Statement of Work: FI-MUE Replace Zama DSN-HHD Generator
This is a Statement of Work (SOW) updated November 10, 2026, for the replacement and disposal of a 150 kVA emergency power diesel generator at Building 121, Camp Zama, Japan, issued by the 78th Signal Battalion. The contractor must decommission the existing unserviceable Toyo Denki Seizo TYND-215 generator and install a new 150 kVA / 120 kW diesel generator rated at exactly that capacity with no oversized units acceptable. The new generator must operate at 208/120 VAC, 50 Hz frequency, 3-phase 4-wire configuration, and include a water jacket heater maintaining 40–50°C in standby mode and a radiator fan guard equivalent to or better than the existing arrangement. The contractor shall reuse the existing stainless-steel diesel fuel tank (renewed 2008), associated fuel piping, and electrical wiring where serviceable, with optional height adjustment of tank mounting permitted for compatibility.
The contractor is responsible for all decommissioning, environmental compliance, installation, testing, and handover activities. Work includes asbestos abatement and removal in Building 121, Room 112, where known asbestos-containing materials have been identified through bulk sampling analysis, requiring submission of an ACM Abatement Work Plan with full negative-pressure containment for pricing purposes. The new generator must be compatible with existing or new Automatic Transfer Switches (ATS) in Panel L-M-2 / L-M / P-M, achieve a 40-second response time from start signal to full load acceptance, maintain voltage regulation of ±5% and frequency regulation between 49.5–50.5 Hz (steady-state), and pass a minimum 8-hour load test utilizing site loads of approximately 30–40 kVA supplemented by dummy load as needed. The contractor must provide EPA Tier 3 or Tier 4 certified engines, comply with Japanese national noise standards, and submit three sets of documentation including as-built drawings, operation manuals, full replacement parts catalogs, and warranty documents in English and Japanese within 15 calendar days of completion. A temporary backup generator is required during construction, and facility personnel training on operation and maintenance is mandatory. The contract includes a minimum 1-year warranty covering parts and labor for premature failures, and offerors must demonstrate current Japanese electrician and electrical engineer licenses plus asbestos chief worker certifications prior to award. Power outages must be submitted at least 30 business days in advance, and a detailed construction schedule is required 30 business days before on-site work commences. Asbestos survey and abatement costs shall not be included in base quotes; the Government may add a dedicated Contract Line Item (CLIN) via formal amendment if removal is deemed necessary.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA520926Q00770003 SF 30.pdf | ||
| Solicitation Amendment FA520926Q00770002 SF 30.pdf | ||
| SOW Amdnment 02.docx | DOCX document | |
| Ans to KTR Questions.docx | DOCX document | |
| Solicitation Amendment - FA520926Q00770001.pdf | ||
| Solicitation Amendment FA520926Q00770001 SF 30.pdf | ||
| SOW 24 Aug Clear Copy.pdf | ||
| Solicitation - FA520926Q0077.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FI-MUE Replace Zama DSN-HHD Generator – Updated SOW
78th Signal Battalion – Camp Zama, Japan | Page 1 of 14
STATEMENT OF WORK (SOW)
FI-MUE Replace Zama DSN-HHD Generator
78th Signal Battalion Camp Zama, Japan
Updated: 10 November 2026 (Incorporates responses to Contractor Questions / Clarifications)
1. INTRODUCTION
This Statement of Work (SOW) defines the requirements, scope, responsibilities, and deliverables for the replacement and disposal of the 150 kVA emergency power diesel generator located on Camp Zama, Japan, Building 121.
This updated SOW incorporates clarifications provided in response to Contractor (KTR) questions.
Where a conflict exists between this document and prior drafts, this updated version governs. The more stringent of applicable U.S. or Japanese requirements shall apply.
2. SCOPE OF WORK
The contractor shall provide all necessary materials, equipment, labor, and services to:
2.1. Decommissioning and Removal of Existing Generator
• Disconnection from the electrical distribution system.
• Safe removal of residual fuel and proper disposal in accordance with environmental regulations.
• Safe removal of coolant and oil and proper disposal in accordance with environmental regulations.
• Disassembly and transport of the existing generator from the site (Bldg. 121, Camp Zama) to an authorized disposal facility. "Authorized waste disposal facilities" means facilities licensed under Japanese laws and regulations.
• Removal and disposal of old conduits and exhaust piping that cannot be re-used for the new generator system.
• The existing stainless-steel diesel fuel tank (renewed 2008 and confirmed serviceable), associated fuel piping, and electrical wiring shall be retained if they remain in a serviceable condition after contractor inspection, testing, and certification. Section 4.1 intent is to remove the generator unit itself while retaining serviceable tank, piping, and wiring.
2.1.1. Asbestos Abatement and Removal in Building 121, Room 112
The contractor shall utilize the bulk asbestos sample summary and laboratory analytical results for the following materials located in Building 121, Room 112. These have been identified as Asbestos- Containing Material (ACM) and require abatement and removal.
• Silver wrapped pipe insulation: Samples 162-01A and 162-02A from Room 112 contained 95% Chrysotile asbestos.
• Silver wrapped duct insulation: Sample 162-03A from Room 112 contained 50% Chrysotile asbestos.
---13
78th Signal Battalion – Camp Zama, Japan | Page 2 of 14
• Gray flange gasket: Sample 300830.162-01 from Room 112 contained 7% Chrysotile asbestos.
• White flange gasket over metal casing: Sample 300830.162-02 from Room 112 contained 50% Chrysotile asbestos.
• White flange gasket: Samples 300830.162-03 and 300830.162-04 from Room 112 contained 50% Chrysotile asbestos.
o Note: Sample 300830.162-05, a black gasket from Room 112, was identified as Non-Detect (ND) for asbestos and is therefore not considered ACM.
The contractor shall submit an Asbestos-Containing Material (ACM) Abatement Work Plan for the work specified in paragraph 2.1.1.
