QUUG-12-000005
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Purpose of this amendment is to incorporate corrections to solicitation FA57575-14-R-0013 sections L (Instruction to Offers) and M (Evaluation Factors).
Included in this amendment are the changes to section L and M along w ith Cost Estimate Breakdow n USAFE- QUUG-12-00005-01.
No other changes have been made to the specif ication or solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Jul-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5575-14-R-0013
X 9B. DATED (SEE ITEM 11)
20-Jun-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Jul-2014
CODE
496 ABS/LGC (FA5575)
UNIT 6585
APO AE 09643
FA5575 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5575-14-R-0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTAHCEMENTS
ATTACHMENTS
LIST OF DOCUMENTS
ATTACHMENT TITLE DATE NUMBER OF
NUMBER PAGES
1 SOO For Installation of Manhole/Duct Ssytem and Fiber 07 April 2014 61
Optic Cable to Core 4 Buildings Moron Air Base, Spain
2 Sketch 1-4 N/A 4
3 Past Performance Reference List (not part of the resultant N/A 1 contract)
4 Past Performance Questionnaires (not part of the resultant N/A 4 contract) 5 Cost Estimate Breakdown USAFE QUUG-12-000005-01 N/A 6
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
INSTRUCTION TO OFFERS
DEFINITIONS
As used in this solicitation/contract, the term “Government” shall refer to the “United States Government” unless express reference to a different named government is made. In addition, the words “ Federal, States and Municipal ” in the clause FAR 52.236-7, Permits and Responsibilities, are hereby modified to read “host government and its political subdivisions”.
DISCLOSURE OF MAGNITUDE
IAW FAR 36.204(e), the magnitude of this project is estimated between $100,000 and $250,000
US.
PROPOSAL PREPARATION
Offeror’s Technical Proposal will be evaluated as acceptable or unacceptable, focusing on how the offeror demonstrates the capability to meet the government’s requirements. The Technical Proposal will be used as an evaluation factor, as well as the offerors’ price and past performance, to assure best value to the government.
Offeror’s Past Performance Information, under existing and prior contracts for products or services will be evaluated as either acceptable or unacceptable, focusing on “Recency”, “Relevancy” and “Quality” of performance. The Past Performance Information will be used as an evaluation factor, as well as offerors’ price and technical acceptability, to assure best value to the government. References other than those identified by the offeror may be contacted by the government with or without information used in the evaluation received of the offeror’s past performance. Submit information on contracts that you consider relevant in demonstrating your ability to perform the proposed effort (See below paragraph c.(3). for Relevant Contracts).
Specific Instructions: The response shall consist of three (3) separately bound parts:
Part I – Price Proposal Part II – Technical Proposal Part III – Past Performance Information A. PART I – Price Proposal: Offerors shall include Section A, B, J and K in this part, and submit the proposal to arrive: See Standard Form 1442, Block 13.A.
(1) Section A – Complete blocks 14, 15, 19 (when any Amendment(s) to solicitation is issued), and 20 of the RFP Section A, Standard Form 1442. In doing so, the offeror agrees to the contract terms and conditions as written in the RFP, Sections A through K.
An individual with authority to contractually bind your company must sign the Standard Form 1442 in accordance with FAR 4.102.
(2) Section B – Insert the price(s) associated with the project as reference in Section B.
(3) Section K – Complete ALL the necessary fill-ins and required certifications and representations in their entirety.
Offerors shall include the “Cost Estimate Breakdown USAFE- QUUG-12-00005- 01.xlsx” file filled out with the partial costs for any different section in this document.
B. PART II – Technical Proposal – Offerors shall include the following documents to demonstrate technical capabilities:
(1) Submit the required the "Certificado de Instalador Autorizado de Telecomunicaciones para Fibra Optica" issued by the "Registro de Instaladores Autorizados de Telecomunicaciones" of the "Secretaria de Estado de Telecomunicaciones y para la Sociedad de la Informacion - Ministerio de Industria, Energia y Turismo". This work may be subcontracted in which case the subcontractor’s registration must be submitted with a letter of commitment to perform the work signed by both parties.
(2) Submit a Work Plan that shall present the sequence of the preconstruction, construction and finish tasks which are planned to take place. The Work Plan shall be prepared in coordination with the Safety Plan and the Quality Control Plan and shall contain the following items:
a. The summary of the proposed methodology for the execution of each task required for the project completion.
b. The resources to be used for the execution of each task required for the project completion describing the equipment and personnel to be used.
c. Daily production for each task required for the project completion.
