This document contains a questions and answers file related to a federal solicitation for renovation and lightning protection system installation services at Andersen Air Force Base in Guam. The solicitation seeks proposals to replace carpets in offices and hallways, relocate a door, adjust ceiling tiles and metal studs, prepare painted wall panels, replace an office door, and provide lightning protection and grounding for antennas on the roof. The period of performance is 240 calendar days. Proposals are due through the Procurement Integrated Enterprise Environment by the deadline. The acquisition is set aside as a HUBZone small business opportunity within NAICS code 236220 with a size standard of $39.5 million. A site visit will be held on May 17th. Requests for information are due by May 24th.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19 May 2022

Notice ID: FA524022R0009-Solicitation

Project Title: Project No. AJJY 22 1059 RENOVATE MSG HQ AND INSTALL LPS1

GROUNDING B23028 AAFB GUAM

QUESTIONS and ANSWERS (Q&A)

QUESTION 01:

Item # 1- to replace carpets & offices & hallways. How many offices and hallways to replace the carpets?

ANSWER 01:

Please see attached floor plan (Provided in the SOW – Attachment 1), which shows the extent of the carpet that needs replacement.

QUESTION 02:

1915 SF- carpet replacement shown in office # 121 floor plan. This quantity is for office no.121 & hallway?

ANSWER 02:

The area is for reference only and the actual area has to be verified by the contractors.

QUESTION 03:

SOW requires a Lightning Protection and grounding system. Please advise if we need to provide new ground loop conductors around the building.

ANSWER 03:

This is a design build project. The contractor’s DOR will provide the design in compliance to UFC, UFGS and other code requirements to provide the LPS for the antennas only.

QUESTION 04:

Please confirm that lightning protection is only for the existing antennas and not for the whole building.

ANSWER 04:

The LPS requirements is for the existing antennas only.