The ACM Abatement Work Plan shall address and demonstrate compliance with all applicable requirements of the following:
a. Japan Environmental Governing Standards (JEGS), 2024, Chapter 5, Asbestos;
b. 29 CFR 1926.1101, Asbestos, and 29 CFR 1926.103, Respiratory Protection, to the extent incorporated into this Contract;
c. EM 385-1-1, Safety and Health Requirements Manual, current contract-applicable edition;
d. Industrial Safety and Health Act (Roudou Anzen Eisei Hou);
e. Ordinance on Prevention of Health Impairment due to Asbestos (Ishiwata Shougai Yobou Kisoku), Ministry of Health, Labour and Welfare Ordinance No. 21 of 2005, as amended;
f. Air Pollution Control Act (Taiki Osen Boushi Hou);
g. Waste Management and Public Cleansing Act (Haikibutsu no Shori oyobi Seisou ni Kansuru Houritsu), as amended; and
h. All applicable prefectural, municipal, installation, permit, notification, licensing, transportation, and disposal requirements related to asbestos abatement and asbestos-containing waste.
The Contractor shall submit two hard copies of the ACM Abatement Work Plan to the Government Representative (GR) for technical review not less than [10] calendar days prior to commencing any asbestos-related work or disturbing ACM. The Contractor shall not commence asbestos-related work until the plan has been accepted in writing by the Contracting Officer or designated Government official.
The ACM Abatement Work Plan shall include, at a minimum, the following:
a. Description of Work, including the location, type, condition, and estimated quantity of ACM to be disturbed or removed;
b. Applicable codes, permits, notifications, standards, and installation requirements;
c. Regulated work area and abatement area, including containment, access control, warning signs, and decontamination facilities;
d. ACM removal and abatement procedures, including work sequence, wet methods, cleanup procedures, and measures to prevent asbestos fiber release;
e. Personnel training requirements, respiratory protection, and personal protective equipment;
f. Materials and equipment for abatement, including containment materials, HEPA vacuums, negative-air equipment when required, and waste containers;
g. Air monitoring and sampling plan, including sampling locations, frequency, analysis, reporting, and corrective actions;
78th Signal Battalion – Camp Zama, Japan | Page 3 of 14
h. Waste handling and disposal procedures, including packaging, labeling, storage, transportation, manifests, and disposal documentation; and
i. Emergency, unexpected discovery, and stop-work procedures.
j. Plan Preparer. Provide the name, title, qualifications, and applicable training certificates of the person who prepared the ACM Abatement Work Plan.
Government review or acceptance of the plan does not relieve the Contractor of responsibility for complying with all applicable legal, environmental, safety, health, and contractual requirements.
2.1.1.1. Basis of Bid – ACM Abatement Containment
The attached asbestos survey identifies known asbestos-containing material (ACM) in Building 121, Room 112. This survey is not a detailed abatement design and does not establish final removal quantities, material condition, or exact work limits.
For pricing and schedule purposes, offerors shall assume that removal of known ACM in Building 121, Room 112, will be performed under full negative-pressure containment. The price shall include all work necessary for full negative-pressure containment, as applicable, including:
• Regulated area controls
• Warning signs
• HVAC isolation or protection
• Critical barriers
• Floor and surface protection
• HEPA-filtered negative-air equipment
• Wet methods
• Worker decontamination
• HEPA vacuum cleaning
• Air monitoring
• Waste packaging
• Transportation
• Final disposal
• Required manifests and disposal documentation
After award, the Contractor may propose a localized alternative method, such as glove-bag containment or a negative-pressure mini-enclosure, in the ACM Abatement Work Plan. The Contractor must demonstrate that the alternative method provides equal or greater safety and containment performance and prevents asbestos fiber release outside the regulated area. The Contractor shall not use an alternative method until the ACM Abatement Work Plan is accepted in writing by the Contracting Officer or designated Government official. An accepted alternative method shall not result in an increase in Contract price or an extension of the Contract completion date. If an alternative method cannot be safely used due to site conditions, ACM condition, quantity, accessibility, or work
78th Signal Battalion – Camp Zama, Japan | Page 4 of 14 configuration, the Contractor shall use full negative-pressure containment at no additional cost to the Government
2.2. Disposal and Environmental Compliance
• Disposal of the generator, engine, batteries, coolant, and oils shall be completed by the contractor utilizing off-base locations.
• Proper handling and disposal of hazardous materials, including oil, fuel, and battery components.
• Contractor shall provide a copy of the receipt of disposal of any hazardous waste to the Government Representative (GR). In Japan, an industrial waste management manifest is used for industrial waste; submission of a copy of this manifest is acceptable documentation.
• The contractor shall comply with all U.S. Government and Japanese environmental laws (whichever are most stringent) to protect the health and safety of employees/residents and preserve the local and global environment. The contractor shall comply with the Japan Environmental Governing Standards (JEGS) and shall minimize or eliminate environmental pollution and energy/utility waste.
2.3. Installation of New Generator
• Site preparation, including foundation modifications if required. Validity of the anchoring method may be demonstrated by seismic calculations based on Japanese seismic standards. Once the seismic evaluation determines the most suitable anchoring method, foundation modifications (if required) are part of site preparation.
• Delivery and offloading of the new generator.
• Installation and secure anchoring of the generator unit. A radiator fan guard is required on the new generator set. The contractor shall provide a safe installation complying with applicable Japanese and U.S. safety standards. OEM guarding equivalent to or better than the existing protective arrangement is expected.
• Electrical integration with the existing power panel and/or new Automatic Transfer Switch (ATS).
Contractors are permitted to reuse existing wires and conduits from Panel L-M-2 (also referenced as L-M and P-M in related drawings) to the generator provided they reach without the need for splicing. Splicing of wires is not permitted. If existing wire does not reach, the contractor shall supply new wires from the connection point in the panel to the new generator output breaker.
• Connection and modification of the exhaust system. The contractor may reuse existing exhaust piping to avoid new holes and core drilling of the outside wall.
• The contractor shall utilize all existing air intake ducts, both internal and external, for compatibility.
The contractor is encouraged and permitted to re-use the existing fuel piping and radiator exhaust ducting, provided that they are thoroughly inspected, tested, and certified by the contractor to be in fully functional, safe, and leak-free condition prior to integration with the new generator system.
• The existing Stainless Steel Diesel Tank, renewed in 2008 and confirmed to be serviceable, shall be utilized by the contractor. Technical drawings for this tank are available upon request from the COR/GR. If required for compatibility, the installation height of the existing fuel tank may be modified (by modifying the existing mounting stand or adding a new one), provided the tank remains serviceable and all connections are inspected, tested, and certified leak-free and safe.
