FA524023R0005 Attachment 1 - Performance Work Statement (PWS).pdf
PDF 261 KB Posted
- Attached to
- Waste Water Maintenance Services Federal contract opportunity
- Solicitation number
- FA524023R0005
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA524023R0005 – Waste Water Services Attachment 1 – Performance Work Statement (PWS)
PERFORMANCE WORK STATEMENT
FOR
WASTE WATER SERVICES
Andersen Air Force Base, Guam
12 DECEMBER 2022
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform the inspection, pumping, cleaning, of septic holding tanks, grease traps, and sewer lift stations on Andersen Air Force Base (AAFB), as defined in this PWS.
This full maintenance requirement signifies a waste water service provider (contractor) that takes total service responsibility for all equipment identified. The fixed price includes all inspection, pumping, cleaning, of septic holding tanks, grease traps, and sewer lift stations on a recurring basis. The contractor assumes all responsibility and determines the amount of service visits and types of service required to keep all waste water operating properly and safely within the performance objectives in the Performance Requirements Summary.
Work conducted on Waste Water shall be In Accordance With (IAW) applicable references listed in Paragraph 6.0, industry standards, and the recommendations of the Original Equipment Manufacturer (OEM).
1.2 Background: The 36th Civil Engineering Squadron provides management and the safe operations of inspection, pumping, cleaning, and disposal of septic holding tanks, grease traps, and sewer lift stations throughout AAFB. The preventive maintenance service calls are necessary to ensure continuous operation to the septic holding tanks, grease traps, and sewer lift stations.
1.3 Period of Performance (PoP): The Period of Performance shall be one (1) Base Year of twelve (12) months and four (4) 12-month option years.:
Base Year: 01 April 2023 – 31 March 2024 Option Year 1: 01 April 2024 – 31 March 2025 Option Year 2: 01 April 2025 – 31 March 2026 Option Year 3: 01 April 2026 – 31 March 2027 Option Year 4: 01 April 2027 – 31 March 2028
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 7:30 a.m. to 4:30 p.m. on Monday through Friday except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. The Contracting Officer’s Representative (COR) or Contracting Officer (CO) must approve in advance, excluding legal holidays, any exceptions to work hours and designated workdays. The contractor must submit a “Request to Work Outside Normal Hours Worksheet” (Technical Exhibit 3), 15 days prior to any work commencing. The performance shall be at AAFB, Guam.
The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.
1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.
1.4.1.2 Unscheduled gate closures by the Security Forces may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation.
Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance.
The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days (except where otherwise specified in this PWS, i.e. emergencies):
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS, applicable standards, and codes listed in references in Paragraph 6.0. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS).
The QCP shall demonstrate how the contractor ensures quality performance during the contract period of performance. The contractor shall maintain the QCP throughout the period of performance of the contract. The CO/COR shall be provided updates to the QCP as they occur during the period of performance and provide all updates to the QCP within two (2) business days. The QCP shall identify the procedures in writing for inspections, individual responsible, periodic inspection (PI), preventative maintenance (PM) program, services, and the location of all inspection records and key control logs which shall always be available to the government upon request. The QCP shall have the inspection forms and records which shall be used for the service. The contractor shall identify to the CO/COR the responsible quality control inspector to notify in case of customer complaints. A final QCP shall be submitted to the COR and CO NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s acceptance in writing of any proposed changes to its QCP.
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Performance Thresholds in Technical Exhibit 1. This plan is solely maintained by the Government and is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR/CO. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office.
The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
1.4.5.2 The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, names of employees and subcontractor employees, and level of security clearance needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The CO will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass.
1.4.5.3 During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
1.4.5.4 When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with DAFI 31-101, Integrated Defense, and DODMAN5200.02_AFMAN 16-1405, Air Force Personnel Security Program.
1.4.5.5 Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
1.4.5.6 Failure to comply with these requirements may result in withholding of final payment.
1.4.5.7 For contractors that do not require CAC, but require access to a DoD Facility and/or Installation. The contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, DAFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)
1.4.5.8 All contractor personnel shall obtain access to the installation by participating in the Defense Biometric Identification System (DBIDS) or by obtaining passes each day from the Base Pass and Identification Office. Cost for obtaining passes through the DBIDS program is the responsibility of the contractor. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge.
