Material Submittals Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question and answer.doc | DOC document | |
| Solicitation Amendment 0001.doc | DOC document | |
| FA5575-08-R-0010 Solicitation Document.doc | DOC document | |
| Spn Specifications.zip | ZIP file | |
| Attachment 4 - PPI Questionnaire.doc | DOC document | |
| Attachment 3 - PPI reference list.doc | DOC document | |
| Eng Specifications.zip | ZIP file | |
| Drawings Planos.zip | ZIP file | |
| AF 3052.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||||||||||||||||||||||
| QUUG 07-1036 | PROJECT TITLE: | |||||||||||||||||||||||
| INSTALL AIRFIELD FIRE HYDRANTS | SOLICITATION / CONTRACT NO. | |||||||||||||||||||||||
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||
| APPROVED | DISAPPROVED | |||||||||||||||||||||||
| SECTION 01011 | ||||||||||||||||||||||||
| 1 | Safety Plan | 4 | Award+14 | |||||||||||||||||||||
| 2 | Mobility Plan | 4 | Commencing+5 | |||||||||||||||||||||
| 3 | Waste & construction debris management | 4 | Final Inspection | |||||||||||||||||||||
| 4 | As-Built drawings | 4 | FI+30 | |||||||||||||||||||||
| 6 | Warranty letter | 4 | FI+30 | |||||||||||||||||||||
| SECTION 02679 | ||||||||||||||||||||||||
| 7 | Cool bituminous mix | 4 | Award+20 | |||||||||||||||||||||
| SECTION 09900 | ||||||||||||||||||||||||
| 8 | Paints and coatings | 4 | Award+20 | |||||||||||||||||||||
| SECTION 15400 | ||||||||||||||||||||||||
| 9 | High-density polyethylene piping PE100 | 4 | 4 | Award+20 | ||||||||||||||||||||
| 10 | Accessories for polyethylene pipe connections | 4 | Award+20 | |||||||||||||||||||||
| 11 | Clamp connection | 4 | Award+20 | |||||||||||||||||||||
| 12 | Gate valve | 4 | Award+20 | |||||||||||||||||||||
| 13 | Flush type fire hydrant | 4 | Award+20 |
&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP)&RPage &P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||||||||||||||||||||||
| QUUG 07-1036 | TÍTULO DE PROYECTO: | |||||||||||||||||||||||
| INSTALAR HIDRANTES DE PISTA | SOLICITACIÓN / CONTRATO NO. | |||||||||||||||||||||||
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | |||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA | FECHA RECEPCIÓN EN CONTRATACIÓN | FECHA EN INGENIERíA CIVIL | FECHA LÍMITE DE DEVOLUCIÓN | NÚMERO DE MUESTRA | FECHA NOTIFICACIÓN A CONTRATISTA | SEGUNDA PRESENTACIÓN DEL CONTRATISTA | APROBACIÓN FINAL | OBSERVACIONES | ||
| APROBADO | DESAPROBADO | |||||||||||||||||||||||
| SECCIÓN 01011 | ||||||||||||||||||||||||
| 1 | Plan de seguridad | 4 | ADJUD+14 | |||||||||||||||||||||
| 2 | Plan de movilización | 4 | Comienzo+5 | |||||||||||||||||||||
| 3 | Gestión de residuos y escombros | 4 | Inspección final | |||||||||||||||||||||
| 4 | Planos As-Builts | 4 | IF+30 | |||||||||||||||||||||
| 5 | Carta de garantía | 4 | IF+30 | |||||||||||||||||||||
| SECCIÓN 02679 | ||||||||||||||||||||||||
| 6 | Mezcla bituminosa en frío | 4 | Adjud+20 | |||||||||||||||||||||
| SECCIÓN 09900 | ||||||||||||||||||||||||
| 7 | Pinturas y recubrimientos | 4 | Adjud+20 | |||||||||||||||||||||
| SECCIÓN 15400 | ||||||||||||||||||||||||
| 8 | Tubos de polietileno alta densida PE100 | 4 | 4 | Adjud+20 | ||||||||||||||||||||
| 9 | Accesorios de conexión para tuberías de polietileno | 4 | Adjud+20 | |||||||||||||||||||||
| 10 | Collarín de toma | 4 | Adjud+20 | |||||||||||||||||||||
| 11 | Válvula de compuerta | 4 | Adjud+20 | |||||||||||||||||||||
| 12 | Hidrante enrasado | 4 | Adjud+20 |
&L&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP)&RPágina &P de &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal