INSTALLATION
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Fiber to Core 4 Buildings | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| USAFE- QUUG-12-00005-01 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| MANHOLE & DUCT SYSTEM WORK: DIGGING & CONDUITS INSTALLATION | ||||||||||
| Sistema de arquetas y conductos: excavacion e isnstallacion de conductos |
| 1 | Install MH-Noncore 1 as shown on sketch 1 | |
| Instalar arqueta MH-Noncore 1 como se especifica en el sketch 1del SOO | JOB | |
| 2 | Install MH-Noncore 2 as shown on sketch 1 | |
| Instalar arqueta MH-Noncore 2 como se especifica en el sketch 1del SOO | JOB | |
| 3 | Install MH-Noncore 7 as shown on sketch 5 | |
| Instalar arqueta MH-Noncore 7 como se especifica en el sketch 5 del SOO | JOB | |
| 4 | Install MH-Noncore 8 as shown on sketch 5 | |
| Instalar arqueta MH-Noncore 8 como se especifica en el sketch 5 del SOO | JOB | |
| 5 | Install MH-Noncore 9 as shown on sketch 5 | |
| Instalar arqueta MH-Noncore 9 como se especifica en el sketch 5 del SOO | JOB | |
| 6 | Install MH-Noncore 10 as shown on sketch 5 | |
| Instalar arqueta MH-Noncore 10 como se especifica en el sketch 5 del SOO | JOB | |
| 7 | Install MH-Noncore 11 as shown on sketch 5 | |
| Instalar arqueta MH-Noncore 11 como se especifica en el sketch 5 del SOO | JOB | |
| 8 | Install MH-Noncore 12 as shown on sketch 5 | |
| Instalar arqueta MH-Noncore 12 como se especifica en el sketch 5 del SOO | JOB | |
| 9 | Install two (2) each 4" Schedule 40 PVC ducts - concrete encased - between MH-69, MH-New1, MH-New2, MH-New3, MH-Noncore 1 and MH-Noncore 2 | |
| Instalar 2 conductos de PVC de 4" Schedule 40 en prisma de hormigon entre MH-69, MH-New1, MH-New2, MH-New3, MH-Noncore 1 y MH-Noncore 2 | JOB | |
| 10 | Install two (2) each 4” Schedule 40 PVC ducts from MH-Noncore 2 to Bldg 302 | |
| Instalar 2 conductos de PVC de 4" Schedule 40 desde MH-Noncore 2 hasta el edificio 302 | JOB | |
| 11 | Install two (2) each 4” Schedule 40 PVC ducts from MH-Noncore 2 to Bldg 303 | |
| Instalar 2 conductos de PVC de 4" Schedule 40 desde MH-Noncore 2 hasta el edificio 303 | JOB | |
| 12 | Install two (2) each 4” Schedule 40 PVC ducts from MH-Noncore 1 to Bldg 107 | |
| Instalar 2 conductos de PVC de 4" Schedule 40 desde MH-Noncore 1 hasta el edificio 107 | JOB | |
| 13 | Install MH-Noncore 3 as shown on sketch 2. | |
| Instalar arqueta MH-Noncore 3 como se especifica en el sketch 2 del SOO | JOB | |
| 14 | Install two (2) each 4” Schedule 40 PVC ducts - concrete encased - between MH-Noncore 1 and MH-Noncore 3. | |
| Instalar 2 conductos de PVC de 4" Schedule 40 en prisma de hormigon entre MH-Noncore 1 y MH-Noncore 3 | JOB | |
| 15 | Install two (2) each 4” Schedule 40 PVC ducts from MH-Noncore 3 to Bldg 320. | |
| Instalar 2 conductos de PVC de 4" Schedule 40 desde MH-Noncore 3 hasta el edificio 320 | JOB | |
| 16 | Install one (1) new Handhole 4’x4’x51” on locations MH-Noncore 4 as shown on Sketch 3 | |
| Instalar arqueta MH-Noncore 4 como se especifica en el sketch 3 del SOO | JOB | |
| 17 | Install two (2) each 4” Schedule 40 PVC ducts - concrete encased - between MH-Noncore 3 and MH-Noncore 4. | |
| Instalar 2 conductos de PVC de 4" Schedule 40 en prisma de hormigon entre MH-Noncore 3 y MH-Noncore 4 | JOB | |
| 18 | Install two (2) each 4” Schedule 40 PVC ducts from MH-Noncore 4 to Bldg 314 | |
| Instalar 2 conductos de PVC de 4" Schedule 40 desde MH-Noncore 4 hasta el edificio 314 | JOB | |
| 19 | Install one (1) new Handhole 4’x4’x51” on locations MH-Noncore 5 as shown on Sketch 3 | |
| Instalar arqueta MH-Noncore 5 como se especifica en el sketch 3 del SOO | JOB | |
| 20 | Install two (2) each 4” Schedule 40 PVC ducts - concrete encased - between MH-Noncore 4 and MH-Noncore 5. | |
| Instalar 2 conductos de PVC de 4" Schedule 40 en prisma de hormigon entre MH-Noncore 4 y MH-Noncore 5 | JOB | |
| 21 | Install two (2) each 4” Schedule 40 PVC ducts from MH-Noncore 5 to Bldg 313 | |
| Instalar 2 conductos de PVC de 4" Schedule 40 desde MH-Noncore 5 hasta el edificio 313 | JOB | |
| 22 | Install one (1) new Handhole 4’x4’x51” on locations MH-Noncore 6 as shown on Sketch 4. | |
| Instalar arqueta MH-Noncore 6 como se especifica en el sketch 4 del SOO | JOB | |
| 23 | Install two (2) each 4” Schedule 40 PVC ducts - concrete encased - between MH-Noncore5 and MH-Noncore6 | |
| Instalar 2 conductos de PVC de 4" Schedule 40 en prisma de hormigon entre MH-Noncore 5 y MH-Noncore 6 | JOB | |
| 24 | Install two (2) each 4” Schedule 40 PVC ducts from MH-Noncore6 to Bldg 311 | |
| Instalar 2 conductos de PVC de 4" Schedule 40 desde MH-Noncore 6 hasta el edificio 311 | JOB | |
| 25 | Install two (2) each 4” Schedule 40 PVC ducts from MH-Noncore6 to Bldg 310 | |
| Instalar 2 conductos de PVC de 4" Schedule 40 desde MH-Noncore 6 hasta el edificio 310 | JOB |
| FO INSTALLATION & ACCESS TO THE BUILDINGS |
| Installacion de FO y acceso a los edificios |
| 26 | Install metallic conduits and NEMA 4 X enclosures to acess buildings 107, 302, 303, 310, 311, 313, 314, and 320 Instalar cajas de registros y conductos metalicos de acceso a los edificios 107, 302, 303, 310, 311, 313, 314 y 320 | JOB |
| 27 | Install 3X3 maxcell & innerducts 1" in one of the vacant 4” ducts for the route as specified in the SOO. Instalar 3X3 maxcell & innerducts 1" como se especifica en el SOO. | JOB |
| 28 | Install Comm. equipment Cabinet in buildings 107, 302, 303, 310, 311, 313, 314, and 320 Instalar RACKS 24U en sala de comunicaciones de los edificios 107, 302, 303, 310, 311, 313, 314 y 320 | |
| 29 | Run 12 str FOC from ITN160 to Bldg 302. Instalar cable de 12 FO desde ITN 160 hasta Bldg 302. | JOB |
| 30 | Install one each 96 port FOC panel in existing Comm. Cabinet in Bldg 160 | |
| Instalar un Panel de Conexion de FO para 96 fibras en el armario de comunicaciones del edificio 160. | JOB | |
| 31 | Install one each 12 port FOC panel in new Comm. Cabinet in Bldg 302 | |
| Instalar un Panel de Conexion de FO para 12 fibras en el armario de comunicaciones del edificio 302. | JOB | |
| 32 | Terminate the 12-str to the FOC panel using fusion splice to pigtails with SC connectors in Bldgs 160 & 302 | |
| Terminar las 12 fibras fusionando con pigtails con conectores SC en Bldgs 160 & 302 | JOB | |
| 33 | Run 12 str FOC from ITN160 to Bldg 303. Instalar cable de 12 FO desde ITN 160 hasta Bldg 303. | JOB |
| 34 | Install one each 12 port FOC panel in new Comm. Cabinet in Bldg 303 | |
| Instalar un Panel de Conexion de FO para 12 fibras en el armario de comunicaciones del edificio 303. | JOB | |
| 35 | Terminate the 12-str to the FOC panel using fusion splice to pigtails with SC connectors in Bldgs 160 & 303 | |