78th Signal Battalion – Camp Zama, Japan | Page 5 of 14
• A temporary/backup generator shall be installed and operational during the construction period while the existing generator is removed and the new unit is not yet commissioned, to maintain emergency power capability for Building 121.
2.4. Testing and Commissioning
• Verification of electrical connections and power output.
• Contractor shall conduct a minimum 8-hour load test utilizing site loads as part of the post-installation test and commissioning plan. Site load is approximately 30–40 kVA. The generator shall be rated 150 kVA / 120 kW so that it can operate near the intended load range; oversized units are not acceptable. Contractor may supplement site loads with a dummy/resistive load bank as necessary to achieve meaningful loading and demonstrate performance. Fuel from the existing stainless-steel diesel tank may be used for the test.
• Contractor shall provide a draft post-installation test and commissioning plan to the GR no later than 30 days prior to final acceptance of the new generator system. This test plan will need to be reviewed and approved by the GR prior to being implemented for acceptance. The test plan shall address both steady-state operating tolerances and transient performance during load application or motor starting.
2.5. Handover and Documentation
• Training for facility personnel on new generator operation and maintenance.
• The contractor shall submit three (3) sets of work performance and test result reports, as-built drawings, operation manuals, and warranty documents in both English and Japanese, to the GR (78th Signal Battalion/DPW) within 15 calendar days after the work completion date. Such reports shall be submitted in booklet-type and digital forms with catalog cuts/manufacturer drawings of replacement parts.
• When using U.S.-made parts or products for which documentation is available only in English, submission of a Japanese version may be omitted for those specific items.
• A parts list alone is not acceptable in place of the full replacement parts catalog or manufacturer’s drawings. Both the full replacement parts catalog/manufacturer drawings are required to ensure future maintainability.
3. TECHNICAL SPECIFICATIONS
3.1. Existing Generator Details (To Be Disposed of)
• Capacity: 150 kVA / 120 kW
• Voltage Output: 208/120 VAC
• Make/Model: Toyo Denki Seizo / TYND-215
• Fuel Type: Diesel
• Frequency: 50 Hz
• Current Status: Unserviceable and Obsolete, to be decommissioned
3.2. New Generator Specifications
78th Signal Battalion – Camp Zama, Japan | Page 6 of 14
• Capacity: 150 kVA / 120 kW (exact rating required; oversized units are not acceptable)
• Voltage Output: 208/120 VAC
• Frequency: 50 Hz
• Fuel Type: Diesel
• Wiring: 3 Phase, 4 Wire Plus 1 Ground
• The new diesel generator shall be fully compatible and connected to the new or existing ATS inside Building 121, Camp Zama. The Contractor is responsible for conducting pre-proposal survey(s) prior to quote submission to confirm compatibility of the proposed generator with the new or existing ATS. (Note: The previously advertised site visit has passed; no further site surveys will be arranged for prospective offerors.)
• New generator/engine shall come equipped with a water jacket heater to ensure the diesel engine is maintained at a temperature of 40–50 °C while in standby mode. To ensure reliable starting performance during Japan’s colder winter months in the Kanagawa area, the technical specifications sheet for the quote must outline heater sizing and output: a thermostatically controlled immersion or tank-style block heater (typically 1,000 W to 1,500 W) calibrated to sustain an engine coolant temperature profile of 40 °C to 50 °C in standby. Use of 40–50 °C as the standard setting is acceptable provided the installed heater actually maintains that range.
• New generator system shall have an output breaker local to the generator to ensure proper isolation for maintenance.
• New generator shall have Phase-to-phase and Phase-to-neutral power, voltage, and amperage indication gauges/meters affixed to the generator for operational trending. A standard three-phase four-wire (3φ4W) configuration displaying line-to-line voltage (R-S, S-T, T-R), phase voltage (R-N, S-N, T-N), current (R, S, T, N), and power is acceptable.
• New generator shall automatically adjust frequency based on load demands to maintain a tight operational tolerance between 49.5 – 50.5 Hz.
• New generator shall automatically adjust AVR based on load demands to maintain a tight operational tolerance of ±5 % of nameplate per ANSI C84.1 (198 V to 218 V and 114 V to 126 V).
These bands are operating (steady-state) tolerances after the unit is online. Transient response during load application or motor starting is not separately specified beyond the requirement to start, reach rated voltage and frequency, and accept the full emergency load through the ATS within 40 seconds of a start signal. Address transient performance in the approved test plan.
• Japanese domestic standards (JIS, JEM, JEC, NEGA) may be used in addition to, not in place of, the stated performance requirements. The generator must still meet the SOW voltage/frequency bands, ATS compatibility, emissions, and other stated requirements. If Japanese standards are used, demonstrate equivalent or better performance.
• Environmental Compliance / Emissions: The emergency generator is exempt from Japanese emission limits and monitoring requirements under JEGS 2024 Chapter 4, Paragraph 4.8.4 (stationary backup/emergency power equipment). However, new stationary emergency diesel engines must still meet applicable U.S. EPA certification standards as outlined in JEGS 2024 Chapter 4, Table 4.11. Providing an EPA Tier 3 or Tier 4 certified engine (depending on engine specifications and manufacture year) is required.
78th Signal Battalion – Camp Zama, Japan | Page 7 of 14
• Noise: While Camp Zama may fall outside local municipal zoning maps, the project must comply with Japanese national noise standards as mandated by SOW Sections 5.2 and 10.1. The JEGS does not regulate ambient noise limits or specify site-boundary distances.
• Warranty: This contract shall include a minimum 1-year warranty provided either by the contractor or Original Equipment Manufacturer (OEM) that covers any repairs or replacement of premature failures of the system or its subcomponents under normal operations (parts and labor). Normal consumables and scheduled wear items are outside warranty unless they fail prematurely.
3.3. Existing Automatic Transfer Switches (ATS)
Building 121 contains two (2) existing Automatic Transfer Switches (ATS) for the emergency power system. These units are documented in the site survey files labeled “ATS and Generator” and “A.C Switch Board (ATS)” photographs. The contractor shall ensure the new generator is fully compatible with these existing or new ATS units. The contractor is directed to utilize the new or existing ATS wiring and configuration to the maximum extent possible to minimize project costs and timelines.
