Schedule of Material Submittals.xls

XLS spreadsheet 103 KB Posted

Attached to
Install Airfield Fire Hydrants Federal contract opportunity
Solicitation number
FA5575-08-R-0010
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Material Submittals Form 66

View the file

Other files for this federal contract opportunity

Other files attached to Install Airfield Fire Hydrants, newest first.
File Type Posted
Question and answer.doc DOC document
Solicitation Amendment 0001.doc DOC document
FA5575-08-R-0010 Solicitation Document.doc DOC document
Spn Specifications.zip ZIP file
Attachment 4 - PPI Questionnaire.doc DOC document
Attachment 3 - PPI reference list.doc DOC document
Eng Specifications.zip ZIP file
Drawings Planos.zip ZIP file
AF 3052.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 07-1036PROJECT TITLE:
INSTALL AIRFIELD FIRE HYDRANTSSOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
SECTION 01011
1Safety Plan4Award+14
2Mobility Plan4Commencing+5
3Waste & construction debris management4Final Inspection
4As-Built drawings4FI+30
6Warranty letter4FI+30
SECTION 02679
7Cool bituminous mix4Award+20
SECTION 09900
8Paints and coatings4Award+20
SECTION 15400
9High-density polyethylene piping PE10044Award+20
10Accessories for polyethylene pipe connections4Award+20
11Clamp connection4Award+20
12Gate valve4Award+20
13Flush type fire hydrant4Award+20

&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP)&RPage &P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 07-1036TÍTULO DE PROYECTO:
INSTALAR HIDRANTES DE PISTASOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGAFECHA RECEPCIÓN EN CONTRATACIÓNFECHA EN INGENIERíA CIVILFECHA LÍMITE DE DEVOLUCIÓNNÚMERO DE MUESTRAFECHA NOTIFICACIÓN A CONTRATISTASEGUNDA PRESENTACIÓN DEL CONTRATISTAAPROBACIÓN FINALOBSERVACIONES
APROBADODESAPROBADO
SECCIÓN 01011
1Plan de seguridad4ADJUD+14
2Plan de movilización4Comienzo+5
3Gestión de residuos y escombros4Inspección final
4Planos As-Builts4IF+30
5Carta de garantía4IF+30
SECCIÓN 02679
6Mezcla bituminosa en frío4Adjud+20
SECCIÓN 09900
7Pinturas y recubrimientos4Adjud+20
SECCIÓN 15400
8Tubos de polietileno alta densida PE10044Adjud+20
9Accesorios de conexión para tuberías de polietileno4Adjud+20
10Collarín de toma4Adjud+20
11Válvula de compuerta4Adjud+20
12Hidrante enrasado4Adjud+20

&L&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP)&RPágina &P de &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal