| 97 | Recubrimiento de barrera al paso del aire | 1 | ||||||||||||
| 98 | Sistema anticaidas | 1 | 1 | 1 | ||||||||||
| 99 | Aislamiento de cubierta | 1 | ||||||||||||
| 100 | Clavos y fijaciones | 1 | ||||||||||||
| 101 | Calificaciones del instalador Passive House Tradesperson certificado | 1 | ||||||||||||
| SECCIÓN 07 32 13 | ||||||||||||||
| 102 | Sistemas de cubierta de teja cerámica | 1 | 1 | 1 | ||||||||||
| 103 | Barrera de vapor | 1 | ||||||||||||
| 104 | Teja cerámica | 1 | ||||||||||||
| 105 | Materiales | 1 | ||||||||||||
| 106 | Cualificación del personal de cubierta | 1 | ||||||||||||
| SECCIÓN 07 92 00 | ||||||||||||||
| 107 | Sellantes | 1 | 1 | 1 | ||||||||||
| 108 | Imprimaciones | 1 | 1 | 1 | ||||||||||
| 109 | Antiadherentes | 1 | 1 | 1 | ||||||||||
| SECCIÓN 08 14 00 | ||||||||||||||
| 110 | Puertas de madera | 1 | ||||||||||||
| 111 | Burlete de guillotina | 1 | 1 | 1 | ||||||||||
| SECCIÓN 08 51 13 | ||||||||||||||
| 112 | Datos del catálogo del fabricante de ventanas de aluminio | 1 | ||||||||||||
| 113 | Calificaciones del instalador Passive House Tradesperson certificado | 1 | ||||||||||||
| 114 | Color | 1 | ||||||||||||
| SECCIÓN 08 71 00 | ||||||||||||||
| 115 | Artículos de cerrajería | 1 | ||||||||||||
| 116 | Instalación de herrajes de puertas | 1 | ||||||||||||
| SECCIÓN 08 81 00 | ||||||||||||||
| 117 | Datos descriptivos del fabricante del producto | 1 | ||||||||||||
| 118 | Vidrio aislante | 1 | ||||||||||||
| 119 | Materiales de fijación y sellado | 1 | ||||||||||||
| 120 | Instalación del vidrio | 1 | ||||||||||||
| SECCIÓN 09 24 23 | ||||||||||||||
| 121 | Yeso y Estuco | 1 | 1 | |||||||||||
| SECCIÓN 09 29 00 | ||||||||||||||
| 122 | Paneles de yeso/cemento | 1 | 1 | |||||||||||
| 123 | Sistema de suspensión | 1 | 1 | |||||||||||
| 124 | Registros | 1 | ||||||||||||
| 125 | Instrucciones de instalación impresas del fabricante | 1 | ||||||||||||
| 126 | Techos de placas de yeso/cemento | 1 | ||||||||||||
| 127 | Materiales libres de asbesto | 1 | ||||||||||||
| SECCIÓN 09 30 10 | ||||||||||||||
| 128 | Datos del catálogo del fabricante | 1 | ||||||||||||
| 129 | Baldosas de gres porcelánico para suelo | 1 | ||||||||||||
| 130 | Baldosas de gres porcelánico para suelo antideslizante | 1 | ||||||||||||
| 131 | Revestimiento cerámico para pared | 1 | ||||||||||||
| SECCIÓN 09 90 00 | ||||||||||||||
| 132 | Revestimientos | 1 | ||||||||||||
| 133 | Fichas de Datos técnicos del fabricante (pintura) | 1 | ||||||||||||
| 134 | Sellante | 1 | ||||||||||||
| 135 | Color | 1 | ||||||||||||
| 136 | Instrucciones de aplicación | 1 | ||||||||||||
| 137 | Instrucciones del fabricante de la mezcla | 1 | ||||||||||||
| 138 | Hojas de Datos de Seguridad del Material del Fabricante para recubrimientos, disolventes y materiales peligrosos | 1 | ||||||||||||
| 139 | Albaranes de entrega de pinturas y recubrimientos | 1 | ||||||||||||
| SECTION 10 28 13 | ||||||||||||||
| 140 | Lavabo y Accesorios | 1 | ||||||||||||
| 141 | WC y accesorios | 1 | ||||||||||||
| 142 | Bañera y accesorios | 1 | ||||||||||||
| 143 | Ducha y sujeta jabón | 1 | ||||||||||||
| 144 | Fregadero de Cocina y accesorios | 1 | ||||||||||||
| 145 | Fregadero de Servicio y accesorios | 1 | ||||||||||||
| 146 | Colgadores | 1 | ||||||||||||
| 147 | Espejos | 1 | ||||||||||||