1.4.5.9 The contractor shall furnish a completed Employment Eligibility Verification (DHS FORM I-9) form for all personnel requesting badges. This form is available at. Immediately report instances of lost or stolen badges to the Contracting Officer. All contractor personnel shall obtain access to the installation by obtaining passes from the AAFB Visitor Control Center for Andersen Air Force Base, Guam properties.
1.4.5.10 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/Signature Managers/Coordinators will provide OPSEC training or training materials to contract employees within 30 days of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter.
General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSE 1301 - OPSEC Fundamentals) is located on the ADLS website and refresher OPSEC training is conducted annually (at Commander's Call). The contractor shall submit certificates of completion for each contractor employee to the COR and CO within 15 http://static.e-publishing.af.mil/production/1/af_a4/publication/afi31-101/generic_wms.pdf https://static.e-publishing.af.mil/production/1/saf_aa/publication/dodman5200.02_afman16-1405/dodm5200.02_afman16-1405.pdf calendar days after completion of training. As required if AAFB Security Forces determines the need for access to the installation.
1.4.5.11 Company Vehicle Identification. The company name and logo shall be displayed on each of the contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid Guam license plate that complies with the Guam Vehicle Code. Vehicles shall meet all other requirement of the Guam Vehicle Code, such as safety standards, and shall carry proof of insurance and Guam registration, if applicable. All vehicles shall be maintained with a clean and orderly appearance. Vehicles shall not be cleaned, washed, or rinsed off on Government property or facilities.
1.4.5.12 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.
Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.6 Physical Security/Access to Buildings. The contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas shall have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas shall wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The contractor shall secure all buildings and facilities entered during non-duty hours and shall secure all building and facilities under the contractor’s cognizance at the end of each work day or shift period.
1.4.6.1. Schedule Coordination. The contractor shall be responsible for coordinating all phases of their operations with the appropriate base personnel through the COR/CO. The facilities shall remain in operation while the contractor is working, and it is up to the contractor to coordinate around the normal activities of the facility. The Government may issue keys to the contractor.
The contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from their action or inaction.
1.4.6.1.1 Contractor shall contact 36 CES, Customer Service at 366-2916/17/18 to apply for any service interruption. Utility outage requests shall be submitted at least thirty (30) calendar days before any outage and coordinated with COR/CO, affected tenants, and customers.
1.4.6.2 The contractor shall make arrangements for Government escort into secured areas requiring escort. The CO shall provide information on applicable buildings, spaces, and the appropriate point of contact. The contractor may experience delays while waiting for escorts.
The Government estimates the wait period can be up to 30 minutes. The contractor shall notify the COR and appropriate point of contract if an escort is not available after 30 minutes or access to accomplish the work is denied. Unscheduled requirements, e.g., trouble calls, may require a longer wait for an escort.
1.4.6.3 Key Control. NOTE: All references to keys include key cards. The contractor shall establish and implement methods of ensuring that no keys/key cards issued by the Government are lost or misplaced or are used by unauthorized persons. No keys issued by the Government shall be duplicated. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall include procedures covering key control in the QCP.
1.4.6.3.1 The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.
1.4.6.3.2 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the CO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system, and will deduct the total cost from the monthly payment due the contractor.
1.4.6.3.3 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the CO.
1.4.6.4 Lock Combinations: The contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating tools and equipment used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the CO in accordance with FAR 42.5. The CO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the CO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the
Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the CO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the CO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the CO within 10 days of an employee’s departure.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract;
procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.12 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the CO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the CO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the CO. In the event the CO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the CO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.5 Performance of Services during Crisis Declared by The National Command Authority or The Local Installation Commander. This service meets the criteria for continuation of performance during a crisis.
