FA524024Q3006 Attachment 1 - Statement of Work (SOW).pdf
PDF 135 KB Posted
- Attached to
- 36 CES/CEN PMO Building 27003 Asbestos/Hazmat Testing Federal contract opportunity
- Solicitation number
- FA524024Q3006
About this file
This document is a Statement of Work (SOW) for an asbestos and lead testing contract for Building 27003 on Andersen Air Force Base in Guam. The contractor shall provide all necessary labor, equipment, and supervision to conduct a comprehensive NESHAP asbestos survey and assessment of the building, including identifying, quantifying, and assessing all asbestos-containing materials. The contractor shall also test for lead-based paint using an XRF instrument. The period of performance is not to exceed 45 days after contract award.
The related federal contract opportunity is a combined synopsis/solicitation for commercial services to establish a firm-fixed-price contract for the asbestos survey and hazmat testing services described in the SOW. This is a 100% small business set-aside under NAICS code 541380 - Testing Laboratories and Services, with a $19M size standard. The solicitation number is FA524024Q3006, and the request for quotation is due no later than September 13, 2024, 4:00 PM Chamorro Standard Time. The contract will be awarded using Simplified Acquisition Procedures to the responsible offeror whose quote is most advantageous to the government.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA524024Q3006 Amendment 0001 Q A.pdf | ||
| FA524024Q3006 Attachment 5 - Evaluation Criteria.pdf | ||
| FA524024Q3006 Attachment 7 - Past Performance Fact Sheet.pdf | ||
| FA524024Q3006 Attachment 2 - Mandatory Pricing Sheet.xlsx | XLSX spreadsheet | |
| FA524024Q3006 Attachment 6 - Provisions and Clauses.pdf | ||
| FA524024Q3006 Attachment 8 - Past Performance Questionnaire.pdf | ||
| FA524024Q3006 Combined Synopsis Solicitation.pdf | ||
| FA524024Q3006 Attachment 3 - Wage Determination.pdf | ||
| FA524024Q3006 Attachment 4 - Instructions to Offerors.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Asbestos and Lead Testing of Building 27003
ON
ANDERSEN AFB, GUAM
Table of Contents
1. DESCRIPTION OF SERVICES
1.1 REQUIREMENTS:
1.2 PERIOD OF PERFORMANCE:
1.3 LIABILITY:
1.3 GOVERNMENT FURNISHED SERVICES:
2. GENERAL INFORMATION
2.1 HOURS OF OPERATION:
2.2 CONTRACTOR PERSONNEL:
3. SECURITY
3.1 PASS AND IDENTIFICATION ITEMS:
3.2 RETRIEVING IDENTIFICATION MEDIA:
3.3 TRAFFIC LAWS:
3.4 WEAPONS, FIREARMS, AND AMMUNITION:
3.5 FOR OFFICIAL USE ONLY (FOUO):
3.6 REPORTING REQUIREMENTS:
3.7 PHYSICAL SECURITY:
3.8 CONTROLLED/RESTRICTED AREAS:
3.9 MILITARY EXERCISES:
1. DESCRIPTION OF SERVICES
1.1 REQUIREMENTS:
The Contractor shall provide all transportation, planning, labor, tools, equipment, and supervision necessary to provide asbestos testing of Building 27003, Andersen AFB Guam.
The work shall include providing National Emissions Standard for Hazardous Air Pollutants (NESHAP) Asbestos Survey and testing. Contractor shall conduct a comprehensive survey of building 27003. Asbestos -containing materials (ACM) is synonymous with Asbestos Containing Building Materials (ACBM) for the purpose of this statement of work and is intended to mean all materials that would fall under either the Federal Environmental Protection Agency (EPA) Asbestos Hazard Emergency Response Act (AHERA), NESHAP asbestos standard or the OSHA asbestos standard. The survey shall include accessible areas and floors of building 27003 NOT including the roof.
The Contractor shall perform a thorough review of existing building records to include previous physical surveys and hazard assessments, drawings, specifications, past abatement actions (when information is available), inspection reports, industrial hygiene data, maintenance records and report/findings of independent asbestos surveys. Contractor shall provide a roster of all homogenous materials (e.g. flooring in room X is the same as rooms X, XX, XX)
The Contractor shall document the presence or absence of ACM in the survey report and provided to the Andersen Asbestos Program Manager. The Contractor shall identify, quantify and assess all ACM and suspected ACM during the survey and categorize each material according to the AHERA physical and hazard assessment system and AHERA response categories. The Contractor’s accredited Building Inspectors shall conduct a Physical Assessment and Hazard Assessment of friable and non-friable ACM in every accessible building space included in the survey, identify types, locations, quantities and conditions of ACM.