(4) Submit a Construction Schedule that must include a Gantt chart showing each task, including its description, identification number, duration in calendar days, earliest start and finish dates and the predecessor activity identification number, the critical path and the float that a task in the project network can be delayed without causing a delay to the subsequent task (free float) and to the project completion date (total float). The critical path shall be shown in red color and the float by means of black line after the predecessor task bar.
The Construction Schedule shall show the whole week, from Monday through Sunday.
The labor days shall be from Monday through Friday. Saturday and Sunday shall be non-labor days. The holidays shall not be considered on the Construction Schedule and, therefore, they shall be considered labor days for Construction Schedule development purpose only. The working hours for the labor days shall be 8 hours.
The schedule must include activities associated with the submittal, approval, procurement, fabrication and delivery of long lead materials, equipment, fabricated assemblies and supplies, as well as activities associated with both pre-construction and close-out submittals, commissioning, testing and pre-final/final inspections, correction of punch lists, final cleaning, etc.
(5) Submit an organizational chart clearly showing proposed key personnel to include the Superintendent, the Quality Control Manager, Safety Manager and English Speaking Representative. The same individual cannot occupy more than one these positions, except for the Safety Manager.
a. Superintendent: The Superintendent must have the qualifications and experience necessary to adequately perform the job in accordance with the characteristics and complexity of the project. The superintendent must have as a minimum a university degree in Technical Engineering or Technical Architecture and at least 5 years experience managing similar projects.
b. Quality Control Manager: The Quality Control Manager must have as a minimum a university degree in Technical Engineering or Technical Architecture and at least 5 years experience as Quality Control Manager on similar projects.
c. Safety Manager: The Safety Manager shall be present at the work site at all times during works to perform duties as stated in the Safety plan. The Safety Manager must have a 60 hours minimum Basic Level Occupational Safety and Health official training and at least 5 years experience as Safety Manager on similar projects.
(6) Submit the technical data/info of the materials that the offeror plans to use to complete the installation (catalog data of single mode fiber optic, equipment rack, fiber optic tray/patch panel, fiber optic splices, PVC ducts, 3x3 Maxcell & manhole).
(7) In addition to the technical requirements as in the SOO, the offerors will take into account the following items to prepare the proposal which have not been explain with enough detail in the SOO :
1.- A new 24U equipment rack will be installed in all the buildings included in the project (list of Core 4 Buildings: 302, 303, 107, 320, 314, 313, 311, 310).
2.- The 12 strands SM fiber optic cable to be run for this project will be protected against rodents, mouses, rabbits and rats.
3.- All the new ducts installed will be sealed to avoid the animals going inside them.
C. PART III – Past Performance Information - The response shall consist of (1) Past Performance Reference List and (2) Present/Past Performance Questionnaires to show recency, relevancy and quality of work performed.
Required Documents:
(1) Past Performance Reference List: Past Performance Reference List (RFP Attachment #4) shall be submitted from offerors to 496 ABS/LGC, by either e-mail (elia.portz.3.es@us.af.mil) or FAX (34-95-584-8054), preferably 7 days before proposal closing date to match the information of questionnaires as required in below paragraph (2). Offeror shall submit the reference list of three (3) contracts performed, from start to finish, as prime contractor of the most relevant contracts for U.S. Government agencies, Kingdom of Spain or its political subdivisions, European Union countries, or commercial customers within the last three (3) years from this solicitation release date.
(2) Present/Past Performance Questionnaires: The government requires Past Performance Information of the contracts identified in the Past Performance Reference List from each contracting activity or commercial activity. The offeror shall send out the Present/Past Performance Questionnaires (RFP Attachment #5) to respective POC of contracting activity identified in the Past Performance Reference List. The responsibility to send out the Present/Past Performance Questionnaires rests solely with the offeror – it shall not be delegated to any other entity. Once the questionnaires are completed by your POCs, the information contained therein shall be considered sensitive and shall not be releasable.
Questionnaires shall be sent directly back to 496 ABS/LGC from evaluating agencies/companies, by either e-mail (elia.portz.3.es@us.af.mil) or FAX (34-95-584- 8054), preferably 7 days before proposal closing date to match the Past Performance Reference List information as required in above paragraph c.(1)(a)(1 – 10). Offerors are responsible for ensuring that their reference sources receive the questionnaires in time to complete and return the questionnaires to 496 ABS/LGC preferably 7 days before proposal closing date. The government will evaluate the quality and extent of offeror’s experience deemed relevant to the requirements of this RFP. The government will use information submitted by the offeror and other sources, such as other U.S. Government offices and commercial sources, to assess experience.
