Amend_02.pdf

PDF 319 KB Posted

Attached to
Repair Family Housing, KAB North Terrace (11 units), Kadena AB, Okinawa, Japan
Solicitation number
FA5270-16-B-0002
Issued by

About this file

Amendment 02 to provide an revised SOW and additional/supplemental attachments.

View the file

Other files

File Type Posted
RFI_04.pdf PDF
Amend_03.pdf PDF
RFI_03.pdf PDF
RFI_02.pdf PDF
RFI_01.pdf PDF
Amend_01.pdf PDF
Attachment_9-Other_Contract_Requirements_-_Copy.pdf PDF
FA5270-16-B-0002_Repair_MFH_North_Terrace_Released.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

18 CONS/INFRASTRUCTURE ACQUISITION

POC: NOZOMI KYAN,

UNIT 5199, BLDG 95 KADENA AB

APO AP 96368

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Provide an revised Statement of Work

2. Provide additional/supplemental attachments to Section J

1. CONTRACT ID CODE PAGE OF PAGES

J 1 18

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5270-16-B-0002

X 9B. DATED (SEE ITEM 11)

11-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Sep-2016

CODE

18 CONS/INFRASTRUCTURE ACQUISITION

POC:ZANE ROHWEDDER

UNIT 5199, BLDG 95 KADENA AB

APO AP 96368-5199

FA5270 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE FA5270

FACILITY CODECODE

EMAIL:TEL:

FA5270-16-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

STATEMENT OF WORK

Project: LXEZ 16-4541

Title: Repair Family Housing, KAB North Terrace (11 UN)

Location: Kadena Air Base, Okinawa, Japan

Project Manager: 718 CES/CENMB (Leonardo Ashimine)

Date: 30 Aug 16

1.0 PROJECT DESCRIPTION

Provide all management, tools, design, supplies, equipment, transportation, labor, and services necessary to perform interior and exterior modernization, renovation and repair of eleven (11) single family housing units at North Terrace Community (Bldgs 2501, 2503, 2505, 2507, 2509, 2511, 2513, 2515, 2517, 2519 and 2521 including exterior storage for each unit). The scope of the project includes but is not limited to exterior replacement of pavement/sidewalk, doors/windows/awnings, mechanical/electrical/ plumbing systems, smoke detectors, and storage revitalization. Unit renovations include interior doors, room revitalization to include fixtures/garbage disposer/fan/receptacles in the kitchen, shower, tub, sink, toilet replacement in bathrooms and dining room improvement. Perform asbestos and lead based paint testing and sampling.

Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, DoD Building Code (General Building Requirements) (20 Jun 2016).

Design and work shall conform in accordance with UFC 1-200-02, High Performance and Sustainable Buildings (1 Mar 2013, Change 3, 7 Nov 2014) and all other work to produce a complete and usable facility.

This project will comply with DoD fire protection requirements per UFC 3-600-01, Fire Protection Engineering for Facilities (26 Sep 2006, Change 3, 1 Mar 2013).

2.0 PROJECT OBJECTIVES

This project is required to provide modern and efficient housing for military members and their dependents stationed in Okinawa, Japan. The housing must be upgraded to meet current life safety codes and to provide a comfortable and appealing living environment. The scope of the project includes but is not limited to exterior replacement of pavement/sidewalk, doors/windows/awnings, mechanical/electrical/ plumbing systems, smoke detectors, storage revitalization and patio functional improvement. Unit renovations include exterior doors/windows, interior doors, mechanical/electrical/ plumbing systems, room revitalization to include fixtures/garbage disposal/fan/receptacles in the kitchen, shower, tub, sink, toilet replacement in bathrooms and dining room functional improvement. Test and sample suspected asbestos and lead base paint as required. Repair of interior and exterior utility and communication infrastructure as required.

3.0 PROJECT SCHEDULE AND TIME CONSTRAINTS:

A. COMPLETION OF WORK:

The Contractor shall be required to complete the entire work, ready for use, not later than 536 calendar days, include 136 calendar days for design phase, 126 calendar days for material submittal, review and procurement; and 274 calendar days for construction time including unfavorable weather days, after the date of Notice to Proceed (NTP) issuance. The time for completion shall include final clean-up of the premises.

