Q&A.docx

DOCX document 13 KB Posted

Attached to
Concrete T-Wall Federal contract opportunity
Solicitation number
FA5422-18-Q-3205
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

View the file

Other files for this federal contract opportunity

Other files attached to Concrete T-Wall, newest first.
File Type Posted
Attachment_2_Specifications.pdf PDF
Request_For_Quotes.pdf PDF
Attachment_3_Design.pdf PDF
Attachment_1_Pricing.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1: is the RFP for Purchase Order (contract) T-Wall Barriers for Djibouti Airfield, for five-hundred (500) Each Concrete T-Wall Barriers, manufacturing and deliver to the location only.

Or with installation at the location

Answer 1: Delivery to location only

Question 2: if it is with installation at the location. As per the (attachment 3 Design) on the General structural notes column, do we have to do the work?

If yes, do we have to provide separate offer?

Answer 2: Delivery to location only

Question 3: Reference RFQ Page 2 Terms and Conditions Paragraph 5 Inspection and Acceptance The place of delivery is Chabelley Airfield, Djibouti or the consolidation point as outlined in the shipping options with 200 days ARO in accordance with the solicitation – No definition of “Consolidated Point” is included in the RFQ. Please clarify.

Answer 3: Delivery will be to Chabelley Airfield, Djibouti, not a consolidation point.

Question 4: Please clarify if offloading of T-Walls at Chabelley by Contractor is to be included in the price proposal.

Alternatively please confirm if NAVFAC will offload T Walls from Contractor delivery vehicles.

Answer 4: T-walls will need to be offloaded at Chabelley by the offeror

Question 5: Reference Attachment 3 Design Drawing S-001 Structural Notes, Section 2: Site Preparation Notes It appears that these referenced note relate to site preparation improvement at Chabelley prior to placing T-Walls.

Please confirm if Contractor is to perform these Chabelley site improvements and thereafter offload and place T-Walls in final position.

Answer 5: No site preparation required. Delivery only.