Q&A.docx
DOCX document 13 KB Posted
- Attached to
- Concrete T-Wall Federal contract opportunity
- Solicitation number
- FA5422-18-Q-3205
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2_Specifications.pdf | ||
| Request_For_Quotes.pdf | ||
| Attachment_3_Design.pdf | ||
| Attachment_1_Pricing.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question 1: is the RFP for Purchase Order (contract) T-Wall Barriers for Djibouti Airfield, for five-hundred (500) Each Concrete T-Wall Barriers, manufacturing and deliver to the location only.
Or with installation at the location
Answer 1: Delivery to location only
Question 2: if it is with installation at the location. As per the (attachment 3 Design) on the General structural notes column, do we have to do the work?
If yes, do we have to provide separate offer?
Answer 2: Delivery to location only
Question 3: Reference RFQ Page 2 Terms and Conditions Paragraph 5 Inspection and Acceptance The place of delivery is Chabelley Airfield, Djibouti or the consolidation point as outlined in the shipping options with 200 days ARO in accordance with the solicitation – No definition of “Consolidated Point” is included in the RFQ. Please clarify.
Answer 3: Delivery will be to Chabelley Airfield, Djibouti, not a consolidation point.
Question 4: Please clarify if offloading of T-Walls at Chabelley by Contractor is to be included in the price proposal.
Alternatively please confirm if NAVFAC will offload T Walls from Contractor delivery vehicles.
Answer 4: T-walls will need to be offloaded at Chabelley by the offeror
Question 5: Reference Attachment 3 Design Drawing S-001 Structural Notes, Section 2: Site Preparation Notes It appears that these referenced note relate to site preparation improvement at Chabelley prior to placing T-Walls.
Please confirm if Contractor is to perform these Chabelley site improvements and thereafter offload and place T-Walls in final position.
Answer 5: No site preparation required. Delivery only.