1.6 Environmental Control. The contractor shall comply, and assure that all subcontractors comply, with all applicable federal, territory, and local laws, regulations, ordinances, policies, and standards related to environmental matters. Where applicable, the contractor shall use environmentally safe products in the course of completion of their project. The contractor shall maintain, in company vehicle on site, Safety Data Sheets (SDS) for all chemicals. A copy of all SDS shall be provided to the CO and COR. The SDS data is subject to random checks by the government. Contractor shall maintain, and provide on demand, an inventory of materials being brought on the Government facility. The contractor shall complete, and provide on demand, monthly inventories of HAZMAT used, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought on to the Government facility. If the contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the contractor shall immediately notify the CO, COR, and appropriate emergency responders. The contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The contractor shall maintain a spill plan as required by federal, territory, and local laws and regulations.
1.7 Asbestos.
1.7.1 The contractor shall be responsible to have a trained “Competent Person” as defined in 29 CFR 1926.32(f) onsite that meets the requirements specified in 29CFR 1926.1101 and is trained in accordance with 40 CFR 763.92(a)(2). It is the Competent Person’s responsibility to ensure any known or suspect Asbestos Containing Materials (ACM) encountered during the performance of this PWS are managed in accordance with all Federal, territory, and local regulations as may be applicable. Any questions regarding suspect or known ACM should be directed to 36 CES Asbestos Program manager.
1.7.2 Miscellaneous Asbestos Debris. The contractor is hereby given notice that miscellaneous asbestos debris from TSI or other sources may be encountered in wall or ceiling cavities, crawl spaces, or chase ways. Any fibrous materials encountered in these areas shall be treated as friable Presumed Asbestos Containing Material (PACM) unless tested and found to be asbestos free.
Any disturbance of ACM or PACM shall comply with all applicable sections of 29 CFR1926.1101. Any abatement activities shall be performed in accordance with 29
CFR1926.1101 or 29 CFR1901.1001 as may be applicable and OAC 3701-34. Any removal or disposal activities shall be performed in accordance with 40CFR 61M and OAC3745-20.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager CO Contracting Officer COR Contracting Officer’s Representative DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive
IA Information Assurance IS Information System(s) OCI Organizational Conflict of Interest PII Personally Identifiable Information POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property: Reserved.
3.2 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E): The contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain continuous and safe operations of septic holding tanks, grease traps, and sewer lift stations at Andersen AFB, Guam.
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.2 Secret Facility Clearance: Reserved.
4.3 Contractor Security Clearance: Reserved.
5.0 Requirements: The contractor shall perform periodic inspection, pumping, cleaning, of septic holding tanks, grease traps, and sewer lift stations on a recurring basis. Additionally, the contractor shall provide emergency pumping when notified twenty-four (24) hours a day seven
(7) days a week. The contractor shall use the applicable publications listed in Appendix C for guidance. Containment and disposal of any spill occurring during the performance of this contract to be immediately cleaned up on the day of the spill. Cost incurred by the government for contractor’s spill cleanup will be deducted from any payment due the contractor. All recurring work tasks shall be scheduled in advance with the Contracting Officer Representative (COR) and facility managers to minimize disruption to government operations and employees.
5.1 Septic Holding Tanks. Empty septic tanks of all contents that includes but is not limited to scum, liquid, and solids. Close septic tank in accordance with requirements of state health department and dispose of at an approved off-base dump facility. Submit documentation of inspections to the COR.
5.2 Sewer Lift Stations (SLS). Empty SLS of all contents that includes but is not limited to scum, liquid, and solids. Close SLS in accordance with requirements of state health department and dispose of at an approved off-base dump facility. Submit documentation of inspections to the
COR.
5.3 Grease Traps. Pump out all grease and residues from trap; remove waste build up from trap or pit walls and all associated equipment within the pit. Flush down with water and pump out remaining residue as required by the unique configuration of the grease trap. Residual or recharge water must be higher than lower inlets. Clear obstructions in inlet/outlet pipes to ensure unrestricted flow. Transport all materials from grease traps to an approved off-base storage facility. Submit documentation of inspections to the COR.
5.4 Used Cooking Oil Disposal. The contractor shall pump used cooking oil from storage containers and dispose of it IAW local and federal laws. This will be performed as an on-call service.
5.5 Emergency Services. The contractor shall provide emergency pumping capabilities twenty-four (24) hours a day seven (7) days a week. The contractor shall respond within two (2) hours of notification by the COR or Contacting Officer (CO) during normal duty hours and three (3) hours outside of normal duty hours.
