pws final xxx.pdf

PDF 196 KB Posted

Attached to
Anderson AFB 36 FSS CDC DUCT CLEANING
Solicitation number
FA524026Q0043
Issued by

About this file

This Performance Work Statement (PWS) describes a one-time air duct cleaning and inspection contract for the Child Development Center at Andersen Air Force Base (AAFB), Guam. The contractor must provide all personnel, equipment, tools, materials, supervision, and quality control necessary to inspect and clean all HVAC ductwork and associated system components in compliance with current National Air Duct Cleaning Association (NADCA) ACR standards, Original Equipment Manufacturer (OEM) instructions, and all applicable federal, territorial, and local environmental and safety regulations. The contract period of performance extends through December 31, 2026, with work scheduled to occur between 08:00 a.m. and 5:00 p.m., excluding recognized U.S. federal holidays, at the AAFB location. The fixed price must include all inspections, cleaning, and minor repairs necessary to ensure systems operate safely and in accordance with the Performance Requirements Summary.

Key performance requirements include 100% of identified HVAC systems inspected and cleaned with zero unresolved deficiencies at acceptance, submission of all required reports and documentation on time and complete, and pre- and post-cleaning photographs or video documenting system conditions. Contractor deliverables include a Quality Control Plan within 10 calendar days of award, special qualifications documentation, identification of key personnel, and completion reports within five business days of finishing on-site services. Minor repair work must be reported within 24 hours, while major repairs exceeding $2,500 in material costs require written authorization from the Contracting Officer within 24 hours of discovery. The contractor must address potential hazardous materials including mold, microbial growth, and asbestos through precautionary protocols, with immediate work stoppage and notification procedures if such materials are suspected. All work is subject to physical inspection by Civil Engineering Contracting Flight, and failed inspections require re-cleaning at the contractor's expense. The Government furnishes utilities and facility access; the contractor furnishes all other required equipment, materials, and personnel.

View the file

Other files

File Type Posted
sheet three.pdf PDF
RFI CDC Duct_Replies (002).pdf PDF
blueprint 1v2.pdf PDF
blueprint 1v1.pdf PDF
AC Duct Cleaning PWS_Final updated 26 Aug 26 (1)X11.pdf PDF
blueprint 3 v1.pdf PDF
Solicitation - FA524026Q0043.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

PERFORMANCE WORK STATEMENT (PWS)

FOR

Child Development Center (CDC) Air Duct Cleaning Services

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform a one-time inspection and cleaning of the Child Development Center air ducts on Andersen Air Force Base (AAFB), as defined in this PWS.

The contractor shall provide a one-time inspection and cleaning for all HVAC ductwork and associated system components as identified in Technical Exhibit 3 (Estimated Workload Data). The fixed price shall include all inspections, cleaning, and minor repairs necessary to ensure the systems operate safely and in accordance with the Performance Requirements Summary (PRS).

All work conducted on the HVAC duct systems shall be In Accordance With (IAW) the applicable publications listed in Paragraph 6.0. The contractor shall adhere to the most current National Air Duct Cleaning Association (NADCA) ACR standards, Original Equipment Manufacturer (OEM) instructions, and all applicable federal, territorial (Guam), and local environmental and safety regulations.

1.2 Period of Performance (PoP): Services shall be completed no later than 31 Dec

2026.General Information:

1.2.1 The Contracting Officer (CO) will appoint a Primary and Alternate COR for this contract via a formal designation letter upon contract award. The COR will evaluate the contractor's performance and serve as the technical liaison between the contractor and the CO. The contractor shall coordinate all access, scheduling, and technical reporting through the designated COR.

1.2.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance.

1.2.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.2.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the contractor from responsibility for total performance of this contract.

1.2.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days (except where otherwise specified in this PWS, i.e. emergencies):

1.2.2.1 New Year’s Day: January 1stMartin Luther King, Jr.’s Birthday

1.2.2.2 President’s Day

1.2.2.3 Memorial Day

1.2.2.4 Juneteenth National Independence Day: June 19th

1.2.2.5 Independence Day: July 4th

1.2.2.6 Labor Day

1.2.2.7 Columbus Day

1.2.2.8 Veteran’s Day: November 11th

1.2.2.9 Thanksgiving Day

1.2.2.10 Christmas Day: December 25th

1.2.3 Quality Control (QC): The contractor shall develop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS, applicable standards, and codes listed in references in Paragraph 6.0. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). The QCP shall demonstrate how the contractor ensures quality performance during the contract period of performance. The contractor shall maintain the QCP throughout the period of performance of the contract. The CO shall be provided updates to the QCP as they occur during the period of performance. The QCP shall identify the procedures in writing for a one-time inspection and cleaning of HVAC ducts, and the location of inspection records and key control logs which shall always be available to the government upon request. The QCP shall have the inspection forms and records which shall be used for the service. The contractor shall identify to the CO/COR the responsible quality control inspector to notify in case of customer complaints. A final

QCP shall be submitted to the COR NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s acceptance in writing of any proposed changes to its QCP.