Panel identifiers appearing in this SOW and related drawings (L-M-2, L-M, and P-M) refer to the same or related switchboard locations. Additional information about existing ATS specifications, electrical/as-built drawings, and tank drawings is available from the Contracting Officer’s Representative (COR) / Government Representative (GR).
3.4. Existing Diesel Fuel Tank
The existing Stainless Steel Diesel Tank, renewed in 2008, is serviceable and shall be utilized for the new generator system. Technical drawings for this tank are available for contractor reference from the COR/GR. The contractor shall ensure compatibility and proper connection of the new generator to this existing fuel tank. Fuel connections are intended to be retained. Height adjustment of the tank mounting (by modifying the existing stand or adding a new one) is acceptable if required for generator compatibility, subject to inspection, testing, and certification of all connections as leak-free and safe.
4. DISPOSAL OF THE EXISTING OLD GENERATOR
The contractor shall be responsible for the disposal of the existing generator and waste utilizing off-base resources. The U.S. Government / DoD will not be responsible for nor assist with the disposal of waste generated from the replacement of the diesel generator.
4.1. Removal
The contractor shall remove the existing old generator from the site. The stainless-steel diesel tank (renewed 2008), fuel piping, and electrical wiring shall be retained if serviceable after inspection, testing, and certification. The intent is to remove the generator unit itself while keeping serviceable associated systems in place.
4.2. Disconnection
The contractor shall disconnect the existing old generator from the electrical systems and any other systems, including the ATS (Automatic Transfer Switch).
4.3. Drainage
78th Signal Battalion – Camp Zama, Japan | Page 8 of 14
The contractor shall drain and dispose of any remaining fuel, oil, and fluids in an environmentally responsible manner utilizing resources off-base.
4.4. Demolition / Disposal
The contractor shall demolish/dispose of the old generator and all materials, including metal, plastic, and other components, in accordance with Japanese regulations and laws at licensed facilities.
4.5. Documentation
The contractor shall provide documentation, including receipts, certificates of disposal, and photos, to confirm the disposal of the existing old generator. Acceptable documentation includes:
• Receipt from a licensed waste disposal facility
• Industrial waste management manifest (Japanese standard form)
• Certificate of disposal from the Japanese Ministry of the Environment (if applicable)
• Photos of the disposal process, including the removal of the generator and disposal of materials
5. ACQUISITION OF THE NEW 150 KVA DIESEL GENERATOR
The contractor shall supply and deliver a new 150 kVA diesel generator that meets the following specifications:
• Power rating: 150 kVA / 120 kW
• Voltage: 208/120 VAC
• Frequency: 50 Hz
• Fuel type: Diesel
5.1. Automatic Transfer Switch (ATS)
The new generator must be compatible with the new or existing ATS unit inside of Panel P-M / L-M (see as-built drawings available from COR/GR).
5.2. Compliance with Japanese and U.S. Regulations
The generator shall comply with all relevant Japanese regulations and laws, including those related to emissions (as clarified under Section 3.2 – EPA Tier compliance required even though emergency units are exempt from certain Japanese emission monitoring), noise, and safety. Japanese national noise standards apply.
6. INSTALLATION OF THE NEW DIESEL GENERATOR
The contractor shall install the new generator, including all necessary electrical connections, testing, and commissioning, in accordance with the following requirements:
6.1. Electrical connections
The contractor shall connect the new generator to the existing electrical system and ATS located in Panel L-M / L-M-2 / P-M. Contractors are permitted to reuse the existing electrical wires from the panel to the new generator provided they are not damaged and the wire connections reach without splicing. If
78th Signal Battalion – Camp Zama, Japan | Page 9 of 14 the existing wire does not reach, the contractor shall supply new wires from the connection point in the panel to the new generator output breaker.
6.2. Mechanical connections
The contractor is encouraged and permitted to reuse the existing fuel line pipes, exhaust piping, and radiator exhaust ducts to minimize disruption to the building, subject to inspection, testing, and certification as fully functional, safe, and leak-free.
6.3. Testing
The contractor shall perform thorough testing of the new generator, including the minimum 8-hour load test utilizing site loads (approximately 30–40 kVA), supplemented by dummy load as needed, to ensure that it meets the performance requirements outlined in this SOW.
6.4. Commissioning
The contractor shall commission the new generator, including the ATS, to ensure that it is fully functional and meets the performance requirements outlined in this SOW.
6.5. Documentation
The contractor shall provide documentation, including testing and commissioning reports, to confirm that the new generator is fully functional and meets the performance requirements outlined in this
SOW.
6.6. Power Outages
The contractor is required to submit any power outages for the installation at least 30 business days in advance so that tenants of the building have time to plan for the disruption. Power outages will be submitted via email to the POCs listed in this SOW.
6.7. Temporary Power
Because the existing backup generator is non-functional and will be removed, a temporary/backup generator shall be installed and remain available during the construction period until the new generator is fully commissioned and accepted.
7. PERFORMANCE REQUIREMENTS
The new generator shall meet the following performance requirements:
7.1. Power supply
The generator shall provide a stable and reliable power supply.
7.2. Voltage and Frequency Regulation
The generator shall maintain voltage regulation of ±5 % and frequency regulation between 49.5 – 50.5 Hz (steady-state, after the unit is online). The generator shall automatically adjust for variable loads without user intervention.
78th Signal Battalion – Camp Zama, Japan | Page 10 of 14
7.3. Response Time
System Response and Startup Time: The new generator system shall be designed, configured, and tested to automatically start, reach rated voltage and frequency, and accept the full emergency load through the Automatic Transfer Switch (ATS) within 40 seconds of receiving the start signal upon loss of utility power.
7.4. Automatic Transfer
The new generator shall be compatible with the new or existing transfer switch inside Panel L-M / L-M-2 / P-M. The contractor is responsible for confirming generator compatibility with the existing ATS prior to submitting a proposal during the solicitation period. (Further site surveys beyond the previously advertised visit will not be arranged.)
8. WARRANTY AND MAINTENANCE
The contractor shall provide a minimum of 1-year warranty for the new generator, including parts and labor, covering repairs or replacement of premature failures of the system or its subcomponents under normal operations. Normal consumables and scheduled wear items associated with normal use are not covered under warranty unless they fail prematurely.
