PERFORMANCE WORK STATEMENT

(PWS)

FOR

PROVIDE AND INSTALL BUNK BEDS,

LOCKERS AND MATTRESS AT TEN CITY

CIVIL ENGINEERING 496 ABS/CEORM

(6 March 2019)

PERFORMANCE WORK STATEMENT (PWS)

TABLE OF CONTENTS

SECTION PAGE

1. DESCRIPTION OF SERVICES 5

2. SERVICES SUMMARY 5

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES 5

4. GENERAL INFORMATION 6-8

5. APPENDICES

A. Existing conditions and site plan.

B. Bunk beds.

C. Lockers.

D. Mattress.

1. DESCRIPTION OF SERVICES. The contractor shall provide all tools, equipment and labor needed to provide and install bunk beds, lockers and mattress at the Tent City, Moron

Air Base.

1.1. Description of Work.

The work will consist of:

1.1.1. The site plan of the new equipment and photos of the existing conditions are indicated in Appendix A.

1.1.2. Disassembly and cleaning of existing equipment.

1.1.3. Supply and install 143 bunk beds according to the below table, the characteristics of the bunk beds are indicated in appendix B.

1.1.4. Supply and assembly of 143 lockers according to the below table, the characteristics of the lockers are indicated in appendix C.

1.1.5. Supply and installation of 286 mattresses according to the below table, the characteristics of the mattresses are indicated in appendix D.

1.1.6. Supply and installation of 296 mattress covers according to the below table, the characteristics of the mattress covers are indicated in appendix D.

Item A B C D E Total

Bunk Bed (Set) 32 32 32 32 10 138

Locker (Double) 32 32 32 32 10 138

Mattress 64 64 64 64 20 276

Mattress cover 64 64 64 64 20 276

Spare A B C D E Total

Bunk Bed (Set) 1 1 1 1 1 5

Locker (Double)s 1 1 1 1 1 5

Mattress 2 2 2 2 2 10

Mattress cover 4 4 4 4 4 20

Total

Bunk beds 143

Lockers 143

Mattress 286

Mattress cover 296

1.2. Brand Names.

Names indicated for materials are for the purpose of establishing a standard selection only.

Other manufacturers' materials are acceptable provided they conform to all specified requirements. Names indicated for the quality of model, give the quality standard to be achieved. Other manufacturer's materials are acceptable if it is equal to the quality and function of the suggested model. All selected material is subject to the approval of Contracting Officer.

1.3. Final Cleaning.

Final cleaning of installations affected by this contract

1.4. Period of Performance. The period of performance for this contract is fifteen (15) days at the site. The contractor shall provide its execution time with your proposal.

The items mentioned and the list of main tasks do not limit in any way the responsibility of the contractor to perform all work required by the contract to provide a complete and operational installation.

2. SERVICES SUMMARY.

Performance Objective SOW Performance Threshold

Activities. Par 1.1 100%

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

3.1. Use of Base Utilities: Base utilities are available to the Contactor at no additional expense to the Contractor. The following utilities shall be available from the existing Base utility connections in reasonable quantities:

a. Electricity 120/208 volts, 60 Hz.

b. Water.

All of the equipment, materials and labor required to accomplish the aforementioned items stipulated shall be supplied by the Contractor, as part of this contract.

4. GENERAL INFORMATION.

4.1. Security Requirements. The contractor will request installation access through 496

ABS/CE

4.2. Physical Security. The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, property, and materials shall be secured.

4.3. Hours of Operation.

4.3.1. Normal Hours of Operation. The contractor shall perform the services required under this contract during the following hours: Monday to Friday, 08:00-17:00. The contractor may work, with prior approval of the Contracting Officer, extended hours to ensure timely completion of work at no additional cost to the Government.

4.3.2. Recognized Holidays. The contractor is not required to provide service on the following days: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial

Day, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving

Day and Christmas Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

4.4. Conservation of Utilities. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following:

4.4.1. Lights shall be used only in areas where and when work is actually being performed.

4.4.2. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.

4.4.3. Water faucets or valves shall be turned off after the required use has been accomplished.

4.4.4. Government telephones shall be used only for official government business.

4.5. Records. The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this SOW.

4.6. Environmental Controls:

4.6.1. Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as result of the change, the contractor shall inform the Contracting Officer pursuant to notice requirements and negotiate a modification to the contract.

4.6.2. Notification of Environmental Spills. If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to Moron AB Fire Dept at 117. The liability for the spill or release of such substances rests solely with the contractor and its agent.

4.6.3. Material Storage and Use. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. This includes hazardous materials.

4.7. Government Observations. Government personnel, other than contracting officers (COs) and quality assurance personnel (QAPs), may from time-to-time, with CO coordination, observe contractor operations. However, these personnel may not interfere with contractor performance or make any changes to the contract.

4.8. Safety Requirements. In performing work under this contract, the contractor shall:

4.8.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.

4.8.2. Take such additional immediate precautions as the contracting officer may reasonably require for safety and mishap prevention purposes.

4.8.3. Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel.

4.8.4. Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.

4.8.5. Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.

4.8.6. Record and report promptly (within one hour) to the contracting officer or designated government representative (GR), all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.

4.8.7. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer.

4.8.8. If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.

4.8.9. Include a clause in each applicable subcontract requiring the subcontractor's cooperation and assistance in accident reporting and investigation.

4.9. Special Qualifications. The Contractor shall submit any commercial certifications and a reference of past performance on similar works performance to the existing as a means to verify experience in this field of work.

4.10. Continuation of Essential DOD Contractor Services During Crisis IAW DoDI 3020.37.

IAW AFI 63-124, para 2.7.1, and DODI 3020.37 this requirement is not considered mission essential.

4.11. Contract Restriction: In accordance with the Agreement of Defense and Cooperation between the Kingdom of Spain and the United States of America, any contract resulting from this notice/solicitation can only be entered into with companies authorized to carry out these activities in Spain under Spanish law. Companies must meet the requirements established by

Spanish legislation for execution of Government works. In addition, in accordance with the

Office of Defense Cooperation Policy Directive 400- 5 "(4) Spanish material, labor, and equipment must be used if permitted by the requirements of the contract specifications."

APPENDIX A

EXISTING CONDITIONS PICTURES AND SITE PLAN

APPENDIX B

BUNK BEDS

Bunk beds: With the following characteristics:

Manufactured with 50 mm diameter cylindrical steel tube.

Finished with epoxy paint, high resistance to impact, corrosion and oxidation, paint resistant to rust and baked in the oven.

Dark gray color.

With central bar of reinforcement in both bedsteads.

Dimensions 90x200x170 cm.

Curved and reinforced headboard.

Bedsteads of wooden boards with silent PVC connection.

Ladder of three steps.

The strength of each bed is 180 Kg.

APPENDIX C

LOCKERS

Lockers: With the following characteristics:

Painted steel sheet, cold rolled 0.8 mm thick.

Electrostatic painting of epoxy-polyester powder.

Interior reinforcements in 1.5 mm thick sheet metal.

Legs and lock with padlock.

Dimensions: 450x2: 900 mm.

Interior with two shelves and coat rack.

APPENDIX D

MATTRESS

Mattresses: With the following characteristics:

Dimensions 90x200x21 cm.

anti mite and fireproof.

Exterior:

Fireproof strech padding.

Silver certified strech.

Double edged strip sewn in perimeter.

Embroidered handles with butterfly reinforcement.

Interior:

According to the attached section.

Covers mattress made of flame-retardant fabric 100% Polyester, anti-mite, bed bugs, bacteria and fungi, according to UNE 597/1 and UNE 597/2.