1.2.3.1 The contractor shall obtain base identification, and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation.

1.2.3.2 The contractor shall submit a written request on company letterhead to the contracting officer within 10 calendar days after contract award listing the following:

contract number, location of work site, start and stop dates, names of employees and subcontractor employees, and level of security clearance needing access to the base.

The letter will also specify the individual(s) authorized to sign a request for base identification credentials or vehicle passes. The CO will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass.

1.2.3.3 During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

1.2.3.4 When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Integrated Defense, and DODMAN5200.02_AFMAN 16-1405, Air Force Personnel Security Program.

1.2.3.5 Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

1.2.3.6 Failure to comply with these requirements may result in withholding of final payment.

1.2.3.7 For contractors that do not require CAC but require access to a DoD Facility and/or Installation. The contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)

1.2.3.8 All contractor personnel shall obtain access to the installation by participating in the Defense Biometric Identification System (DBIDS) or by obtaining passes each day from the Base Pass and Identification Office. Cost for obtaining passes through the DBIDS program is the responsibility of the contractor. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge.

1.2.3.9 The contractor shall furnish a completed Employment Eligibility Verification (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer. All contractor personnel shall obtain access to the installation by obtaining passes from the AAFB Visitor Control Center for Andersen Air Force Base, Guam properties.

1.2.3.10 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/Signature Managers/Coordinators will provide OPSEC training or training materials to contract employees within 30 days of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSE 1301 - OPSEC Fundamentals) is located on the ADLS website and refresher OPSEC training is conducted annually (at Commander's Call). The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. As required if AAFB Security Forces determines the need for access to the installation.

1.2.3.11 Company Vehicle Identification. The company name and logo shall be displayed on each of the contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid Guam license plate that complies with the Guam Vehicle Code. Vehicles shall meet all other requirement of the Guam Vehicle Code, such as safety standards, and shall carry proof of insurance and Guam registration, if applicable. All vehicles shall be maintained with a clean and orderly appearance.

Vehicles shall not be cleaned, washed, or rinsed off on Government property or facilities.

1.2.3.12 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.3.3.13Physical Security/Access to Buildings. The contractor shall comply with security requirements, plus those imposed by the installation Commander at all times.

Personnel with access to special areas shall have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas shall wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The contractor shall secure all facility doors and windows entered during non-duty hours and shall secure all facility doors and windows under the contractor’s cognizance at the end of each work day or shift period.

1.4.6.1. Schedule Coordination. The contractor shall be responsible for coordinating all phases of their operations with the appropriate base personnel through the COR/CO.

The facilities shall remain in operation while the contractor is working, and it is up to the contractor to coordinate around the normal activities of the facility. The Government may issue keys to the contractor. The contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from their action or inaction.

1.4.6.2. Place and Performance of Services: The contractor shall provide services between the hours of 08:00 am. to 5:00 pm. except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. The Contracting Officer’s Representative (COR) or Contracting Officer (CO) must approve in advance, excluding legal holidays, any exceptions to work hours and designated workdays. The contractor must submit a “Request to Work Outside Normal Hours Worksheet” (Technical Exhibit 4), 15 days prior to any work commencing. The performance will be at AAFB, Guam. The contractor shall always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons.

1.4.6.2.1 Contractor shall contact 36 CES, Customer Service at 366-2916/17/18 to apply for any service interruption. Utility outage requests shall be submitted at least thirty (30) calendar days before any outage and coordinated with COR/CO, affected tenants, and customers.

1.4.6.2 The Contractor shall make arrangements for Government escort into secured areas requiring escort. The CO shall provide information on applicable buildings, spaces, and the appropriate point of contact. The contractor may experience delays while waiting for escorts. The Government estimates the wait period can be up to 30 minutes. The contractor shall notify the COR and appropriate point of contract if an escort is not available after 30 minutes or access to accomplish the work is denied.

