PWS.pdf

PDF 17 KB Posted

Attached to
Paint Booth
Solicitation number
FA5270-15-T-0125
Issued by

About this file

Performance Work Statement

View the file

Other files

File Type Posted
Q A_2_Doc.pdf PDF
Q A_Doc.pdf PDF
Paint_Booth_Pictures.pdf PDF
Building_Electrical_and_Ventilation_Layout.pdf PDF
Building_Layout.pdf PDF
Site_Visit_Form.pdf PDF
Final_1449.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

PAINT BOOTH REPLACEMENT

AT

18 LRS/LGRV, Bldg. 241, Kadena AB, Okinawa, Japan

1 1. DESCRIPTION OF SERVICES: The contractor shall provide all management, tools, supplies, equipment, labor, manpower and appropriate licenses(s) and qualification(s) necessary to disassemble and remove existing paint booth from building 241 on Kadena AFB. The size of the old paint booth is approximately 16600mm long, 5200mm wide, and 5400mm high. The paint booth is a bolt together design with lighting and ventilation system. Disconnecting of electrical, plumbing, and ventilation system in addition to removal of all existing paint booth components are required. The use of high lift truck or platform may be required due to height of installed equipment. Disassmbled paint booth must remain on-site and placed approximately 50 meters from building in parking lot along south fence line. Contrators must also, install push pull type paint booth into building 241. Vendor must provide all electrical, plumbing, ventilation, and mounting supplies required to make paint booth operational. Vendor must install and mount paint booth inside facility and make all electrical, plumbing and ventilation connections required for operation. Installation may require high lift vehicle and/or crane due to height requirements of interior and exterior ventilation systems. All mounting, electrical, plumbing, and ventilation will be made using existing facility infrastructure. No building modifications allowed.

PERIOD OF PERFORMANCE: Disassembly will start no earlier than 15 days prior to delivery of new paint booth and total removal time is not exceed 14 Days. Installation must start within 7 days of paint booth delivery. Total install time not to exceed 30 days.

Paint booth must be fully operational upon completion.

1.1 SPECIFIC REQUIREMENTS

1.1.1 The contractor shall be required to provide the material, management, tools, supplies, equipment, labor, manpower and appropriate commercial licenses(s) and qualification(s) necessary to disassemble old paint booth, provide and install new paint booth assembly at building 241, 18 LRS/LGRV, Kadena AB, Okinawa, Japan.

1.1.2 Contractor shall provide initial training on paint booth operation and provide all associated operator manuals.

2 GENERAL INFORMATION:

2.1 HOURS OF OPERATION: Contractor Personnel shall be readily available Monday through Friday at the job site between 0730-1600hrs unless prior coordination is made.

2.1.1 Emergency Services: N/A

2.2 Contractor shall remove all construction material and debris produced during the installation of paint booth assembly at building 241, 18 LRS.LGRV, Kadena AB, Okinawa, Japan. Contractor shall ensure job site is maintained in a safe and clean manner prior to daily departure.

2.3 Standards of Conduct: Contractor Personnel must adhere to standards of conduct as established by the Installation Commander.

2.4 Security Requirements: Contractor shall adhere to current installation security policies.

2.5 The contractor shall provide an interpreter if English is not the primary language of the workers. The interpreter shall be on site at all times.

2.6 RECORDS: N/A

2.7 Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel.

2.8 SPECIAL QUALIFICATIONS: The contractor must possess all of the commercial licenses and qualifications (ex: forklift, high reach truck, etc.) necessary to provide and install paint booth assembly and sandblast room ventilation system.

3 SERVICES SUMMARY:

Performance Objective PWS Para Performance Threshold

Disassemble old paint booth, provide and install new paint booth assembly.

1.2.1 100%

4 GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES: The US Government will not provide any equipment, fuel, or personnel for the execution of this contract. Should an emergency arise, only the necessary basic lifesaving and life support measures will be provided during the emergency.

File details come from the government source that posted it. Updated .