Transmission Electron Microscopy (TEM) sampling may be required to confirm the presence of asbestos in Vinyl Asbestos Tile (VAT).
The Contractor’s accredited Lead Inspector shall test potential Lead Based Paint (LBP) coated surfaces using an X-ray Fluorescence (XRF) instrument. Paint chip sample method should only be used to confirm inconclusive XRF results.
1.2 PERIOD OF PERFORMANCE:
The period of performance shall be for 45 days after award of contract.
1.3 LIABILITY:
The contractor shall be liable for any damages resulting from any carelessness or failure to follow proper safety, installation, engineering, or maintenance procedures and standards.
1.4 GOVERNMENT FURNISHED SERVICES:
The government will provide emergency medical transportation and treatment if required. The contractor shall reimburse the Government for the cost of these medical services at current rates.
2. GENERAL INFORMATION
2.1 HOURS OF OPERATION:
The normal hours of operation for the project are from 0730 to 1630, Monday through Friday, excluding holidays and PACAF Family days.
2.2 CONTRACTOR PERSONNEL:
The contractor shall provide point of contact (POC) for all contractual matters during all hours of operation. The POC shall respond on-site within 1 hour during normal duty hours of operation and within 2 hours during non-duty hours to discuss concerns with government personnel designated by the CO to discuss problem areas.
3. SECURITY
3.1 PASS AND IDENTIFICATION ITEMS:
The contractor shall ensure the pass and identification items required for contract performance are obtained for employees.
3.2 RETRIEVING IDENTIFICATION MEDIA:
The contractor shall return all identification media and/or visitor passes from employees who depart for any reason before the contract expires; i.e. terminated for cause, reassignment, retirement, etc.
3.3 TRAFFIC LAWS:
The contractor and its employees shall comply with base traffic regulations. Traffic regulations include, but are not limited to:
· Employees shall wear seatbelts when operating or riding in any vehicle (military, company or private owned) while on installation.
· Speed limits on Andersen AFB are 25 MPH unless otherwise posted. Be aware of reduced speed limits and exercise caution when driving in base housing and school zones.
· All vehicle operators on the installation shall not use cell phones unless the vehicle is safely parked or they are using a 100% hands free device. The wearing of any other portable headphones, earphones or other listening devices while operating a motor vehicle is prohibited.
3.4 WEAPONS, FIREARMS, AND AMMUNITION:
Employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within vehicles (military, contractor-owned, or privately owned) while on Andersen AFB.
3.5 FOR OFFICIAL USE ONLY (FOUO):
The contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
3.6 REPORTING REQUIREMENTS:
Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified/unclassified defense information. Employees shall be briefed by their immediate supervisor upon initial on-base assignment.
3.7 PHYSICAL SECURITY:
The contractor shall be responsible for safeguarding all Government property and controlled forms provided for contractor use. At the end of each work period, all Government facilities, equipment and materials shall be secured.
3.8 CONTROLLED/RESTRICTED AREAS:
The contractor shall implement local base procedures for entry to AF Controlled/Restricted areas where contractor personnel will work. An AF Form 2586, Unescorted Entry Authorization Certificate, must be completed and signed by 36 XXX security manager before restricted area badges (RAB) will be issued. Employees must have a completed and favorable NACI investigation before receiving a RAB. Interim access can be granted in accordance with AFI 31- 501, Personnel Security Program Management.
3.9 MILITARY EXERCISES:
No compensation will be claimed for any delays resulting from re-entry procedures due to exercises.
| 1. DESCRIPTION OF SERVICES |
| 1.1 REQUIREMENTS: |
| 1.2 PERIOD OF PERFORMANCE: |
| 1.3 LIABILITY: |
| 1.4 GOVERNMENT FURNISHED SERVICES: |
| 2. GENERAL INFORMATION |
| 2.1 HOURS OF OPERATION: |
| 2.2 CONTRACTOR PERSONNEL: |
| 3. SECURITY |
| 3.1 PASS AND IDENTIFICATION ITEMS: |
| 3.2 RETRIEVING IDENTIFICATION MEDIA: |
| 3.3 TRAFFIC LAWS: |
| 3.4 WEAPONS, FIREARMS, AND AMMUNITION: |
| 3.5 FOR OFFICIAL USE ONLY (FOUO): |
| 3.6 REPORTING REQUIREMENTS: |
| 3.7 PHYSICAL SECURITY: |
| 3.8 CONTROLLED/RESTRICTED AREAS: |
| 3.9 MILITARY EXERCISES: |
File details come from the government source that posted it. Updated .