B. DESIGN SCHEDULE:

The schedule of the pre-design conference will be provided by the Contracting Officer (CO).

This project shall, thereafter, be completed in accordance with the following sequence.

Contractor shall attend review meetings as scheduled.

Schedule Shall be Completed Within

Submit 65% Design Drawings 50 calendar days after the NTP

Government 65% Design Review 21 calendar days after submission

Submit 95% Design Drawings 30 calendar days after 65% review

Government 95% Design Review 21 calendar days after submission

Submit Revised 95% Design 14 calendar days after approved design

Total: 136 calendar days

C. CONSTRUCTION SCHEDULE:

The Contractor can begin on-site civil work with approval from the Government upon satisfactory response actions at the 95% design. The contractor shall be allowed to work from 0800 to 1800 hours, Monday through Friday, excluding U.S. legal holidays.

D. PERFORMANCE TIME:

The contractor shall be completed within 400 calendar days. This includes material submittals, government material submittal review, material procurement, unfavorable weather and construction time.

Schedule Shall be Completed Within

Material Submittals 45 calendar days

Government Review 21 calendar days

Procurement of Materials 60 calendar days

Unfavorable Weather 27 calendar days

Holidays 14 calendar days

Construction Time 233 calendar days

Total: 400 calendar days

E. AVAILABILITY OF BUILDING/FACILITY:

The building/facility to be worked on will be unoccupied during the construction period.

Damage to Government and/or personal property by the Contractor shall be repaired or replaced at the Contractors' expense.

4.0 DESIGN REQUIREMENTS:

A. The design for this project shall provide for the completion of the work identified on this

Statement of Work within the contract price. The design shall fully accommodate usage requirements of the Government facility and minimize interference with existing work. All design work shall be in accordance with applicable criteria. The Government shall not be responsible for any additional costs which could have been avoided through an appropriate contractor’s design.

B. Design and work shall conform in accordance with the following:

NFPA-101 Life Safety Code (2015 Edition)

NFPA-90A Standard for Air-Conditioning and Ventilating System (2015 Edition)

NFPA-170 Standard for Fire Safety and Emergency Symbols (2015 Edition)

NFPA-70 National Electrical Code (2014 Edition)

IES Lighting Handbook 10th Edition (6 Dec 2011)

Uniform Plumbing Code (2015 Edition)

US Air force Housing Guide (Aug 2004)

UFC 3-520-01 Interior Electrical Systems (6 Oct 2015)

UFC-3-600-01 Fire Protection Engineering for Facilities (26 Sep 2006, Change 3, Mar 2013)

MIL-HDBK 1190 Facility Planning Design Guide (1 Sep 1987)

JEGS (Apr 2016)

The specifications shall be prepared using Unified Facilities Guide Specifications (UFGS). Code and standard shall comply with the latest edition.

C. DRAWING FORMATS:

Drawing title block shall follow the attached Kadena Air Base standard title block. Paper size shall be ANSI F (28”x40”). Filing name for the electronic files (CAD and pdf) shall follow the attached “Sheet File Naming Convention”.

D. 95% AND REVISED 95% DESIGN SUBMISSION:

Submit all drawings and catalog cuts/shop drawing of materials and equipment to be used.

E. SUBMITTALS:

Project documents to be submitted for each design stage are as follows.

65% Design:

(1) Half (B2) drawings 3 sets

(2) Specifications 3 sets

(3) Design Calculations 3 sets

(4) ACM/LBP Survey Report 3 sets

(5) Color and Material Samples 1 set

(6) CDs (all contract documents) 3 sets

95% Design:

(2) Specifications 3 sets

(3) Design Calculations 3 sets

(4) Color Board 1 set

(5) CDs (all contract documents) 3 sets

Revised 95% Design:

(2) Specifications 3 sets

(3) Design Calculations 3 sets

(4) CDs (all contract documents) 3 sets

As-built Drawings:

(1) Full size (B1) drawings 1 set

(2) Half (B2) drawings 2 sets

(3) CDs (all contract documents) 3 sets

The Revised 95% Design submittal must be professionally signed and sealed by the DOR and forwarded to the CO. Separated final design packages will only be considered for Government review and approval after acceptance of the final design.