(3) Recent and Relevant Contracts: Submit information on no more than three recent contracts that you consider relevant in demonstrating your ability to perform the proposed effort. Include rationale supporting your assertion of relevance. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate. This may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Recent contracts are those that have been completed during the past five (5) years ( from start to completion ) from this solicitation release date, or is currently in progress. Relevant contracts (similar in scope, size and complexity) shall include the following work requirements:
(a) Scope – Engineer, furnish, install and test (EFI&T) new concrete encasement Manhole/Duct System, fiber optic cable (FOC) and copper cables to core buildings at Moron Air Base.
(b) Size – The magnitude of this project is estimated between $100,000 and $250,000 U.S. Dollars.
(c) Complexity – Projects with same or similar degree of difficulty.
(d) Quality of Contracts: Submit documentation to support the quality of work performed, timely performance, etc. For example, letters of recommendation from previous customers, awards, quality certificates, etc.
(e) Subcontractor Consent: Past Performance Information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor’s consent. Provide a signed consent to the release of Past Performance Information to the prime offeror for each subcontractor that will perform major or critical aspects of the requirement.
SECTION M - EVALUATION FACTORS FOR AWARD
EVALUATION FACTORS
Section M - Evaluation Factors for Award
EVALUATION FACTORS
1.BASIS FOR AWARD
1.1 This is a competitive best value source selection in which the government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the government, price, technical acceptability and past performance considered. The government intends to make award to the lowest priced, technically acceptable offeror with acceptable past performance. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. The government intends to award without discussions with respective offerors. The government, however, reserves the right to conduct discussions if deemed in its best interest. The following listed are evaluation factors that shall be used in the evaluation process:
a. Price
b. Technical Acceptability
c. Past Performance
1.2. First, offers shall be ranked according to price. The offers will be evaluated based on completeness and reasonableness of the overall proposed price. All offerors must therefore propose on all line items in Section B and failure in doing so may be cause for rejection of that offer. The government intends that only one contract will be awarded as a result of this solicitation. The government shall evaluate the Technical Proposal and Past Performance Information submitted only from the lowest priced offeror under this acquisition. If the lowest priced offeror meets the government’s technical and past performance standards of acceptability as defined under Section M, it will be awarded the contract. If the lowest priced offeror fails to meet the governments technical and past performance standards of acceptability as defined under Section M, that offeror will be eliminated from consideration for award. The government will then evaluate the next lowest priced offeror’s technical and past performance acceptability in the same manner. This process will continue until an offeror is found to meet the government’s technical and past performance standards of acceptability as defined under Section M. An unacceptable rating in any factor will result in the entire proposal being rated unacceptable and therfore ineligible for award.
1.3. Offeror’s Technical Proposal that is evaluated will be rated as Acceptable or Unacceptable.
The government’s technical standard of acceptability is defined under Section M.
1.4. Using questionnaires if necessary when the offeror does not possess the performance experience with the U.S. Government, the contracting officer shall evaluate performance information from all offerors based on (1) the references provided by the offeror and (2) data independently obtained from other U.S. Government and commercial sources. The purpose of the past performance evaluation is to allow the government to assess the offeror’s ability to perform the effort described in this RFP, based on the offeror’s demonstrated present and past performance on relevant contracts. Past performance will be evaluated for recency, relevancy, and quality as defined under Section M. Offerors shall submit the most recent and relevant past and present contracts and subcontracts performed for the U.S. Government, the Kingdom of Spain or political subdivisions, European Union countries and commercial customers within the last three (3) years from this solicitation release date.
1.5. Offeror’s Past Performance Information that is evaluated will be assigned a rating of acceptable or unacceptable. The government’s past performance standard of acceptability is defined under Section M.
1.6. Offerors are cautioned to submit sufficient information and in the format specified in Section L. Offeror’s may be asked to clarify certain aspects of their proposal or respond to adverse Past Performance Information to which the offeror has not previously had an opportunity to respond.
Communications conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision.