| 148 | Dispensador de papel higiénico | 1 | ||||||||||||
| 149 | Elementos de ahorro de agua | 1 | ||||||||||||
| 150 | Grifería | 1 | ||||||||||||
| 150 | Particiones frontales de vidrio | 1 | ||||||||||||
| 151 | Toallero eléctrico | 1 | ||||||||||||
| SECCIÓN 12 21 00 | ||||||||||||||
| 152 | Persianas | 1 | 1 | 1 | 1 | |||||||||
| 153 | Cajón para persiana replegable aislado | 1 | ||||||||||||
| SECCIÓN 21 13 13 | ||||||||||||||
| 154 | Rociadores automáticos | 1 | ||||||||||||
| 155 | Tuberías y accesorios | 1 | ||||||||||||
| 156 | Colgadores y soportes de tuberías | 1 | ||||||||||||
| 157 | Riser de contraincendios | 1 | ||||||||||||
| 158 | Dispositivo de prevención de reflujo | 1 | ||||||||||||
| 159 | Vlavula de compuerta | 1 | ||||||||||||
| 160 | Rociadores | 1 | ||||||||||||
| 161 | Tuberías | 1 | ||||||||||||
| 162 | Cualificaciones del instalador | 1 | ||||||||||||
| 163 | Certificado de competencia del diseñador | 1 | ||||||||||||
| 164 | Inspección por parte de un ingeniero especializado en prevención de incendios | 1 | ||||||||||||
| 165 | Cálculo hidráulico del sistema de rociadores propuesto | 1 | ||||||||||||
| 166 | Planos de taller | 1 | ||||||||||||
| 167 | Planos As-Built | 1 | ||||||||||||
| SECCIÓN 22 00 00 | ||||||||||||||
| 168 | Tuberías de polietileno de alta densidad | 1 | ||||||||||||
| 169 | Tuberías de polietileno reticulado | 1 | ||||||||||||
| 170 | Tuberías de cobre | 1 | ||||||||||||
| 171 | Accesorios para conexiones de tuberías de polietileno | 1 | ||||||||||||
| 172 | Bomba de recirculación de agua caliente | 1 | ||||||||||||
| 173 | Válvulas y accesorios | 1 | ||||||||||||
| 174 | Accesorios y componentes relacionados del sistema de fontanería(Termómetro, sonda de temperatura, vaso de expansión, manguito antivibratorio, filtro)) | 1 | ||||||||||||
| 175 | Válvula antirretorno de principio de presión reducida | 1 | ||||||||||||
| 176 | Drenaje de suelo | 1 | ||||||||||||
| 177 | Tuberías de PVC rígidas | 1 | ||||||||||||
| 178 | Soporte de tuberías de fontanería | 1 | ||||||||||||
| SECTION 22 33 30.00 10 | ||||||||||||||
| 179 | Instalación de tuberías | 1 | ||||||||||||
| 180 | Sistema de soportación de captadores | 1 | ||||||||||||
| 181 | Captadores solares | 1 | ||||||||||||
| 182 | Estación de Bombeo | 1 | ||||||||||||
| 183 | Kit solar intercambiador (solar exchanger kit) | 1 | ||||||||||||
| 184 | Tanque de agua caliente | 1 | ||||||||||||
| 185 | Procedimientos de funcionamiento y mantenimiento. Sistema Solar | 1 | ||||||||||||
| SECCIÓN 23 07 00 | ||||||||||||||
| 186 | Aislamiento de las tuberías de agua fria sanitaria | 1 | ||||||||||||
| 187 | Aislamiento de las tuberías de agua caliente sanitaria | 1 | ||||||||||||
| 188 | Aislamiento de las tuberías de agua de la bomba de calor | 1 | ||||||||||||
| 189 | Aislamiento de las tuberías del sistema solar | 1 | ||||||||||||
| 190 | Aislamiento de los conductos de HVAC | 1 | ||||||||||||
| SECCIÓN 23 30 00 | ||||||||||||||
| 191 | Conductos metálicos rectangulares | 1 | ||||||||||||
| 192 | Conducto circular flexible | 1 | ||||||||||||
| 193 | Difusores lineales | 1 | ||||||||||||
| 194 | Rejillas de impulsión/rertorno | 1 | ||||||||||||
| 195 | Unidad Fan Coil | 1 | ||||||||||||
| 196 | Ventilación Mecánica con Unidades de Recuperación de Calor | 1 | ||||||||||||