5.6 Reports and Documentation. The contractor shall prepare and submit monthly written reports and documentation for the periodic inspection, and contents disposal of each asset. The reports and documentation shall be forwarded to the COR within two (2) business days if discrepancies are found during inspections. Otherwise, reports shall be submitted with the invoice. The reports and documentation shall include but not limited to: location, type asset, manufacturer, and model number, as applicable, of each asset. The work performed, date of inspection, name of technician, and overall condition of the equipment. At no time shall any service be considered complete until a report has been received and accepted by the COR.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication
(Chapter/Page)
Date of Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar
Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/cu rrent/index.html or https://www.acquisition.gov/dfars
Joint Travel Regulation (JTR) https://www.travel.dod.mil/
DoDM 1000.13-M-V1
DoD Identification (ID) Cards
(Enclosure 2, paragraph 3.b)
01/23/2014
(Change 1:
07/28/2020) http://www.esd.whs.mil/Directives/issuances/ dodm
Federal Information Processing Standards (FIPS) Publication 201-
Personal Identity Verification (PIV) of Federal Employees and Contractors
(paragraph 9)
August http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FI PS.201-2.pdf
DoDM 5200.2 Procedures for the DoD Personnel Security Program
(PSP)
04/03/2017 https://www.esd.whs.mil/Directives/issuances /dodm/
DoDI 5200.46
DoD Investigative and Adjudicative Guidance for Issuing the Common Access Card (CAC)
09/09/14
(Change 1:
05/04/2018) https://www.esd.whs.mil/Directives/issuances /dodi/
Homeland Security Presidential Directive (HSPD)-12
08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars https://www.travel.dod.mil/ http://www.esd.whs.mil/Directives/issuances/dodm http://www.esd.whs.mil/Directives/issuances/dodm http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12
Policy for a Common Identification Standard for Federal Employees and Contractors
DoDI 5400.11
Department of Defense Privacy and Civil Liberties Programs
01/29/2019
/dodi/
DoD 5400.11-R
Department of Defense Privacy Program
05/14/2007 https://www.esd.whs.mil/Directives/issuances /dodm/
DoDD 8140.01
Cyberspace Workforce Management
10/05/2020
/dodd/
DoD 8570.01-M
Information Assurance Workforce Improvement Program
12/19/2005 (Change 4:
11/10/2015)
DoD 5220.22-M
National Industrial Security Program Operating Manual
(NISPOM)
02/28/2006
(Change 2:
05/18/2016)
AFI 10-245
Antiterrorism
03/28/2013
(Certified current 03/30/2017) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1 &series=-1&modID=449&tabID=131
DAFI 31-101
Security Forces Standards and Procedures
08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1 &series=-1&modID=449&tabID=131
AFMAN 31-113
Security Forces Standards and Procedures
03/05/2013
Change 1:
12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1 &series=-1&modID=449&tabID=131
AFPD 17-1
Information Dominance Governance and Management
04/12/2016 https://static.e-publishing.af.mil/production/1/saf_cio_a6/pu blication/afpd17-1/afpd_17-1.pdf https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/
DAFMAN 17-1301
Computer Security (COMPUSEC)
02/12/2020 https://static.e-publishing.af.mil/production/1/saf_cn/publica tion/afman17-1301/afman17-1301.pdf
AFI 10-701
Operations Security
7/24/2019
(Change 1:
06/09/2020) https://static.e-publishing.af.mil/production/1/af_a3/publicati on/afi10-701/afi10-701.pdf
29 CFR 1910.1200, Hazard Communication https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.1
40 CFR Part 302, Table 302.4, List of Hazardous Substances and Reportable Quantities https://www.ecfr.gov/current/title-40/chapter- I/subchapter-J/part-302
40 CFR Part 355 with Appendices, Emergency Planning And Notification https://www.ecfr.gov/current/title-40/chapter- I/subchapter-J/part-355
40 CFR 372.65, Specific Toxic Chemical Listings https://www.ecfr.gov/current/title-40/chapter- I/subchapter-J/part-372
40 CFR Park 261, Identification And Listing Of Hazardous Waste https://www.ecfr.gov/current/title-40/chapter- I/subchapter-I/part-261
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
Form Date Website
DD 1172-2
Application for Identification Card/DEERS Enrollment
Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm
I-9
Employment Eligibility Verification
10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i- 9.pdf
DD 441
Department of Defense Security Agreement
Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms000 1-0499.htm
DD 250
Material Inspection and Receiving Report
Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/ http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/index.htm https://www.uscis.gov/sites/default/files/files/form/i-9.pdf https://www.uscis.gov/sites/default/files/files/form/i-9.pdf http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm https://www.esd.whs.mil/Directives/forms/dd0001_0499/
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Performance Thresholds.