2. PRICE PROPOSAL EVALUATION
2.1. Price proposals will be evaluated based on completeness and reasonableness of the overall proposed price. All offerors must therefore propose on all line items in Section B and propose on all items in the “Cost Estimate Breakdown USAFE- QUUG-12-00005-01.xlsx” file and failure in doing so may be cause for rejection of that offer. Unrealistically low, unreasonably high or unbalanced proposed prices may be grounds for eliminating a proposal from competition on the basis that the offeror did not fully understand the requirement. Comparison of the proposed prices received in response to the RFP and comparision of proposed prices with the independent overnment estimate will satisfy the requirement to perform a price analysis. The lowest complete and reasonable price proposal will be ranked highest.
3. TECHNICAL PROPOSAL EVALUATION
3.1. Each offeror’s Technical Proposal that is evaluated will be assigned either an Acceptable or Unacceptable rating as follows:
Rating Definition Acceptable:
Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable:
Proposal does not clearly meet the minimum requirements of the solicitation.
3.2. Technical Proposal evaluation will be performed based on the following criteria:
a. Offeror has provided the required current "Certificado de Instalador Autorizado de Telecomunicaciones para Fibra Optica" issued by the "Registro de Instaladores Autorizados de Telecomunicaciones" of the "Secretaria de Estado de Telecomunicaciones y para la Sociedad de la Informacion - Ministerio de Industria, Energia y Turismo".
b. Offeror has submitted a Work Plan that demonstrates that the production is reasonable and the proposed equipment and personnel are adequate to perform the work.
d. Offeror has submitted a Construction Schedule that is reasonable and is correlated with the work plan information.
e. Offeror has submitted an organizational chart clearly showing proposed key personnel to include the Superintendent, the Quality Control Manager, Safety Manager and English Speaking Representative.
f. Offeror has submitted the technical data/info of the materials that the offeror plans to use to complete the installation (catalog data of single mode fiber optic, equipment rack, fiber optic tray/patch panel, fiber optic splices, PVC ducts, 3x3 Maxcell & manhole).
3.3. Technical acceptability shall be determined based upon an integrated assessment of the above subfactors.
4. PAST PERFORMANCE EVALUATION
4.1. Each offeror that is evaluated on past performance will be assigned a rating as follows:
Rating Definition Acceptable:
Based on the offeror’s performance record, the government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable:
Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
4.2. Past performance evaluation will be performed based on the following criteria:
a. Recency: Each contract will be confirmed to have been completed during the past five (5) years (from start to completion) from this solicitation release date, or is currently in progress.
b. Relevancy: A relevancy determination of the offeror's present and past performance as prime contractor, subcontractor, joint ventures, and/or teaming partners will be made.
(1) Scope – Engineer, furnish, install and test (EFI&T) new concrete encasement Manhole/Duct System, fiber optic cable (FOC) and copper cables to core buildings at Moron Air Base..
(2) Size – The magnitude of this project is estimated between $100,000 and $250,000 U.S. Dollars.
(3) Complexity – Projects with same or similar degree of difficulty.
c. Quality: Quality assessment will focus on the following four (4) factors. Quality rating is assigned based on the Quality Rating Criteria below using subfactors evaluated under Section L, for Present/Past Performance Questionnaires (RFP Attachment #5) or cross references to the government in-house data if available on DD2626 (Performance Evaluation – Construction) for the offerors.
(1) Quality of Work
(2) Timely Performance/ Schedule
(3) Effectiveness of Management/ Key Personnel
(4) Compliance with Safety Standards
4.3. Past performance acceptability shall be determined based upon an integrated assessment of recency, relevancy, and quality for all past performance records considered, not just those submitted by the offeror. Adverse past performance is defined as past performance information that supports a less than acceptable rating on any evaluation aspect or any unfavorable comment received from sources without a formal rating system.
(b) Size – Reference Disclosure of Magnitude: Between $100,000 and $2500,000 U.S.
Dollars.
(c) Complexity – Multiple efforts (Task Orders/Projects) with same degree of difficulty being performed concurrently.
(1) Quality of Contracts: Submit documentation to support the quality of work performed, timely performance, effectiveness of Management/Key personnel, and compliance with safety standards. For example, letters of recommendation from previous customers, awards, quality certificates, etc.
(2) Subcontractor Consent: Past Performance Information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor’s consent. Provide a signed consent to the release of Past Performance Information to the prime offeror for each subcontractor that will perform major or critical aspects of the requirement.
(End of Summary of Changes)