The following design submittals must be approved by the CO prior to the start of construction:

(a) Drawings (PDF and AutoCAD format compatible with 2015 version)

(b) Technical Specifications

(c) Subcontractors and Personnel List

(d) Environmental Protection Plan

(e) Solid Waste Disposal Permit

(f) Safety and Hazardous Analysis Plan

(g) Field Test Reports (ACM, LBP, etc.)

F. AS-BUILT DOCUMENTS:

The Contractor shall provide the corrected contract drawings in CD containing all drawings in electronic CAD and PDF and all documents in WORD or EXCEL and PDF. Orientation for the PDF drawing files shall be saved in ‘landscape’ format. As-built drawings shall be submitted 7-calendar days after the final inspection.

5.0 SPECIAL REQUIREMENTS:

A. Asbestos Containing Materials (ACM) and Lead Base Paint (LBP) Survey:

Building must be visually surveyed for existing finish, to include materials used;

painted exterior and interior surfaces of the building. Check pipes/ducts/equipment insulation which is suspected of containing asbestos and lead base paint. Sampling Plan must be submitted to 18AMDS/SGPB (Bioenvironmental Engineering) and 718CES/CEIE (Environmental Office) for review and approval.

Floor plan (small scale) of the building, survey and test reports shall be submitted at 65% design submittal. The floor plan shall indicate specific locations where samples were taken; i.e., ceiling, wall, floor, pipe, duct, etc.

Actual ACM and LBP material sampling shall be done by a certified building inspector and testing shall be done by local industrial hygienist approved by Kadena Environmental and Bio-Environmental office. For determination of ACM and LBP shall follow Japanese Environmental Government Standards (JEGS).

ACM and LBP sampling shall be conducted for at least 4-buildings. Each sampling and testing is required at least 8-each for ACM and 4-each for LBP, per building.

Destructive Sampling shall be taken from areas that are not easily visible and shall be patched with a match finish.

6.0 DESCRIPTION OF WORK:

The work consists of the following elements:

A. CIVIL/LANDSCAPE

Contractor shall provide all necessary work to replace exterior utility to meet current standards. All disturbed ground surfaces shall be repaired to its original condition.

1. Pavement:

a. Cold plane and remove existing asphalt pavement and resurface with new 50mm

AC pavement.

b. Provide additional 1-ea parking space for each unit. Parking space to match existing. Provide 50mm AC pavement parking including base course, sub base course, concrete curb and gutter to match existing. Provide parking striping as necessary. Replace asphalt driveway including concrete curb and gutter to match original.

2. Sidewalk: Remove and replace concrete sidewalk and base course. Sidewalk replacement is from the corner of Arnold Avenue up to the corner of Powers Avenue.

Sidewalk for driveway shall be replaced also.

3. Walkway: Remove and replace concrete walkway leading to each unit including base course. New walkway and ramp shall be minimum of 1200-mm wide.

4. Ground Surface: Provide sodding including topsoil for new or damaged surfaces.

5. Repair grading for positive slope toward existing drainage system at driveway. Modify existing storm drain and inlet as necessary.

B. ARCHITECTURAL/STRUCTURAL

1. General

a. Ceiling System: Provide new gypsum board ceiling with suspension system.

Provide required access panels.

b. Floor Finishes and Base: Replace all existing floor finishes and wall base throughout the building, unless otherwise stated.

c. Exterior Window and Insect Screens: Replace all with new aluminum sliding windows including frame and insect screens, unless otherwise stated. Glazing shall have an applied solar, heat shielding film reducing solar heat gain into the building.