| Terminar las 12 fibras fusionando con pigtails con conectores SC en Bldgs 160 & 303 | JOB | |
| 36 | Run 12 str FOC from ITN160 to Bldg 107. Instalar cable de 12 FO desde ITN 160 hasta Bldg 107. | JOB |
| 37 | Install one each 12 port FOC panel in new Comm. Cabinet in Bldg 107 | |
| Instalar un Panel de Conexion de FO para 12 fibras en el armario de comunicaciones del edificio 107. | JOB | |
| 38 | Terminate the 12-str to the FOC panel using fusion splice to pigtails with SC connectors in Bldgs 160 & 107 | |
| Terminar las 12 fibras fusionando con pigtails con conectores SC en Bldgs 160 & 107 | JOB | |
| 39 | Run 12 str FOC from ITN160 to Bldg 320. Instalar cable de 12 FO desde ITN 160 hasta Bldg 320. | JOB |
| 40 | Install one each 12 port FOC panel in new Comm. Cabinet in Bldg 320 | |
| Instalar un Panel de Conexion de FO para 12 fibras en el armario de comunicaciones del edificio 320. | JOB | |
| 41 | Terminate the 12-str to the FOC panel using fusion splice to pigtails with SC connectors in Bldgs 160 & 320 | |
| Terminar las 12 fibras fusionando con pigtails con conectores SC en Bldgs 160 & 320 | JOB | |
| 42 | Run 12 str FOC from ITN160 to Bldg 314. Instalar cable de 12 FO desde ITN 160 hasta Bldg 314. | JOB |
| 43 | Install one each 12 port FOC panel in new Comm. Cabinet in Bldg 314 | |
| Instalar un Panel de Conexion de FO para 12 fibras en el armario de comunicaciones del edificio 314. | JOB | |
| 44 | Terminate the 12-str to the FOC panel using fusion splice to pigtails with SC connectors in Bldgs 160 & 314 | |
| Terminar las 12 fibras fusionando con pigtails con conectores SC en Bldgs 160 & 314 | JOB | |
| 45 | Run 12 str FOC from ITN160 to Bldg 313. Instalar cable de 12 FO desde ITN 160 hasta Bldg 313. | JOB |
| 46 | Install one each 12 port FOC panel in new Comm. Cabinet in Bldg 313 | |
| Instalar un Panel de Conexion de FO para 12 fibras en el armario de comunicaciones del edificio 313. | JOB | |
| 47 | Terminate the 12-str to the FOC panel using fusion splice to pigtails with SC connectors in Bldgs 160 & 313 | |
| Terminar las 12 fibras fusionando con pigtails con conectores SC en Bldgs 160 & 313 | JOB | |
| 48 | Run 12 str FOC from ITN160 to Bldg 311. Instalar cable de 12 FO desde ITN 160 hasta Bldg 311. | JOB |
| 49 | Install one each 12 port FOC panel in new Comm. Cabinet in Bldg 311 | |
| Instalar un Panel de Conexion de FO para 12 fibras en el armario de comunicaciones del edificio 311. | JOB | |
| 50 | Terminate the 12-str to the FOC panel using fusion splice to pigtails with SC connectors in Bldgs 160 & 311 | |
| Terminar las 12 fibras fusionando con pigtails con conectores SC en Bldgs 160 & 311 | JOB | |
| 51 | Run 12 str FOC from ITN160 to Bldg 310. Instalar cable de 12 FO desde ITN 160 hasta Bldg 310. | JOB |
| 52 | Install one each 12 port FOC panel in new Comm. Cabinet in Bldg 310 | JOB |
| Instalar un Panel de Conexion de FO para 12 fibras en el armario de comunicaciones del edificio 310. | ||
| 53 | Terminate the 12-str to the FOC panel using fusion splice to pigtails with SC connectors in Bldgs 160 & 310 | |
| Terminar las 12 fibras fusionando con pigtails con conectores SC en Bldgs 160 & 310 | JOB |
| Total Project USAFE- QUUG-12-00005-01 |
| Total Proyecto USAFE- QUUG-12-00005-01 |