| 197 | Compuertas reguladoras motorizadas | 1 | ||||||||||||
| 198 | Sistema de Control | 1 | ||||||||||||
| 199 | Tuberías | 1 | ||||||||||||
| 200 | Bomba de Calor Hydrobox y componentes | 1 | ||||||||||||
| 201 | Conductos de impulsión y retorno para las unidades de tratamiento de aire | 1 | ||||||||||||
| 202 | Soportes de conductos y arriostramientos si es necesario | 1 | ||||||||||||
| 203 | Diagramas de control del sistema de aire acondicionado | 1 | ||||||||||||
| 204 | Pruebas de Funcionamiento | 1 | ||||||||||||
| 205 | Prueba y equilibrado de los sistemas de aire acondicionado | 1 | ||||||||||||
| 206 | Certificado del representante del Fabricante | 1 | ||||||||||||
| SECCIÓN 26 20 00 | ||||||||||||||
| 207 | Conducto metálico Rígido | 1 | ||||||||||||
| 208 | Conducto Electrico Metalico | 1 | ||||||||||||
| 209 | Conducto Flexible No metalico | 1 | ||||||||||||
| 210 | Conducto flexible metalico | 1 | ||||||||||||
| 211 | Cajas de Registro | 1 | ||||||||||||
| 212 | Mecanismos eléctricos. Enchufes | 1 | ||||||||||||
| 213 | Mecanismos eléctricos.Interruptores (todos tipos) | 1 | ||||||||||||
| 214 | Hilos y Cables | 1 | ||||||||||||
| 215 | Disyuntores e interruptores | 1 | ||||||||||||
| 216 | Cuadros eléctricos, cajas de conexión y contadores | 1 | ||||||||||||
| 217 | Cuados eléctricos | 1 | 1 | 1 | ||||||||||
| 218 | Contadores | 1 | ||||||||||||
| 219 | Esquemas unifilares | 1 | ||||||||||||
| 220 | Dispositivos sujetos a operación Manual | 1 | ||||||||||||
| 221 | Prueba de Cableado de 1000 Voltios | 1 | ||||||||||||
| 222 | Prueba de puesta a tierra | 1 | ||||||||||||
| 223 | Motores de persiana | 1 | ||||||||||||
| 224 | Sistema de Puesta a Tierra. Picas de cobre, anillo de cobre, placas de interconexión y Pozos de inspección. | 1 | ||||||||||||
| 225 | Manual de Operación y Mantenimiento de Sistema Eléctrico | 1 | ||||||||||||
| SECCIÓN 26 51 00 | ||||||||||||||
| 226 | Luminarias LED locales | 1 | 1 | 1 | ||||||||||
| 227 | Luminarias LED USA | 1 | 1 | 1 | ||||||||||
| 228 | Fuentes de Luz de Luminarias | 1 | ||||||||||||
| 229 | Drivers Luminarias LED | 1 | ||||||||||||
| 230 | Sensores de Ocupación/Presencia y control de escena | 1 | 1 | |||||||||||
| 231 | Vida útil Luminarias LED | 1 | ||||||||||||
| 232 | Piezas de respuesto Luminarias LED | 1 | ||||||||||||
| 233 | Cobertura de Sensores de Ocupación | 1 | ||||||||||||
| SECCIÓN 26 56 00 | ||||||||||||||
| 234 | Luminarias LED, Fuentes de Luz de Luminarias, Contactor de Iluminación, y Sensores de Movim. | 1 | ||||||||||||
| 235 | Luminarias LED y Sensores de Movimiento | 1 | ||||||||||||
| 236 | Luminarias LED y Piezas de Repuesto | 1 | ||||||||||||
| 237 | Luminarias Led | 1 | ||||||||||||
| SECTION 27 10 00 | ||||||||||||||
| 238 | Distribución Rack de comunicaciones en armario | 1 | ||||||||||||
| 239 | Preinstalación de satélite.Detalle pasatubos y chimenea | 1 | ||||||||||||
| 240 | Cableado de telecomunicaciones | 1 | ||||||||||||
| 241 | Paneles de distribución | 1 | ||||||||||||
| 242 | Mecanismos de toma y conexión | 1 | ||||||||||||
| 243 | Bandejas de cables | 1 | ||||||||||||
| 244 | Prueba de cableado de telecomunicaciones | 1 | ||||||||||||
| SECCIÓN 28 31 00 | ||||||||||||||
| 245 | Detectores de humo | 1 | ||||||||||||
| 246 | Instrucciones del fabricante | 1 | ||||||||||||
