Project No. AJJY 22-1056_Questions & Answers (Q&A)_ 23JUN22.pdf

PDF 148 KB Posted

Attached to
Renovate SFS Military Working Dog Kennel Training Area
Solicitation number
FA524022R0013
Issued by

About this file

This document contains a questions and answers file related to a federal solicitation for renovations to military working dog kennels at Andersen Air Force Base in Guam. The solicitation seeks a design-build contractor to renovate two kennel buildings by repairing doors and drains, applying new rhino lining epoxy coating with grit, painting, and installing artificial grass for training. The period of performance is 500 calendar days with a contract value between $1-5 million. The work must be completed by a HUBZone small business. The questions and answers provide details on removing and replacing the existing epoxy coating, acceptable coating alternatives, coating application timelines, and occupancy of kennels during work.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

23 June 2022

Notice ID: FA524022R0013-Solicitation

Project Title: Project No. AJJY 22 1056 RENOVATE SFS MWD KENNEL TRAINING AREA

AAFB GUAM

QUESTIONS and ANSWERS (Q&A)

QUESTION 01:

Are all areas of existing epoxy coating in kennels to be removed and replaced?

ANSWER 01:

Both Bldg. 2414 and 2416 will have to be redone. In building 2414 there is no texture or grit in the paint which makes it very slick for the MWDs and causes them to injure themselves. In building 2416 there was texture/grit applied to the epoxy however, there is now moisture under the epoxy which is creating bubbles under the paint and causing the paint to chip and peel away.

QUESTION 02:

Is an alternate epoxy coating to Rhino Lining acceptable?

ANSWER 02:

Contractor shall use equal to or better than rhino lining epoxy. It needs sand or grit in it to make the floor nonstick.

QUESTION 03:

What will be the working time / duration for application of epoxy coating?

ANSWER 03:

Customer need the safety data sheet before determining cure time and work time.

QUESTION 04:

Will any of kennels be occupied during installation of epoxy coating? Example; will the kennels be vacant during the day and need to be in occupied during the evening etc.

ANSWER 04:

The kennels cannot be occupied and time will be determined based on Safety data sheet.