Performance Objective
PWS
Ref
Performance Standard Performance Threshold
(SS-1) Quality Control Plan
(QPC)
Procedures
1.4.3 The contractor shall develop and maintain
an effective Quality Control Plan (QCP)
IAW PWS.
The Contractor maintained QCP that identifies all the following IAW the PWS. Procedures in writing for inspections, individual responsible, periodic inspection (PI) & preventive maintenance (PM) program, as well as the location of all inspection records and provided all updates to the QCP to the COR/CO within two (2) business days 100% of the time.
(SS-2) Septic Holding Tanks
5.1 Empty septic tanks of all contents that
includes but is not limited to scum, liquid, and solids. Close septic tank in accordance with requirements of state health department and dispose of at an approved off-base dump facility. Submit documentation of inspections to the COR.
Performed 100% of the time.
(SS-3) Sewer Lift Stations
(SLS)
5.2 Empty SLS of all contents that includes but
is not limited to scum, liquid, and solids.
Close SLS in accordance with requirements of state health department and dispose of at an approved off-base dump facility. Submit documentation of inspections to the COR.
Performed 100% of the time.
(SS-4) Grease Traps
5.3 Pump out all grease and residues from trap;
remove waste build up from trap or pit walls and all associated equipment within the pit. Flush down with water and pump out remaining residue as required by the unique configuration of the grease trap.
Residual or recharge water must be higher than lower inlets. Clear obstructions in inlet/outlet pipes to ensure unrestricted flow. Transport all materials from grease traps to an approved off-base storage facility. Submit documentation of inspections to the COR.
Performed 100% of the time.
(SS-5)
Emergency Services
5.5 The contractor shall provide emergency
pumping capabilities 24 hours a day 7 days a week. The contractor shall respond within two (2) hours of notification by the COR or Contacting Officer (CO) during normal duty hours and three (3) hours outside of normal duty hours.
Response to emergency calls within two (2) hours of notification by the COR or CO during normal duty hours and three (3) hours outside of normal duty hours at least 90% of the time.
(SS-6) Reports and Documentation
5.6 The contractor shall prepare and submit
written reports and documentation for the periodic inspection, and contents disposal of for each asset. The reports and documentation shall be forwarded to the COR within two (2) business days if discrepancies are found during inspections.
Otherwise, reports shall be submitted with the invoice. The reports and documentation shall include but not limited to: location, type asset, manufacturer, and model number, as applicable, of each asset. The work performed, date of inspection, name of technician, and overall condition of the equipment. At no time shall any service be considered complete until a report has been received and accepted by the COR.
Reports and documentation submitted to the COR within two (2) business days of the completion of any service 100% of the time.
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS Reference / Deliverable Title
Frequency Number of Copies
Medium/Format Submit To
1.4.3 Final
Quality Control Plan
Within ten (10) calendar days of contract.
1 Electronic Submission
COR
1.4.5.2 Within ten (10) calendar
days of contract award
1 Electronic Submission
COR/CO
1.4.5.3 AT Level
1 Awareness Training Certificates
Provide within fifteen (15) calendar days after employee completes training.
1 Electronic Submission
COR
1.4.5.11 OPSEC
Training Certificates
Provide within fifteen (15) calendar days after employee completes training.
1 Electronic Submission
COR
1.4.7 Special
Qualifications
Within ten (10) calendar days of contract award or when personnel changes.
1 Electronic Submission
COR
1.4.10 Identification Media
Return within fourteen
(14) days of employee’s departure from contract performance.
Original(s) Hard Copy CO
5.6 Reports and
Documentation
Provide within two (2) business days
1 Electronic Submission
COR
TECHNICAL EXHIBIT 3
Estimated Workload Data
This information is provided for historical background only. It is not a guarantee of workload quantities.