8.1. On-Demand Repair and Replacement
The contractor shall repair or replace any faulty or damaged parts covered under warranty as needed.
8.2. Technical Support and Troubleshooting
The contractor shall provide technical support and troubleshooting to ensure that the generator is fully functional and meets the performance requirements outlined in this SOW.
Example warranty documentation: Warranty certificate; contact information for warranty support; repair and replacement reports.
9. DELIVERABLES
The contractor shall provide the following deliverables:
9.1. New 150 kVA Diesel Generator
The contractor shall deliver a new 150 kVA diesel generator that meets the specifications outlined in this SOW.
9.2. Installation and Testing
The contractor shall install and test the new generator, including all necessary electrical connections and testing (including the 8-hour load test).
9.3. Documentation
The contractor shall provide documentation, including testing and commissioning reports, as-built drawings, operation manuals, full replacement parts catalog/manufacturer drawings, and warranty documents, to confirm that the new generator is fully functional and meets the performance
78th Signal Battalion – Camp Zama, Japan | Page 11 of 14 requirements outlined in this SOW. English-only documentation is acceptable for U.S.-made parts when Japanese versions are unavailable.
9.4. Training
The contractor shall provide training to 78th Signal and DoD personnel on the operation and maintenance of the new generator.
9.5. Warranty and Maintenance Support
The contractor shall provide warranty and maintenance support, including parts and labor, for a minimum of 1 year (consistent with Sections 3.2 and 8).
9.6. Construction Schedule
The contractor shall submit a detailed construction and installation schedule to the GR at least thirty
(30) business days prior to the scheduled commencement of any on-site work, to allow sufficient time for affected tenants to coordinate and prepare for potential service disruptions. Offerors are advised that high production volume at certain generator factories may result in on-site delivery around April 2028 (manufacturing starts late February to March 2028, approximately 560 days lead time).
Contractors shall propose realistic schedules reflecting actual production capacity.
10. CONTRACTOR RESPONSIBILITIES
The contractor shall be responsible for:
10.1. Ensuring Compliance with Japanese and U.S. Regulations
The contractor shall ensure that the new generator and all work performed comply with all relevant Japanese regulations and laws, as well as applicable U.S. criteria. Where a conflict exists, the more stringent applicable U.S. or Japanese requirement applies. Section 13 references are governing contract criteria, not merely informational.
10.2. Providing a Safe Working Environment
The contractor shall provide a safe working environment for all personnel, including NEC personnel.
10.3. Maintaining Confidentiality and Security
The contractor shall maintain confidentiality and security of all 78th Signal information and assets.
10.4. Contractor Personnel Qualifications
The contractor or their sub-contractors shall ensure their employees have the following current and valid professional certifications to provide the required services under this contract. The contractor shall be responsible for ensuring their employees have these qualifications for the entire life of this contract.
A copy of the certificates or permits must be submitted prior to contract award:
• 2nd Class Electrician License (第二種電気工事士)
• 3rd Class Chief Electrical Engineer License (第三種電気主任技術者)
78th Signal Battalion – Camp Zama, Japan | Page 12 of 14
• Specialized Electrical Construction Qualification for Emergency Backup Generator Construction (特殊電気工事資格:非常用予備発電装置工事)
• Asbestos Chief Worker (石綿作業主任者) quotation. The Government is arranging asbestos testing and inspection separately under an independent contract. If asbestos removal is deemed necessary based on the Government’s independent testing, the Government plans to add a dedicated Contract Line Item (CLIN) via formal Amendment prior to award.
11. POINT OF CONTACTS
The points of contact for this project are:
• Derrick L. Lewis – Electronics Maintenance Supervisor – DSN: 315-262-3290
• Shaun S. Campbell – Logistics Manager – shaun.campbell5.civ@army.mil – DSN: 315-262-3272
Additional drawings, ATS specifications, and tank drawings referenced in this SOW may be obtained from the COR / GR.
12. ACCEPTANCE CRITERIA
The 78th Signal Battalion shall accept the new generator based on the following criteria:
• Compliance with specifications: The new generator shall meet the specifications outlined in this SOW (including exact 150 kVA / 120 kW rating, voltage, frequency, heater performance, metering, fan guard, and EPA Tier emissions compliance).
• Performance requirements: The new generator shall meet the performance requirements outlined in this SOW (voltage/frequency regulation, 40-second response time, ATS compatibility).
• Installation and testing: The new generator shall be properly installed and tested, including all necessary electrical connections, the minimum 8-hour load test, and temporary power continuity during construction.
• Documentation: The contractor shall provide documentation, including testing and commissioning reports, disposal manifests/receipts, as-built drawings, full parts catalogs, and warranty documents.
• Training completed for designated personnel.
• All environmental and safety requirements satisfied, including licensed disposal and required certifications.
13. REFERENCES
The documents listed below are governing safety, environmental, electrical, fuel, and emergency-power criteria for this contract. They are not merely for reference. Where a conflict exists, the more stringent applicable U.S. or Japanese requirement applies.
Document Number Document Title Engineering Manual 385-1-1 Safety and Health Requirements AR 385-10 The Army Safety Program
10.5. - Asbe------------stos ---Offerors shal------------------------l not incl--ude bulk sa-----------------------mpling, su-r--vey fees-----------------, or as -be--s-tos abat------------------ement c---os- ts in thei------------------r base
78th Signal Battalion – Camp Zama, Japan | Page 13 of 14
AR 200-1 Environmental Protection and Enhancement AR 385-40 Accident Reporting and Records 29 CFR Part 1926 OSHA Standards for Construction OMA 214 Standard Technical Specifications for OMA Projects Korea TIA-607-C Generic Telecommunications Bonding and Grounding (Earthing) TM 5-692 Maintenance of Mechanical and Electrical Equipment at C4ISR Facilities NETCOM Reg 420-1 Site Power Coordinator Program UFC 3-540-01 Engine-Driven Generator Systems for Prime and Standby Power UFC 3-560-01 Safety / Operations / Management UFC 3-600-01 Fire Protection Criteria UFC 3-501-01 Electrical General Requirements UFC 3-580-01 Telecommunications Interior Infrastructure Planning & Design UFC 3-460-01 Petroleum Fuel Facilities NFPA 1 Fire Code NFPA 30 Flammable and Combustible Liquids Code NFPA 37 Installation and Use of Stationary Combustion Engines and Gas Turbines NFPA 70 National Electrical Code NFPA 70E Electrical Safety in the Workplace NFPA 110 Emergency and Standby Power Systems
JEGS 2024 Japan Environmental Governing Standards (esp. Ch. 4 emissions & emergency generators)
14. ATTACHMENTS AND DOCUMENTATION
The drawings attached to or referenced by this SOW represent only a portion of the site layout. The contractor may request additional relevant drawings, schematics, or technical data (including ATS specifications, electrical/as-built drawings, and tank drawings for L-M-2 / L-M / P-M) through the designated Point of Contact (POC), COR, or GR during the solicitation and planning phases.
