Solicitation Amendment FA527022Q00620002 SF 30.pdf

PDF 578 KB Posted

Attached to
25-ton Rough Terrain Crane Federal contract opportunity
Solicitation number
FA527022Q0062
Issued by
Department of the Air Force Pacific Air Forces

About this file

This amendment modifies a solicitation for a 25-ton rough terrain crane. The solicitation is updated to require an overall length of at least 11,470mm, a minimum 95m auxiliary winch rope, and a preference for a two-stage fully automatic jib to increase safety and efficiency. The shipping destination is specified as USAG Okinawa, Attn: AMIM-JNO-PBS Torii Station Bldg#500 in Okinawa, Japan. The soliciting agency is the Department of the Air Force Pacific Air Forces.

View the file

Other files for this federal contract opportunity

Other files attached to 25-ton Rough Terrain Crane, newest first.
File Type Posted
FED-STD-297E 1 AUG 90 with Jan 96 attachment up date.pdf PDF
Corrosion Prevemtive Compound.pdf PDF
Questions_Answer.pdf PDF
Solicitation Amendment FA527022Q00620001 SF 30.pdf PDF
Attachment 1 Question Form.pdf PDF
Solicitation - FA527022Q0062.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to update required specifications. Block 14 (Description of Amendment/Modification):

Following Specifications were updated:

1. Overall Length at Least: 11,470mm

2. Wire Rope: Auxiliary winch Minimum 95m long

3. Jib: Two stage fully automatic jib is preferable to increases safety and makes operation of jib related material handling events more efficient.

Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Ship To

Description/Specifications/Statement of Work

Miscellaneous text in this section has been modified to:

2WD & 4WD (selectable by switch) Right side cab Engine rating: at least 820N-m torque, utilize diesel fuel and engine should have at least 7.5 liters of displacement.

Maximum speed of at least 45KM/h Overall Height at least: 3,400mm Overall Width at least: 2,600mm Overall Length at least: 11,470mm Must be capable of lifting 25 tons.

Emissions must be compliant with Japan emission regulations Anti-rust coating (Complete rust proofing).

All terrain tires Operation Manual x 3 ea. /prefer paper Parts Catalog (Complete edition) x 2 ea. / prefer paper Shop Maintenance Manual (Complete edition) x 2 ea. / prefer paper Drum monitoring camera AML tricolored light LED (right 2ea, left 2ea), check side of vehicle for night work Road verge lamp (right 1ea, left 1ea) Two-sided curtain in the cab Obtain low-noise type Construction Swing Angle/360(d) continuous

Wire Rope Main winch/16mm is standard dia. X Minimum 170 m long/spin-resistant wire rope Auxiliary winch/16mm dia. X Minimum 95 m long

Boom 4-section box structure synchronously telescoping hydraulic boom

FA527022Q00620002

Boom length should be at least 44 meters fully extended and at least 9 meters fully constricted, and expansion should be at least 21 meters.

Jib Two stage fully automatic jib is preferable to increases safety and makes operation of jib related material handling events more efficient.

Jib should be at least 8.2m - 13.0 meters.

Outriggers Fully hydraulic H-type (floats mounted integrally) slides and jacks each provided with independent operation.

Safety Devices Safety rope, material: nylon Automatic moment limiter (AML) Swing automatic stop device Elevation slow down and stop device Over-winding cutout device Working area control device Outrigger extension width detector Level gage Hydraulic safety valve Telescoping cylinder check valve Extension cylinder check valve Jack pilot check valve Swing lock Equipment Air-conditioner with dehumidifier Hydraulic oil temperature indication Ancillary Equipment Wood blocs (x4) Aluminum deck plates (x4) Radiator cover

FA527022Q00620002

IDCode:
Page: 1
Pages: 3
AmendNo: 0002
EffDate: 15 Aug 2022
ReqNo:
ProjNo:
IssCode: FA5270
AdmCode:
IssuedBy: FA5270 18 CONS LGC

APO AP 96368-5199

UNIT 5199

APO, AP 96368-5199

UNITED STATES

Kinoto Nakao, Email: kinoto.nakao.jp@us.af.mil Telephone: 011.81.98.961.1066

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA527022Q0062
SolDate: 11 Jul 2022
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Ken Kuresaki
ContDate:
CODate: 10 Aug 2022

File details come from the government source that posted it. Updated .