About this file
This document is a Sole Source (Including Brand Name) Justification for the procurement of the System Communication and Oxygen Tester (SCOT), a self-contained portable testing system used to test life support equipment for the U.S. Air Force.
The justification outlines the statutory authority for sole source procurement, as the SCOT is the only device authorized and compatible with the existing aircraft mask equipment and communication devices. Chemring Energetic Devices is identified as the sole authorized manufacturer of the required equipment. The contracting officer has determined the anticipated cost to the government will be fair and reasonable based on market research and comparison to historical pricing data. No other sources have expressed interest in providing this specialized testing equipment. The Air Force plans to continue using the SCOT and does not foresee any actions to overcome barriers to competition for future acquisitions of this equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOTICE OF INTENT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
CONTROLLED UNCLASSIFIED INFORMATION
March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 6
I. Contracting Activity.
374 CONS
II. Nature and/or description of the action being processed.
Procurement of System Communication and Oxygen Testers (SCOT).
III. Description of supplies/services required to meet agency needs.
The System Communication and Oxygen Tester (SCOT P/N 6112300-1) is a self-contained portable testing system designed to integrate the testing of multiple life support equipment into a single unit capable of testing Life Support equipment for USAF.
IV. Statutory authority permitting other than full and open competition.
This is a justification for sole source procurement of System Communication and Oxygen Tester (SCOT) that is the sole authorized tester for aircraft mask equipment and communication devices in accordance with 14P3-1-161 and 15P3-4-151. Based on FAR 6.302-1 as only one responsible source and no other supplies or services will satisfy agency requirements. 10 U.S.C. 3204(a)(1), Only one responsible source and no other supplies or services will satisfy agency requirements.
The SCOT is the only device in use and required to maintain interoperability and compatibility of our our existing aircraft mask equipment and communication devices. The procurement of additional SCOT will facilitate the demand to conduct additional testing of multiple aircraft masks and communication devices.
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
Chemring Energetic Devices is the sole authorized manufacturer currently used for the MBU-20/P oxygen masks and communication assemblies on the HGU-55P helmets in accordance with Technical Order 14P3-1-161 and Technical Order 15P3-4-151. The Government will procure new System Communication and Oxygen Tester (SCOT) to replace aging SCOT tester on hand.
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
The Government will continue to research SAM.gov and FPDS-NG for approved sources capable of meeting the needs of our customers and the needs of the Air Force mission.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
The Contracting Officer anticipates that the cost to the Government will be fair and reasonable based on comparison of historical data gathered through award data of previous purchases for same or similar services and other available cost or pricing information permits realistic estimates of probable costs of performance. Additionally, the contractor will be requested to provide other than certified cost and pricing data for comparative purposes. Based on this, the Contracting Officer determined that the anticipated cost to the Government can be determined to be fair and reasonable. Due to the nature of the current and future acquisition, consideration to any other vendor solution would result in substantial duplication of cost to the Government that is not expected to be recovered through competition.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 6
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
Market research was conducted by reviewing previous procurement posted on SAM and reviewing previous purchases and by looking through FDPS-NG for the same or similar services.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
None at this time.
X. List of any sources that expressed, in writing, an interest in the acquisition.
N/A
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
N/A
XII. Certification by the Contracting Officer.
As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.
XIII. Certification by the technical/requirements personnel.
As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 5 of 6
Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (10 U.S.C. 3204)
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
(FAR 6.303-2(b)(6))
Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:
Sources Sought Synopsis (used as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. Reference FAR 13.105, Synopsis and Posting Requirements.
Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.
Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.
VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))
Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits.
VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))
Generally, some form of market research should be conducted. Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification.
Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.
When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.
If no market research was conducted, so state and provide the rationale.
IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))
Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available.
X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 6 of 6
If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))
Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired.
Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date, or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this Justification, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.
Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.
If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.
For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a Justification citing the same authority, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 13.501(a)(2)). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.
[DFARS 213.501(a) and DFARS PGI 206.304(a)(S-70)(ii)]
XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))
As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.
XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))
As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.