The asbestos results and location in Building 121 Room 112 (Generator) room are attached to this SOW below as references.
15. SUMMARY OF KEY CLARIFICATIONS FROM CONTRACTOR QUESTIONS
The following summarizes major clarifications incorporated into this updated SOW:
• Authorized disposal facilities = those licensed under Japanese law; industrial waste management manifest is acceptable documentation.
• Seismic calculations per Japanese standards are acceptable to validate anchoring methods.
• Existing 2008 stainless-steel diesel tank and serviceable fuel piping/wiring shall be retained and reused (after inspection/certification). Height adjustment of tank mounting is permitted if needed for compatibility.
• 8-hour load test utilizing site loads (~30–40 kVA) is required; generator must be 150 kVA / 120 kW (no oversized units). Fuel from existing tank may be used. Dummy load may supplement as needed.
• English-only documentation acceptable for U.S.-made parts; full manufacturer catalogs/drawings required (parts list alone insufficient).
78th Signal Battalion – Camp Zama, Japan | Page 14 of 14
• Water jacket heater: thermostatically controlled (typically 1,000–1,500 W) maintaining 40–50 °C in standby.
• Steady-state voltage/frequency bands apply after online; transients addressed in test plan.
Japanese standards (JIS/JEM/JEC/NEGA) may supplement but not replace SOW performance requirements.
• Emergency generators are exempt from certain Japanese emission limits under JEGS, but must meet applicable U.S. EPA Tier 3 or Tier 4 certification.
• Japanese national noise standards apply.
• Temporary/backup generator required during construction period.
• Radiator fan guard required on new unit (OEM equivalent or better).
• Warranty standardized to minimum 1 year (parts & labor) for premature failures;
consumables/scheduled wear excluded unless premature failure.
• Asbestos survey and abatement costs shall not be included in base quotes; Government will handle separately and may add CLIN if needed.
• No additional pre-quotation site surveys will be arranged.
• Long-lead manufacturing/delivery timelines (approx. 560 days / delivery ~April 2028) are acknowledged; realistic schedules required.
• Section 13 references are governing criteria; more stringent U.S. or Japanese requirement applies in case of conflict.
— End of Updated Statement of Work —
Contract Management Branch Directorate of Public Works U.S. Army Garrison Japan
SUBJECT: BULK ASBESTOS SAMPLING
BUILDING 121, CAMP ZAMA, JAPAN
On October 20 and 28, 2026, fifteen bulk samples were collected for asbestos analysis in general accordance with EPA 40 CFR 763, Subpart E (Asbestos Containing Materials in Schools). Samples were submitted to EFA Laboratories in Chiyoda City, Tokyo, Japan, a facility accredited under the National Voluntary Laboratory Accreditation Program (NVLAP). Laboratory analysis was performed in accordance with EPA 40 CFR 763, Appendix E to Subpart E (Interim Method of the Determination of Asbestos in Bulk Insulation Samples) and EPA 600/R-93-116 (Method for Determination of Asbestos in Bulk Building Materials).
Based on the laboratory analytical results, asbestos was identified in nine of the 15 samples.
Asbestos-containing material (ACM) determination was based on the US Army Corps of Engineers, Japan District, May 2026 Japan Edited Specifications (JES), which states, If PLM does not detect the presence of asbestos (e.g. “non-detect”), the material shall be considered <0.1% asbestos. If PLM analysis detects asbestos in any discernible amount (to include “trace” or “less than 1%”), the material shall be considered >0.1% asbestos unless proven to be non- ACM by the use of quantification methods capable of achieving an analytical sensitivity of less than 0.1%, such as Transmission Electron Microscopy (TEM) or 1000 point counting. No samples were point counted for this report. ACM is defined as any material containing more than one tenth of one percent (0.1%) asbestos. The laboratory analytical results are summarized in Table 1 below.
TABLE 1
Bulk Asbestos Sample Summary
Sample Number Sample Description/Location PLM
Analysis1
1,000 Pt Count
Analysis1
ACM
(>0.1%)
162-01A Silver wrapped pipe insulation / Room 112 95%C NA Yes
162-02A Silver wrapped pipe insulation / Room 112 95%C NA Yes
162-03A Silver wrapped duct insulation / Room 112 50%C NA Yes
162-04A Floor concrete / Room 110 ND NA No
162-05A Floor concrete / Room 110 ND NA No
162-06A Floor concrete / Room 110 5%C NA Yes
162-07A Floor concrete / Room 110 ND NA No
162-08A Floor concrete / Room 110 5%C NA Yes
162-09A Floor concrete / Room 110 ND NA No
162-10A Floor concrete / Room 110 ND NA No
300830.162-01 Gray flange gasket / Room 112 7%C NA Yes
2 EQI Job No. 300830.162
300830.162-02 White flange gasket over metal casing / Room 112 50%C NA Yes 300830.162-03 White flange gasket / Room 112 50%C NA Yes 300830.162-04 White flange gasket / Room 112 50%C NA Yes 300830.162-05 Black gasket / Room 112 ND NA No
1. ND=None Detected; NA=Not Analyzed; C=Chrysotile; A=Amosite; Cr=Crocidolite; An=Anthophyllite; T=Tremolite; Ac=Actinolite
Any questions regarding our work and this report, the presentation of the information, and the interpretation of the data are welcome and should be referred to the undersigned. EnviroQuest greatly appreciates this opportunity to assist you with your industrial hygiene needs. We look forward to working with you again in the future.