Unscheduled requirements, e.g., trouble calls, may require a longer wait for an escort.

1.4.6.3 Key Control. NOTE: All references to keys include key cards. The contractor shall establish and implement methods of ensuring that no keys/key cards issued by the Government are lost or misplaced or are used by unauthorized people. No keys issued by the Government shall be duplicated. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall include procedures covering key control in the QCP.

1.4.6.3.1 The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR 1.4.6.3.2

1.4.6.3.3 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the CO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the total payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system and will deduct the total cost from the total payment due the contractor.

1.4.6.3.4 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the CO.

1.4.6.4 Lock Combinations: The contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

1.2.4 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating cleaning and testing equipment used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. The contractor shall provide a copy of contractor personnel certifications/licenses performing certification to the COR within 10 days of contract award. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)

1.2.5 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the CO in accordance with FAR 42.5.

The CO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the CO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.

The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.2.6 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the CO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.2.7 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.2.7.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicle pass) to the CO within 10 days of an employee’s departure.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.12 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the CO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the CO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the CO. In the event the CO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the CO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.3 Performance of Services during Crisis Declared by The National Command Authority or The Local Installation Commander. This service does not meet the criteria for continuation of performance during a crisis.

1.4 Environmental Control. The contractor shall comply, and assure that all subcontractors comply, with all applicable federal, territory, and local laws, regulations, ordinances, policies, and standards related to environmental matters. Where applicable, the contractor shall use environmentally safe products in the course of completion of their project. The contractor shall maintain, in company vehicle on site, Safety Data Sheets (SDS) for all chemicals. A copy of all SDS shall be provided to the CO and COR. The SDS data is subject to random checks by the government. Contractor shall maintain, and provide on demand, an inventory of materials being brought on the Government facility. The contractor shall complete, and provide on demand inventory of HAZMAT, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought on to the Government facility. If the contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the contractor shall immediately notify the CO, COR, and appropriate emergency responders. The contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The contractor shall maintain a spill plan as required by federal, territory, and local laws and regulations.

1.5 Asbestos.

1.5.1 Should Asbestos or microbial growth be found, the vendor is to stop all work and inform the Government immediately for further direction. The contractor shall be responsible to have a trained “Competent Person” as defined in 29 CFR 1926.32(f) onsite that meets the requirements specified in 29CFR 1926.1101 and is trained in accordance with 40 CFR 763.92(a)(2). It is the Competent Person’s responsibility to ensure any known or suspect Asbestos Containing Materials (ACM) encountered during the performance of this PWS are managed in accordance with all Federal, territory, and local regulations as may be applicable. Any questions regarding suspect or known ACM should be directed to 36 CES Asbestos Program manager.

1.5.2 Should Asbestos or microbial growth be found, the vendor is to stop all work and inform the Government immediately for further direction Miscellaneous Asbestos Debris. Should Asbestos be found, the vendor is to stop all work and inform the Government immediately for further direction The contractor is hereby given notice that miscellaneous asbestos debris from TSI or other sources may be encountered in wall or ceiling cavities, crawl spaces, or chase ways. Any fibrous materials encountered in these areas shall be treated as friable Presumed Asbestos Containing Material (PACM) unless tested and found to be asbestos free. Any disturbance of ACM or PACM shall comply with all applicable sections of 29 CFR1926.1101. Any abatement activities shall be performed in accordance with 29 CFR1926.1101 or 29 CFR1901.1001 as may be applicable and OAC 3701-34. Any removal or disposal activities shall be performed in accordance with 40CFR 61M and OAC3745-20.

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: Post-cleaning acceptance shall be based on compliance with the current NADCA ACR Standard and the requirements of this PWS.

Following cleaning, all cleaned HVAC system components and accessible interior duct surfaces shall be free of non-adhered dust, debris, and other visible particulate contamination when inspected through service openings, access panels, or other approved observation points. The contractor shall provide pre-and post-cleaning photographs and/or video sufficient to document the condition of representative system components and duct interiors. Any deficiencies identified by the COR during inspection shall be corrected by the contractor at no additional cost to the Government

2.1.7 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.8 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.9 Acronyms:

AT/OPSEC Antiterrorism/Operational Security BI Background Investigation

CM Contract Manager CO Contracting Officer COR Contracting Officer’s Representative DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) OCI Organizational Conflict of Interest PII Personally Identifiable Information POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: Reserved

3.2 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.2 Secret Facility Clearance: Reserved

4.3 Contractor Security Clearance: Reserved

5.0 Requirements: The contractor shall perform inspection and cleaning of air duct systems as a one-time service. The contractor shall use the applicable publications listed in Paragraph 6 for guidance. All work shall be scheduled in advance with the COR, Childcare Development Center, and facility managers outside of normal operating hours to minimize disruption to government operations and employees. The government reserves the right to postpone, or interrupt scheduled services with no increase cost to the government. All work shall be physically inspected by Civil Engineering Contracting flight if the work is not acceptable to the Contracting representative the contractor shall re-clean the system until it passes inspection, re-cleanings shall be at the contractor’s expense.

