FA5240-15-Q-M048_Q A.docx
DOCX document 15 KB Posted
- Solicitation number
- FA5240-15-Q-M048
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Refurbish_Courts_Pictures.pptx | PPTX presentation | |
| FA5240-15-Q-M048 _Amendment_1.pdf | ||
| SOW_for_Court_Refurbishment_final.docx | DOCX document | |
| Combo.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA5240-15-Q-M048 Questions and Answers Q1. Please provide specifications for the finish, paint markings/strippings & rubberized boarder paint.
A1. As of now we do not have specifications on the paint or finish.
Q2. Please provide a color layout of the new markings/strippings and/or blueprint of the total gym area (to included logos and/or special markings).
A2. Color and design will remain exactly the same. We do not have a layout of the gym available.
Q3. What is the electrical watts, is it US standard, and what is the total square footage for the gym it looks like 2 basketball courts.
A3. The electrical watts are 115 – 120 V Standard outlets. The total square footage of the gym is 16,000 sq ft.
Q4. Upon removal of the current markings/stripping to the level needed to be refinished, in the event that the wooden floor is found to be damaged or is damaged during the removal process, does the facility have on hand replacement flooring?
A4. The facility does not have replacement flooring on hand. It will be up to the contractor to replace any damaged flooring.
Q5. Will a lift be provided on site for the covering of overhead vents?
A. Yes, the government will provide a lift.