Provide new horizontal blinds.

d. Sliding Glass Doors: Replace all with new aluminum sliding glass door and frame, including insect screen and hardware, clear color. Glazing shall have an applied solar, heat shielding film reducing solar heat gain into the building. Provide new vertical blinds.

e. Exterior and Interior Doors: Replace all with new doors and frames including insect screen, unless otherwise stated.

f. Repair of Concrete Cracks and Spalls: Prior to painting, repair cracks, spalls and chipped-off concrete on entire interior and exterior surfaces of the building.

g. Painting Works: Repaint all interior and exterior surfaces. Prepare all interior and exterior surfaces for application of new paint finish to include not only uneven surfaces/substrate or voids and unnecessary protruding bolts/pins. Including painting of existing CMU and decorative block screen walls and storages.

h. Remove existing concrete clothes line poles and backfill ground and patch grass.

2. Type F2-56R (Type E-1 MOD), Bldgs 2505, 2511, 2513, 2515, 2517, 2519 and 2521

a. Exterior Storage (detached):

Repaint ceiling and interior walls

Repaint exterior walls

Replace existing double doors with new aluminum doors and frame

Replace existing wall louvers with new aluminum louvers with insect screen

Provide new wood 2-shelves (300-mm depth) with paint finish

Provide new acrylic elastomeric roof coating with ceramic

b. Exterior Structure:

Replace aluminum swing doors and frames including insect screen with new, clear color

Replace aluminum sliding glass doors and frames including insect screen with new, clear color

Replace existing awning windows with new aluminum sliding windows and frames including insect screens

Remove existing built-up roofing system with insulation and provide new 4-ply built-up roofing system with insulation including SST edge flashing and all accessories

Remove and replace existing roof edge concrete curb to match new roofing system thickness

Provide new acrylic elastomeric roof coating with ceramic on new built-up roof

Paint exterior wall and soffit

c. Interior Structure:

Replace interior solid core flush wood doors and frames including hardware for all rooms, paint finish

Replace louvered swing wood doors and frames including hardware, varnish finish for all linen

Replace louvered sliding/bi-folding wood doors and frames including hardware, varnish finish for all closet including above closet storage

d. Patio and Porch:

Pressure wash concrete deck

Repaint decorative block screen wall

e. Foyer:

Repaint ceiling and walls

Replace existing vinyl floor tile with new

Replace existing wall base with new

f. Living / Dining Room 103:

Provide new gypsum board ceiling with suspension system

Paint new ceiling including duct chase

Replace existing wood wall base with new

Repaint walls

g. Kitchen 104:

Replace wall and base cabinets with new plastic laminate cabinets

Demolish suspended wood framed translucent panel ceiling

Provide new gypsum board ceiling with suspension system

Paint new ceiling

Replace existing countertop with new plastic laminated surface countertop

Replace existing vinyl composition tile (VCT) floor with new

Replace existing wood wall base with new

Replace ceramic wall tiles

h. Master Bedroom 101 and Bedroom 102:

Provide new gypsum board ceiling with suspension system with paint finish

Replace existing vinyl floor with new

i. Master Half Bathroom 108/109:

Replace existing with new medicine cabinet with lights and receptacles

Replace existing with new vanity cabinet, plastic laminated finish

Replace existing bathroom wall cabinets with new

Replace gypsum board ceiling including metal suspension system with new

Paint ceiling

Replace aluminum framed glass shower enclosure

Replace existing with new plastic laminated countertop with integrated lavatory sink

Replace bathroom accessories to include towel bars and rings, robe hook, soap dish and toilet paper holder

Replace ceramic wall and floor tiles with new

j. Bathroom 107:

Replace medicine cabinet with lights and receptacles

Replace existing with new vanity cabinet, plastic laminated finish

Replace existing with new plastic laminated countertop with integrated lavatory sink

Replace existing bathroom wall cabinet with new

Replace gypsum board ceiling including metal suspension system with new

Paint ceiling

Replace ceramic wall and floor tiles with new

Replace bathroom accessories to include towel bars and rings, robe hook, soap dish, curtain rod and toilet paper holder

k. Dry Storage 106:

Replace vinyl floor tile with new

Repaint wood shelving

l. Utility Room 105:

Repaint wood shelves

Patch ceiling as required for mechanical and electrical work

Replace existing VCT floor with new

m. Linen Closet 111 and 112:

n. Walk-In Closet 114, Closet 115 and Closet 116

Repaint shelves

o. Hallway 110:

Replace vinyl floor with new

Replace wood wall base with new

p. A/C Mechanical Room 113:

3. Type G3-56R (Type E-2 MOD), Bldgs 2501, 2503, 2507 and 2509

a. Exterior Storage (detached):

Repaint ceiling and interior walls

Repaint exterior walls

Replace existing double doors with new aluminum doors and frame

Replace existing wall louvers with new aluminum louvers with insect screen

Provide new wood 2-shelves (300-mm depth) with paint finish

Provide new acrylic elastomeric roof coating with ceramic

b. Exterior Structure:

Replace existing aluminum swing doors and frames with new, clear color

Replace existing aluminum sliding glass doors and frames with new, clear color

Replace existing awning windows with new aluminum sliding windows and frames with insect screens

Remove existing built-up roofing with insulation and provide new 4-ply built-up roofing system with insulation including SST edge flashing and all accessories

Remove and replace existing roof edge concrete curb to match new roofing system thickness

Provide new acrylic elastomeric roof coating with ceramic on new built-up roof

Paint exterior walls and soffit

c. Interior Structure:

Replace interior solid core flush wood doors and frames including hardware for all rooms, paint finish

Replace louvered swing wood doors and frames including hardware, varnish finish for all linen

Replace louvered sliding/bi-folding wood doors and frames including hardware, varnish finish for all closet including above closet storage

d. Patio and Porch:

Pressure wash concrete deck

Repaint decorative block screen wall

e. Foyer:

f. Living Room / Dining Room 104:

Provide new gypsum board ceiling with suspension system

Paint new ceiling including duct chase

Replace existing vinyl floor tile with new

g. Kitchen 105:

Replace wall and base cabinets with new plastic laminated veneer cabinets

Demolish suspended wood framed translucent panel ceiling

Provide new gypsum board ceiling including suspension system

Paint new ceiling

Replace existing with new plastic laminated countertop

Replace existing VCT floor with new

Replace existing wall base with new

Replace ceramic wall tiles

h. Master Bedroom 101, Bedroom 102 and Bedroom 103:

Provide new gypsum board ceiling including suspension system with paint finish

Paint new ceiling

Replace existing carpet floor with new carpet with padding

i. Master Half Bathroom 109/110:

Replace existing with new medicine cabinet with lights and receptacles

Replace existing with new vanity cabinet, plastic laminated finish

Replace existing bathroom wall cabinets with new

Replace gypsum board ceiling including metal suspension system with new

Paint ceiling

Replace aluminum framed glass shower enclosure

Replace existing with plastic laminated countertop with integrated lavatory sink

Replace bathroom accessories to include towel bars and rings, robe hook, soap dish and toilet paper holder

Replace existing ceramic wall and floor tiles with new

j. Bathroom 108:

Replace medicine cabinet with lights and receptacles

Replace existing with new vanity cabinet, plastic laminated finish

Replace existing with new plastic laminated countertop with integrated lavatory sink

Replace existing bathroom wall cabinets with new

Replace gypsum board ceiling including metal suspension system with new

Paint ceiling

Replace ceramic wall and floor tiles with new

Replace bathroom accessories to include towel bars and rings, robe hook, soap dish, curtain rod and toilet paper holder

k. Dry Storage 107:

Replace vinyl floor tile with new

Repaint wood shelving

l. Utility Room 106:

Repaint wood shelves

Patch ceiling as required for mechanical and electrical work

Replace existing VCT floor with new

m. Linen Closet 112 and 113:

n. Closet 115, Closet 116, Closet 117, Closet 119 and Closet 120

Repaint shelves

Replace existing vinyl/carpet flooring with new

o. Hallway 111:

Replace vinyl floor with new

Replace wood wall base with new

p. A/C Mechanical Room 114:

C. MECHANICAL/FIRE PROTECTION

1. Heating, Ventilating and Air Conditioning (HVAC)

a. Replace indoor heat pump units with programmable thermostats including all accessories, and modify A/C ductwork with duct insulations.

b. Replace outdoor heat pump units, refrigerant pipes, and insulation including all accessories.

c. Provide mechanical dehumidifier units with humidistats controls, SST outside air intake hoods, SST exhaust air hoods, SST back draft dampers, SST outside air dampers and A/C ductwork with duct insulations including all accessories.

d. Replace bathroom exhaust fans with SST exhaust air hoods, SST backdraft dampers and ducts including all accessories.

e. Replace kitchen range hoods with ducts, SST exhaust air hoods and SST backdraft dampers including all accessories.

f. Replace dryer vent ducts, SST exhaust air hoods and SST backdraft dampers including all accessories.

g. Clean all inside A/C ductworks, supply air register, supply air diffusers, and return air registers.

h. Conduct the testing, adjusting, balancing (TAB) system and commissioning of all HVAC system.

2. Plumbing

a. Replace domestic cold and hot water pipes, pipe insulations including all accessories. Point of connection to the water system shall be at the gate valve for each unit.

b. Replace electric water heater including all accessories.

c. Replace sewer line, drain line and vent line including all accessories. Point of connection to the sewer system shall be at the cleanout for each unit.

d. Replace 2-compartment stainless steel kitchen sink, single lever mixing valve faucet and spray nozzle including all accessories.

e. Replace 1-compartment composite/high density plastic service sink, faucet with vacuum breaker including all accessories.

f. Replace residential garbage disposers, air gap, drain hoses including all accessories.

g. Replace shower supply fittings, mixing valve, pan and head including all accessories.

h. Replace porcelain lavatory sinks including all accessories.

i. Replace porcelain toilets water closets including all accessories.

j. Replace enameled cast iron bathtubs, shower heads, mixing valves, including all accessories.

k. Replace hose bibbs with vacuum breaker, faucets for washing machine, valves including all accessories.

l. Conduct the tests for drainage system, vent system, building sewers and water supply systems.

m. Conduct the disinfection and flushing for entire domestic cold and hot water distribution system.

D. ELECTRICAL/COMMUNICATION/FIRE PROTECTION

Provide interior electrical system consisting of but not limited to Service Entrance Wiring and

Equipment, Distribution and Lighting Panelboards, Conduits, Feeder and Branch Circuits, Motor

Control Equipment, Lighting and Branch Wiring, Grounding, Receptacle and Branch wiring. Provide exterior communication system consisting but not limited to exterior outside plant system including

Protective Entrance Terminal (PET) and 110 block to connect existing interior communication system.

Replace interior communication and CATV system. Provide smoke alarm system to replace existing hard wired smoke alarm system. Provide accessories and devices as necessary and required for a complete and usable systems.

1. Exterior

a. Provide PET, 110 block and 20A receptacle in existing communication cabinet on exterior wall.

b. Provide communication Outside Plant (OSP) cable from PET to adjacent connection point manhole TMH-217-24. Provide OSP cable EP85-25P from TMH-217-24 to first handhole and EP85-6P from each building to first handhole.

c. Provide CATV cabinet minimum of 600mm x 600mm x 200mm. New cabinet shall be with hinged cover and lock with key. Provide 2-42mm empty conduit from new cabinet to existing CATV pedestal.

d. Replace exterior lighting fixtures.

e. Replace GFCI receptacle.

2. Interior

a. Remove all electrical fixtures such as lighting fixtures, switches, receptacles, smoke detectors, telephone outlets and CATV outlets.

b. Replace/provide new lighting fixtures.

c. Replace/provide new receptacles.

d. Replace circuit breaker panel.

e. Provide combination comm. outlet (Voice/Data) and CATV outlets. Communication and CATV cable shall be provided from each outlet to cabinet. Communication cable shall be CAT 5e or 6 and CATV cable shall be RG6.

f. Replace new smoke detectors with hard wire no standby battery type.

g. Replace ceiling fan.

h. Replace chime and push button switch.

i. Provide wiring for all electrical/mechanical equipment.