Inspection and maintenance may be witnessed and certified by the government’s authorized representative. Any deficiencies, malfunctions, or discrepancies discovered as a result of these inspections maintenance shall be immediately reported to the COR by written report for determination of repair procedure. All defects found shall be corrected by the contractor under the provisions of Paragraph 5.3. After repairs are made, the failed inspection shall be re-performed at no additional cost to the government. Documentation of inspections and maintenance shall be maintained by the contractor and a copy shall be provided to the COR.

5.0 Minor Repairs.. Once identified, the contractor shall ensure all minor repair work are noted within twenty-four (24) hours, unless granted an extension by the COR. The contractor shall provide a detailed report for all repairs to the COR IAW par. 1.1.5. To reiterate, this is strictly a duct cleaning requirement.

5.1 Major Repairs. For all repair work above 2,500.00 in material costs, the contractor shall provide a detailed written repair quote to the COR within twenty-four

(24) hours of finding the deficiency, and request authorization to proceed. The written repair quote shall include, at a minimum, the following: a complete listing and estimated cost of all material, the labor hours needed to complete the repairs, and the projected time the equipment shall be out of service. The contractor shall be financially compensated for material and labor costs only if CO authorization is granted.. The contractor shall ensure all major repair work commences within two

(2) days of CO approval. The contractor shall ensure that all repair work is completed within eight (8) days of its commencement; however, the contractor is encouraged to keep equipment downtime to a minimum. The contractor shall provide a detailed repair completion report for all repairs to the COR.

5.2 Reports and Documentation. The contractor shall prepare and submit written reports and documentation for all inspections, cleaning, and minor repairs performed. If deficiencies are identified that cannot be corrected within the scope of this contract, the contractor shall notify the COR in writing within two (2) business days of discovery. A final completion report, including inspection results and documentation of work performed, shall be submitted to the COR no later than five (5) business days after completion of all on-site services. Final invoice may be submitted upon COR acceptance of the final report and completion of the required services.

5.3 Precautionary Procedures for Suspected Hazardous Materials (Mold/Asbestos).

5.3.1 Government/Contractor Assumptions. The Government does not anticipate the presenc5.3 Precautionary Procedures for Suspected Hazardous Materials (Mold/Asbestos).

5.3.2 Government/Contractor Assumptions. The Government does not anticipate the presence of hazardous mold, microbial growth, or asbestos-containing materials (ACM) during this one-time cleaning service. However, because child safety is paramount inside the Child Development Center, the contractor shall treat the following instructions as standard precautionary safety protocols.

5.3.3 Precautionary Mold Protocol (In the Event of Discovery). If the contractor suspects or encounters localized mold, mildew, or microbial growth inside the ductwork during the visual inspection, they shall clean and remediate it immediately as part of the one-time cleaning scope.

Standards: All cleaning must be done in accordance with ANSI/IICRC S520 (Standard for Professional Mold Remediation) and EPA 402-K-01-001 (Mold Remediation in Schools).

Classroom Protection: The contractor must seal off supply/return vents in the affected zone with plastic sheeting before cleaning to ensure no spores are introduced into child-care areas.

No Unauthorized Chemicals: No chemical sanitizers or biocides may be applied inside the ducts without prior submittal of Safety Data Sheets (SDS) and written approval from the COR.

5.3.4 Precautionary Asbestos Protocol (In the Event of Discovery). The contractor is advised that miscellaneous asbestos debris may be present in older base wall cavities or chase ways (as outlined in Paragraph 1.6). If the contractor suspects they have encountered asbestos-containing material inside the ductwork:

Immediate Actions: The contractor shall immediately halt work in that specific zone, seal the localized area to prevent fiber release, and notify the COR and the 36 CES

Asbestos Program Manager within two (2) hours for testing.

