Question and Answer 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_Doc.pdf | ||
| Paint_Booth_Pictures.pdf | ||
| Building_Electrical_and_Ventilation_Layout.pdf | ||
| Building_Layout.pdf | ||
| Site_Visit_Form.pdf | ||
| PWS.pdf | ||
| Final_1449.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ#: FA5270-15-T-0125
Questions and Answers for Paint Booth
1. Q: Does the contractor have to be licensed in Japan to work on this project?
A: Yes, the contractor must be licensed in Japan.
2. Q: The SOW states downdraft paint booth. Does this mean a booth where air enters from the roof and exits through exhaust filters located floor level on the side walls of the booth or do they want a true down draft with an exhaust filter pit?
A: Air enters the roof and exits from the side at the bottom of the paint booth.
3. Q: Is there a bifold equipment doors or roll up equipment door for the booth?
A: It is a roll-up door.
4. Q: Are there any air make-up units, that require heating or cooling?
A: Infared heating is required
5. Q: What is the power on the base i.e.480v/3/60 or 50Hz?
A: 230V/300kw/60Hz
MCTAGUE, KILE J A1C USAF
CONTRACT SPECIALIST