Attachments
1. Laboratory Analytical Report
2. Sample Location Diagram
3. Project Photographs
3 EQI Job No. 300830.162
LABORATORY ANALYTICAL REPORT
ISO/IEC 17025 NVLAP Accredited
NVLAP Code 600305-0
Bulk Asbestos Analytical Report
BPA CALL 162 BUILDING 121 , CAMP ZAMA
(Modified EPA Method 600/R-93/116)
Composite Values of Asbestos Components:
Notes: Limit of Detection is less than 0.1%. 'ND' = Not Detected (less than 0.1%). ‘Trace’ = Trace amounts (exceeds
0.1% and less than 1%).
Tremolite* = Tremolite asbestos; Actinolite* = Actinolite asbestos; Anthophyllite* = Anthophyllite asbestos.
Asbestos (90%)
(Modified EPA Method 600/R-93-116)
Bulk Asbestos Analysis
Report Number:
Date Received: 10/22/2026
10/27/2026
Job Name: BPA CALL 162 BUILDING 121 , CAMP ZAMA
Date Analyzed:
Date Reported:
10/27/2026
Sample ID Sample Name Lab Number
162-01A 20055590
<Layer Details>
Layer
Number
Percent of Layer Layer appearance
Asbestos Type Range & VAE
(Back side/interior side)
1 95% Off-White Woven Material Chrysotile 95%
2 5% Silver Foil ND
Collected on 10/20/2026Method of Preparation: Tease, Crush
Non-Asbestos Fibers:
(Surface side)
Notes: Limit of Detection is less than 0.1%. 'ND' = Not Detected (less than 0.1%). ‘Trace’ = Trace amounts (exceeds
0.1% and less than 1%).
Tremolite* = Tremolite asbestos; Actinolite* = Actinolite asbestos; Anthophyllite* = Anthophyllite asbestos.
Asbestos (90%)
(Modified EPA Method 600/R-93-116)
Bulk Asbestos Analysis
Report Number: B212874 -v1
Date Received: 10/22/2026
10/27/2026
Job Name: BPA CALL 162 BUILDING 121 , CAMP ZAMA
Date Analyzed:
Date Reported:
10/27/2026
Sample ID Sample Name Lab Number
162-02A 20055591
<Layer Details>
Layer
Number
Percent of Layer Layer appearance
Asbestos Type Range & VAE
(Back side/interior side)
1 95% Off-White Woven Material Chrysotile 95%
2 5% Silver Foil ND
Collected on 10/20/2026Method of Preparation: Tease, Crush
Notes: Limit of Detection is less than 0.1%. 'ND' = Not Detected (less than 0.1%). ‘Trace’ = Trace amounts (exceeds
0.1% and less than 1%).
Tremolite* = Tremolite asbestos; Actinolite* = Actinolite asbestos; Anthophyllite* = Anthophyllite asbestos.
Asbestos (ND)
(Modified EPA Method 600/R-93-116)
Bulk Asbestos Analysis
Date Received: 10/22/2026
Date Reported: 10/27/2026
QC Analyst:
Job Name: BPA CALL 162 BUILDING 121 , CAMP ZAMA
Date Analyzed:
Analyst:
10/27/2026
Sample ID Sample Name Lab Number
162-04A 20055592
<Layer Details>
Layer
Number
Percent of Layer Layer appearance
Asbestos Type Range & VAE
(Back side/interior side)
1 98% Grey Cement Material w/Aggr ND
2 2% Grey Non-Fibrous Material ND
Collected on 10/20/2026Method of Preparation: Crush
Notes: Limit of Detection is less than 0.1%. 'ND' = Not Detected (less than 0.1%). ‘Trace’ = Trace amounts (exceeds
0.1% and less than 1%).
Tremolite* = Tremolite asbestos; Actinolite* = Actinolite asbestos; Anthophyllite* = Anthophyllite asbestos.
Asbestos (ND)
(Modified EPA Method 600/R-93-116)
Bulk Asbestos Analysis
Report Number: B212874 -v1
Date Received: 10/22/2026
10/27/2026
Job Name: BPA CALL 162 BUILDING 121 , CAMP ZAMA
Date Analyzed:
Date Reported:
10/27/2026
Sample ID Sample Name Lab Number
162-05A 20055593
<Layer Details>
Layer
Number
Percent of Layer Layer appearance
Asbestos Type Range & VAE
(Back side/interior side)
1 100% Grey Cement Material w/Aggr ND
Collected on 10/20/2026Method of Preparation: Crush
Notes: Limit of Detection is less than 0.1%. 'ND' = Not Detected (less than 0.1%). ‘Trace’ = Trace amounts (exceeds
0.1% and less than 1%).
Tremolite* = Tremolite asbestos; Actinolite* = Actinolite asbestos; Anthophyllite* = Anthophyllite asbestos.
Asbestos (3%)
(Modified EPA Method 600/R-93-116)
Bulk Asbestos Analysis
Report Number: B212874 -v1
Date Received: 10/22/2026
10/27/2026
Job Name: BPA CALL 162 BUILDING 121 , CAMP ZAMA
Date Analyzed:
Date Reported:
10/27/2026
Sample ID Sample Name Lab Number
162-06A 20055594
<Layer Details>
Layer
Number
Percent of Layer Layer appearance
Asbestos Type Range & VAE
(Back side/interior side)
1 40% Grey Cement Material w/Aggr ND
2 60% Grey Mastic Chrysotile 5%
Collected on 10/20/2026Method of Preparation: Dissolve, Crush
Notes: Limit of Detection is less than 0.1%. 'ND' = Not Detected (less than 0.1%). ‘Trace’ = Trace amounts (exceeds
0.1% and less than 1%).
Tremolite* = Tremolite asbestos; Actinolite* = Actinolite asbestos; Anthophyllite* = Anthophyllite asbestos.