Remediation & Licensing: If testing confirms the presence of asbestos, and the Government directs the contractor to clean it, all abatement must be performed by certified asbestos personnel holding a valid Guam Asbestos Abatement License, operating under negative pressure containment in accordance with OSHA 29 CFR

1926.1101 (Class II HVAC rules) and EPA 40 CFR 61 Subpart M.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication

(Chapter/Page) Date of

Publication Mandatory or Advisory Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition

Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)

01/23/2014 (Change 1:

07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm

Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors

(paragraph 9)

August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201

-2.pdf

DoDM 5200.2 Procedures for the DoD Personnel Security Program

(PSP)

04/03/2017 https://www.esd.whs.mil/Directives/issuances/dodm/

DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common

Access Card (CAC)

09/09/14 (Change 1:

05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/

Homeland Security Presidential Directive (HSPD)-12

Policy for a Common Identification Standard for Federal Employees and

Contractors

08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11 Department of Defense Privacy and

Civil Liberties Programs 01/29/2019 https://www.esd.whs.mil/Directives/issuances/dodi/

DoD 5400.11-R Department of Defense Privacy

Program

05/14/2007

DoDD 8140.01 Cyberspace Workforce Management 10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/

DoD 8570.01-M Information Assurance Workforce

Improvement Program

12/19/2005 (Change 4:

11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/

DoD 5220.22-M National Industrial Security Program

Operating Manual (NISPOM)

02/28/2006 (Change 2:

05/18/2016)

AFI 10-245

Antiterrorism

03/28/2013 (Certified current

03/30/2017) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFI 31-101

Security Forces Standards and

Procedures 08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFMAN 31-113

Security Forces Standards and Procedures

03/05/2013 Change 1:

12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFPD 17-1

Information Dominance Governance and Management

04/12/2016 https://www.e-publishing.af.mil/Product-

Index/#/?view=pubs&orgID=10141&catID=1&series =-1&modID=449&tabID=131

AFMAN 17-1301

Computer Security (COMPUSEC) 02/12/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFI 10-701

Operations Security

7/24/2019 (Change 1:

06/09/2020) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

National Air Duct Cleaning Association (NADCA) guidelines. 06/01/2022 https://nadca.com/ductales/standards

OSHA Technical Manual (Section III:

Chapter 2 - Indoor Air Quality Current

Advisory https://www.osha.gov

EPA Guidelines Current https://www.epa.gov

SMACNA HVAC Duct Construction Standards Current

Edition https://www.smacna.org

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website I-9

Employment Eligibility Verification 10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf

DD 441

Department of Defense Security

Agreement

Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm

DD 250

Material Inspection and Receiving

Report

Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance

Objective Performance Standard Acceptable Quality

Levels (AQL) Surveillance

Method / By Whom

5.1 AC Duct

systems

The contractor shall inspect and clean HVAC duct systems IAW current NADCA standards and manufacturer instructions on a one-time basis.

100% of identified systems inspected and cleaned; 0 unresolved deficiencies at acceptance

Visual inspection /

COR

5.2 Reports

and Documentation

The contractor shall submit required inspection and cleaning reports to the

COR.

100% of required reports submitted on time and complete

Documentation review

/ COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title Frequency

Number of

Copies Medium/Format Submit To

1.4.3 Quality Control Plan

Provide within 10 calendar days after contract award.

1 Electronic

Submission

1.4.5.2 Contractor List of

Key Personnel

Provide within 10

COR/CO

1.4.10 Identification Media

Return within 14 days of employee’s departure from contract performance.

Original

Hard Copy

CO

1.4.7 Special Qualifications

Provide within 10

5.3 Reports and

Documentation

Provide within two (2) business days if deficiencies are noted that cannot be corrected under the scope of this contract. All other reports shall be submitted with invoices.

Electronic

TECHNICAL EXHIBIT 3

Estimated Workload Data

The estimated workload data is predicated on current known requirements and does not reflect a commitment or guarantee of firm work due to the dynamic mission of Andersen AFB. The quantities listed reflect the assets that shall be serviced which could change due to mission requirements, facility modifications or budgetary constraints.

Facility Number Facility Org Asset Type Frequency 1625 Child Development Center 36 FSS HVAC Duct One-time

Technical Exhibit 4

REQUEST TO WORK OUTSIDE NORMAL DUTY HOURS

(Page intentionally left blank. The current form will be provided at award.)

Technical Exhibit 5

UTILITY OUTAGE COORDINATION

(Page intentionally left blank. The current form will be provided at award.)

File details come from the government source that posted it. Updated .