Facility Number Facility Org Asset Type
Capacity
(Gals) Frequency
9507 Tarague Beach 36 FSS Septic Tank 2,500 Bi-Monthly
9604 Serena Beach 36 FSS Septic Tank 1,000 Bi-Monthly
9623 Firing Range 36 SFS Septic Tank 2,500 Bi-Monthly
10, 30 Det 2, 21 SOPS 21 SOP Septic Tank 500 Twice Annually
32, 34 Det 2, 21 SOPS 21 SOP Septic Tank 12,000 Twice Annually
2403 Pass & ID (Front Gate) 36 SFS Septic Tank 1,700 Twice
Annually
2510 Maintenance Facility 36 EAMXS Septic Tank 4,000 Twice Annually
2552 Entomology 36 CES Septic Tank 1,000 Twice Annually
2642 CFWP AIMD/ASD Navy Septic Tank 3,500 Twice Annually
2659 Fire Station 2 36 CES Septic Tank 3,500 Twice Annually
2750 Comm Building 36 COM Septic Tank 500 Twice Annually
2799 Entomology 36 CES Septic Tank 1,000 Twice Annually
9018 Munitions 36 MUNS Septic Tank 32,000 Twice
Maintenance Annually
9052 Hunter Safety Shack 36 CES Septic Tank 500 Twice Annually
9200 Munitions Maintenance 36 MUNS Septic Tank 28,000 Twice
Annually
14507 Tank Farm (Andy II) 36 LRS Septic Tank 500 Twice Annually
14615 North Gate Visitor Ctr 36 SFS Septic Tank 750 Twice
Annually
14625 North Gate Inspection 36 SFS Septic Tank 750 Twice
Annually
1295 Sewer Lift Station 36 CES 8 Hrs Quarterly
1881 Sewer Lift Station 36 CES 24 Hrs Quarterly
61830 Sewer Lift Station 36 CES 8 Hrs Quarterly
40030A Sewer Lift Station 36 CES 8 Hrs Quarterly
1098 Sewer Lift Station 36 CES 8 Hrs Quarterly
14539 Sewer Lift Station 36 CES 4 Hrs Twice Annually
14540 Sewer Lift Station 36 CES 4 Hrs Twice Annually
17016 Sewer Lift Station 36 CES 4 Hrs Twice Annually
18110 Sewer Lift Station 36 CES 4 Hrs Twice Annually
24016 Sewer Lift Station 36 CES 4 Hrs Twice Annually
24102 Sewer Lift Station 36 CES 4 Hrs Twice Annually
40000 Sewer Lift Station 36 CES 4 Hrs Twice Annually
14537 Sewer Lift Station 36 CES 4 Hrs Twice
14525 Sewer Lift Station 36 CES 4 Hrs Twice
17002 Fire Station 1 36 CES Grease Trap 3 Hrs Monthly
61210 Fire Station 4 36 CES Grease Trap 3 Hrs Monthly
B25005 Gecko Lanes (Outside) 36 FSS Grease Trap 3 Hrs Monthly
B25005 Gecko Lanes Inside (2 x 40 LBS) 36 FSS Grease Trap 3 Hrs Monthly
B25010 Magellan Inn 36 FSS Grease Trap 6 Hrs Monthly
B27030 Burger King AAFES Grease Trap 3 Hrs Monthly
B24016 Base Exchange AAFES Grease Trap 8 Hrs Monthly
1091 Sunrise Conference Center 36 FSS Grease Trap 3 Hrs Monthly
1625 Child Development Center 36 FSS Grease Trap 3 Hrs Quarterly
9509 Bamboo Willies 36 FSS Grease Trap 3 Hrs Quarterly
Multiple Emergency Service 36 CES Multiple 150 Hrs On-Call
Technical Exhibit 4
REQUEST TO WORK OUTSIDE NORMAL DUTY HOURS
(Page intentionally left blank. The current form will be provided at award.)
Technical Exhibit 5
UTILITY OUTAGE COORDINATION
(Page intentionally left blank. The current form will be provided at award.)
File details come from the government source that posted it. Updated .