| 247 | Sistema de alarma | 1 | ||||||||||||
| SECCIÓN 31 00 00 | ||||||||||||||
| 248 | Zahorra artificial | 1 | ||||||||||||
| SECCIÓN 32 03 30 | ||||||||||||||
| 249 | Identificación de suelo tolerable | 1 | ||||||||||||
| 250 | Control de procedencia del suelo seleccionado | 1 | ||||||||||||
| 251 | Tramo de prueba del suelo tolerable | 1 | 1 | |||||||||||
| 252 | Tramo de prueba del suelo seleccionado | 1 | 1 | |||||||||||
| 253 | Planta de la superficie de acabado del suelo tolerable y del pavimento | 1 | ||||||||||||
| 254 | Control de recepción de suelo tolerable | 1 | 1 | |||||||||||
| 255 | Control de recepción de suelo seleccionado | 1 | 1 | |||||||||||
| SECCIÓN 32 04 22 | ||||||||||||||
| 256 | Geotextil | 1 | 1 | 1 | 1 | |||||||||
| 257 | Control de ejecución | 1 | 1 | |||||||||||
| SECCIÓN 32 05 10 | ||||||||||||||
| 258 | Control de procedencia de los áridos | 1 | 1 | 1 | ||||||||||
| 259 | Fórmula de trabajo | 1 | ||||||||||||
| 260 | Tramo de prueba | 1 | 1 | |||||||||||
| 261 | Control de recepción | 1 | ||||||||||||
| SECCIÓN 32 05 12 | ||||||||||||||
| 262 | Superficie subyacente | 1 | ||||||||||||
| 263 | Agua | 1 | ||||||||||||
| 264 | Control de procedencia del cemento | 1 | 1 | 1 | ||||||||||
| 265 | Control de procedencia del suelo seleccionado | 1 | 1 | |||||||||||
| 266 | Fórmula de trabajo | 1 | ||||||||||||
| 267 | Tramo de prueba | 1 | 1 | |||||||||||
| 268 | Control de ejecución | 1 | 1 | |||||||||||
| 269 | Control de recepción | 1 | ||||||||||||
| SECCIÓN 32 05 30 | ||||||||||||||
| 270 | Superficie existente | 1 | ||||||||||||
| 271 | Control de procedencia del riego de imprimación | 1 | 1 | 1 | 1 | 1 | ||||||||
| 272 | Control de procedencia del árido de cobertura | 1 | 1 | 1 | 1 | |||||||||
| 273 | Dotación del riego de imprimación a aplicar | 1 | ||||||||||||
| 274 | Dotación del árido de cobertura a extender | 1 | ||||||||||||
| 275 | Control de ejecución | 1 | 1 | |||||||||||
| SECCIÓN 32 05 31 | ||||||||||||||
| 276 | Control de procedencia del riego de adherencia | 1 | 1 | 1 | 1 | 1 | ||||||||
| 277 | Dotación del riego de adherencia a aplicar | 1 | ||||||||||||
| 278 | Control de ejecución | 1 | 1 | |||||||||||
| 279 | Control de recepción | 1 | 1 | |||||||||||
| SECCIÓN 32 05 32 | ||||||||||||||
| 280 | Control de procedencia del riego de curado | 1 | 1 | 1 | 1 | 1 | ||||||||
| 281 | Control de procedencia del árido de cobertura | 1 | 1 | 1 | 1 | |||||||||
| 282 | Dotación del riego de curado a aplicar | 1 | ||||||||||||
| 283 | Dotación de árido de cobertura a extender | 1 | ||||||||||||
| 284 | Control de ejecución | 1 | ||||||||||||
| SECCIÓN 32 05 42 | ||||||||||||||
| 285 | Control de procedencia del betún | 1 | 1 | |||||||||||
| 286 | Control de procedencia de los áridos | 1 | 1 | |||||||||||
| 287 | Control de procedencia del polvo mineral | 1 | 1 | |||||||||||
| 288 | Central de fabricación | 1 | ||||||||||||
| 289 | Fórmula de trabajo | 1 | ||||||||||||
| 290 | Tramo de prueba | 1 | 1 | |||||||||||
| 291 | Plan de pavimentación | 1 | ||||||||||||
| 292 | Control de fabricación | 1 | 1 | |||||||||||
| 293 | Control de extensión y compactación | 1 | ||||||||||||
| 294 | Control de recepción | 1 | ||||||||||||
| SECTION 32 07 01 | ||||||||||||||
| 295 | Marcado CE de la señal | 1 | ||||||||||||
| 296 | Sistema de señalización, personal, materiales y maquinaria | 1 | ||||||||||||
