SOW_for_Court_Refurbishment_final.docx

DOCX document 18 KB Posted

Attached to
Repair Fitness Center Basketball and Raquetball Courts
Solicitation number
FA5240-15-Q-M048
Issued by

View the file

Other files

File Type Posted
FA5240-15-Q-M048_Q A.docx DOCX document
Refurbish_Courts_Pictures.pptx PPTX presentation
FA5240-15-Q-M048 _Amendment_1.pdf PDF
Combo.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Repair Fitness Center Basketball and Racquetball Courts

1. OBJECTIVE: Refinish basketball and racquetball courts and all associated items at Bldg 25045 (Coral Reef Fitness Center). The service shall be in accordance to the following codes: IBC, NECM, NFPA, LOCAL CODE, Seismic Zone-4 and other unified standard engineering guide construction. All new installed material items are to be fully operational and meet all the required codes. Work shall be completed as to limit the down time for existing business operations.

2. WORK LOCATION: Bldg 25045 (Coral Reef Fitness Center), NSA Andersen, Guam

3. WORK HOURS: Allowable work hours will be from 0730-1630, Mondays through Fridays, excluding federal holidays. No work shall be performed outside of normal duty hours unless authorized in writing by the Contracting Officer. Work outside normal work hours must be requested at least 3 working days in advance.

3. PRINCIPAL FEATURES: The work required is to include but is not limited to the furnishing of materials, equipment, facilities, transportation, labor, and supervision required to accomplish the following:

SITE DEMO and NEW INSTALLATIONS

a. Remove both basketball and both racquetball courts finish and markings/stripping to the level needed to be refinished.

b. Prepare floor to receive new markings/stripping and finish, ensure all surfaces are level. (For the basketball courts the red and blue inside the key will be removed completely)

c. Apply the new markings/stripping and finish to both basketball and both racquetball courts. For the basketball coursts markings include both professional and collegiate regulation lines. This will include the running track around both basketball courts (Black lines to reflect 2 running lanes). The curve lines will be amber in color as they cross over the borders of the court. PT distance marking on the running track will be included in court markings.

d. The grey in color rubberized border of the court will be repainted the same color before installing the running lane lines and distance markings.

e. All vents in the basketball and racquetball courts must be covered when applying finishes or other substances that produces fumes.

f. Bleachers must be protected to prevent dust/debris from accumulating.

g. Contractor shall maintain a Safety Plan. All work shall be accomplished in accordance with OSHA and USACE EM 385-1-1 Regulations.

h. Contractor shall coordinate closely with FSS/CES Representative to form a work schedule to minimize time business operations will be closed.

i. Contractor shall repair or replace items damaged during the service to the satisfaction of the Contracting Officer.

j. All debris shall be disposed of properly at an approved off base disposal site location at no additional cost to the government.