3. Electrical Notes

a. Exposed conduits shall be galvanized rigid steel (thick wall) exterior. Conduit for underground and above drop ceiling shall be type FEP or PVC. Metal wiremold shall be provided for interior exposed wiring.

b. Conductors shall be copper.

c. All electrical fixture such as lighting fixtures, receptacles, outlets, switches, ceiling fans, control equipment and all associated wiring shall be provided in accordance with following:

Air Force Family Housing Guide (AFFHG) (Aug 2014)

UFC 3-530-01 Interior and Exterior Lighting and Control (1 Apr 2015, Change 3, 1 Jun 2016)

UFC 3-520-01 Interior Electrical System (6 Oct 2015)

UFC 3-530-01 Interior and Exterior Lighting System and Controls (1 Apr 2015, Change 3, 1 Jun 2016)

UFC 3-550-01 Exterior Electrical Distribution (3 Feb 2010, Change 1, 1 Jul 2012)

UFC 3-580-01 Telecommunications Building Cabling Systems Planning and Design (1 Jun 2016, Change 1, 1 Jun 2016)

National Electrical Code (2014)

d. Life cycle cost analysis shall be provided and decide type of lighting fixture (LED or fluorescent). Lighting fixture shall be LED as much as possible.

e. All exposed conduits shall be painted to match adjacent wall/ceiling color.

f. All boxes and enclosure located wet location shall be NEMA 4X stainless steel.

E. GOVERNEMENT FURNISHED EQUIPMENT: Install equipment listed in the List of Government Furnished Material and Equipment.

7.0 SUSTAINABLE DESIGN

Provide integrated sustainable design strategies and features to minimize the energy consumption of the facilities; conserve resources; minimize adverse effects to the environment;

and improve occupant health, and comfort.

8.0 ENERGY CONSERVATION

Project shall conform to the following:

ASHRAE/IESNA Standard 90.1-2007 Energy Standard for Buildings Except Low-Rise Residential Buildings (Jan 2013)

International Energy Conservation Code (IECC) (2015)

To determine if a feature is “life-cycle cost-effective”, a life cycle cost analysis shall be performed in accordance with 10 CFR 436 Subpart A (1 Jan 2015). Any of four methods are acceptable to determine LCC: (Lower LCC, Positive net savings, Investment Ratio (SIR) greater than one, or an adjusted rate of return greater than discount rate).

9.0 SITE ANALYSIS

A. EXISTING SITE CONDITIONS

These buildings constructed in 1956 are one-story single family unit that has no covered parking. The building is constructed of concrete and has a concrete slab roof. Unit type F2-56R is a two bedroom unit designated as JNCO. Unit type G3-56R is a three bedroom unit designated as E9. Sidewalks show cracking and are worn in places. Windows show oxidation, discoloration with deteriorating sealant. There was no record of the piping under the slab being replaced. Sections of the drain piping have been replaced.

B. SITE DEVELOPMENT

Site work includes all design and construction of site features described herein to support this project, including but not limited to demolition work, trench excavation and backfilling, asphalt concrete pavement, concrete sidewalk, utility connections, and new utility lines.

New sodding will be required for all unpaved areas which will be disturbed during construction. The Contractor is responsible for obtaining/applying all the required permits.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENT

Attachment No. Description Page(s)

1 Site Plan 1

2 Floor Plan 2

3 Government Furnished Equipment Catalog Cuts 8

4 Government Furnished Material and Equipment Lis

(Reserved)

5 General Requirements 79

6 Revised Engineer System Requirements dated 30 Aug 2016 33

7 Revised Performance Technical Sections dated 30 Aug 2016 146

8 As-Built Drawings (Additional As-Built Drawings included)

9 Other Contract Requirements 6

10 RFI 1 1

11 RFI 2 4

*Copies of attachment (Attachment 6, 7 and 8) are available upon request at 18th Contracting Squadron, Bldg.95.

(End of Summary of Changes)