| SECCIÓN 32 16 19 | ||||||||||||||
| 297 | Hormigón | 1 | ||||||||||||
| 298 | Control de Calidad de la Obra | 1 | ||||||||||||
| SECCIÓN 32 17 23 | ||||||||||||||
| 299 | Marcado CE de la pintura | 1 | ||||||||||||
| 300 | Marcado CE de la microesfera de vidrio | 1 | ||||||||||||
| 301 | Sistema de señalización | 1 | 1 | |||||||||||
| 302 | Ensayos de comprobación | 1 | ||||||||||||
| SECCIÓN 32 92 19 | ||||||||||||||
| 303 | Composición de la capa vegetal | 1 | ||||||||||||
| 304 | Lecho orgánico de fibra de celulosa | 1 | ||||||||||||
| 305 | Fertilizante | 1 | ||||||||||||
| 306 | Ensayos de la composición de la Capa Vegetal | 1 | ||||||||||||
| SECCIÓN 32 93 00 | ||||||||||||||
| 307 | Restricciones de tiempo y condiciones de plantación | 1 | ||||||||||||
| 308 | Fechas y lugares para cada tipo de plantación | 1 | ||||||||||||
| 309 | Materiales locales / regionales | 1 | ||||||||||||
| 310 | Turba | 1 | ||||||||||||
| 311 | Derivados compostados | 1 | ||||||||||||
| 312 | Materiales de mantillo orgánico | 1 | ||||||||||||
| 313 | Yeso | 1 | ||||||||||||
| 314 | Mantillo | 1 | ||||||||||||
| 315 | Estacas de suelo | 1 | ||||||||||||
| 316 | Fertilizante | 1 | ||||||||||||
| 317 | Material de plantación / siembra | 1 | ||||||||||||
| 318 | Antidesecantes | 1 | ||||||||||||
| 319 | Vallado del patio | 1 | ||||||||||||
| 320 | Pruebas de composición de la capa superior del suelo | 1 | ||||||||||||
| 321 | Prueba de percusión | 1 | ||||||||||||
| 322 | Certificados de viveros | 1 | ||||||||||||
| SECCIÓN 33 30 00 | ||||||||||||||
| 323 | Tuberías de PVC y accesorios | 1 | ||||||||||||
| 324 | Pozos de registro circulares mayores de 1.2m de profundidad | 1 | ||||||||||||
| 325 | Marcos y tapas de pozos de registro circulares | 1 | ||||||||||||
| 326 | Lámina de protección y sellante para tubería de saneamiento | 1 | ||||||||||||
| 327 | Arqueta de paso modular | 1 | ||||||||||||
| 328 | Tapa de arqueta | 1 | ||||||||||||
| 329 | Planta y perfil topográfico para instalación de nueva tubería | 1 | ||||||||||||
| SECCIÓN 33 40 00 | ||||||||||||||
| 330 | Informe de inspección posterior a la instalación | 1 | ||||||||||||
| 331 | Línea de bordillo de hormigón prefabricado | 1 | ||||||||||||
| 332 | Canalizaciones de drenaje lineal | 1 | ||||||||||||
| 333 | Sellante | 1 | ||||||||||||
| 334 | Arqueta de pluviales | 1 | ||||||||||||
| 335 | Imbornales | 1 | ||||||||||||
| 336 | Tubería Drain Francés | 1 | ||||||||||||
| 337 | Accesorios del sistema de drenaje | 1 | ||||||||||||
| SECCIÓN 33 71 02 | ||||||||||||||
| 338 | Estructuras subterráneas prefabricadas | 1 | ||||||||||||
| 339 | Estructuras de hormigón prefabricado | 1 | ||||||||||||
| 340 | Marcos y tapas de arquetas | 1 | ||||||||||||
| 341 | Conductos y espaciadores | 1 | ||||||||||||
| 342 | Cables y conductores | 1 | ||||||||||||
| 343 | Cinta de advertencia e identificación | 1 | ||||||||||||
| 344 | Comprobaciones y pruebas de aceptación de la obra | 1 | ||||||||||||
| 345 | Certificado de arquetas | 1 | ||||||||||||
| 346 | Cinta de señalización | 1 | ||||||||||||
| SECCIÓN 33 82 00 | ||||||||||||||
| 347 | Conductos | 1 | ||||||||||||
| 348 | Arquetas | 1 |
&"Arial,Negrita"&8QUUG 06-4001. 100%DESIGN SUBMITTAL Resumen de muestras de material, Marzo 2021 Página &P de &N