Asbestos (ND)
(Modified EPA Method 600/R-93-116)
Bulk Asbestos Analysis
Report Number: B212874 -v1
Date Received: 10/22/2026
Date Reported: 10/27/2026
QC Analyst:
Job Name: BPA CALL 162 BUILDING 121 , CAMP ZAMA
Date Analyzed:
Analyst:
10/27/2026
Sample ID Sample Name Lab Number
162-07A 20055595
<Layer Details>
Layer
Number
Percent of Layer Layer appearance
Asbestos Type Range & VAE
(Back side/interior side)
1 99% Grey Cement Material w/Aggr ND
2 1% Beige Non-Fibrous Material ND
Collected on 10/20/2026Method of Preparation: Crush
Notes: Limit of Detection is less than 0.1%. 'ND' = Not Detected (less than 0.1%). ‘Trace’ = Trace amounts (exceeds
0.1% and less than 1%).
Tremolite* = Tremolite asbestos; Actinolite* = Actinolite asbestos; Anthophyllite* = Anthophyllite asbestos.
Asbestos (Trace)
(Modified EPA Method 600/R-93-116)
Bulk Asbestos Analysis
Report Number: B212874 -v1
Date Received: 10/22/2026
Date Reported: 10/27/2026
QC Analyst:
Job Name: BPA CALL 162 BUILDING 121 , CAMP ZAMA
Date Analyzed:
Analyst:
10/27/2026
Sample ID Sample Name Lab Number
162-08A 20055596
<Layer Details>
Layer
Number
Percent of Layer Layer appearance
Asbestos Type Range & VAE
(Back side/interior side)
1 97% Grey Cement Material w/Aggr ND
2 3% Grey Mastic Chrysotile 5%
Collected on 10/20/2026Method of Preparation: Crush
Notes: Limit of Detection is less than 0.1%. 'ND' = Not Detected (less than 0.1%). ‘Trace’ = Trace amounts (exceeds
0.1% and less than 1%).
Tremolite* = Tremolite asbestos; Actinolite* = Actinolite asbestos; Anthophyllite* = Anthophyllite asbestos.
Asbestos (ND)
(Modified EPA Method 600/R-93-116)
Bulk Asbestos Analysis
Report Number: B212874 -v1
Date Received: 10/22/2026
10/27/2026
Job Name: BPA CALL 162 BUILDING 121 , CAMP ZAMA
Date Analyzed:
Date Reported:
10/27/2026
Sample ID Sample Name Lab Number
162-09A 20055597
<Layer Details>
Layer
Number
Percent of Layer Layer appearance
Asbestos Type Range & VAE
(Back side/interior side)
1 98% Grey Cement Material w/Aggr ND
2 2% Beige Non-Fibrous Material ND
Collected on 10/20/2026Method of Preparation: Crush
Notes: Limit of Detection is less than 0.1%. 'ND' = Not Detected (less than 0.1%). ‘Trace’ = Trace amounts (exceeds
0.1% and less than 1%).
Tremolite* = Tremolite asbestos; Actinolite* = Actinolite asbestos; Anthophyllite* = Anthophyllite asbestos.
Asbestos (ND)
(Modified EPA Method 600/R-93-116)
Bulk Asbestos Analysis
Report Number: B212874 -v1
Date Received: 10/22/2026
10/27/2026
Job Name: BPA CALL 162 BUILDING 121 , CAMP ZAMA
Date Analyzed:
Date Reported:
10/27/2026
Sample ID Sample Name Lab Number
162-10A 20055598
<Layer Details>
Layer
Number
Percent of Layer Layer appearance
Asbestos Type Range & VAE
(Back side/interior side)
1 98% Grey Cement Material w/Aggr ND
2 2% Beige Non-Fibrous Material ND
Collected on 10/20/2026Method of Preparation: Crush
Notes: Limit of Detection is less than 0.1%. 'ND' = Not Detected (less than 0.1%). ‘Trace’ = Trace amounts (exceeds
0.1% and less than 1%).
Tremolite* = Tremolite asbestos; Actinolite* = Actinolite asbestos; Anthophyllite* = Anthophyllite asbestos.
Asbestos (48%)
(Modified EPA Method 600/R-93-116)
Bulk Asbestos Analysis
Report Number: B212874 -v1
Date Received: 10/22/2026
10/27/2026
Job Name: BPA CALL 162 BUILDING 121 , CAMP ZAMA
Date Analyzed:
Date Reported:
10/27/2026
Sample ID Sample Name Lab Number
162-03A 20055599
<Layer Details>
Layer
Number
Percent of Layer Layer appearance
Asbestos Type Range & VAE
(Back side/interior side)
1 95% Off-White Woven Material Chrysotile 50%
2 5% Silver Foil ND
Collected on 10/20/2026Method of Preparation: Tease
Non-Asbestos Fibers: Synthetic(30%)
(Modified EPA Method 600/R-93-116)
Bulk Asbestos Analysis
Report Number: B212874 -v1
Date Received: 10/22/2026
Date Reported: 10/27/2026
QC Analyst:
Job Name:BPA CALL 162 BUILDING 121 , CAMP ZAMA
Notes: (1) Limit of Detection is less than 0.1%. 'Trace' denotes Gravimetric Point Count or TEM analysis required for quantification. 'ND' = 'Not Detected (less than 0.1%)' (2) The results relate only to the items tested. (3) The test report shall not be reproduced, expect in full, without written approval of the laboratory. (4) The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the U.S.
Federal Government.
Determine asbestos fiber presence using PLM*.
(Identify asbestos fiber based on sign of elongation, extinction angle, dispersion staining color, pleochroism and morphology)
Asbestos Detected
Asbestos present
End of Analysis
YES
Beginning of Analysis
YES
Visual estimation of asbestos content under PLM*
No asbestos detected
Reported as None detected (guarantee asbestos <0.1%)
Asbestos <1%
NO
Point count analysis for 1000 points after gravimetric reduction.
Calculate asbestos content with visual estimation. Analysis using
TEM*
Calculate asbestos content based on asbestos points counted and results of gravimetric reduction.
Optional analysis using TEM*
TEM can be used for samples with very low content of asbestos and/or small fiber size.
YES
NO
YES
NO
NO
Analytical Flow* adopted by EFA Laboratories *Actual analytical procedure may vary by client request
*PLM: Polarized Light Microscope *TEM: Transmission Electron Microscope
4 EQI Job No. 300830.162
SAMPLE LOCATION DIAGRAM
November 2026 FIELD SKETCH Building 121, Camp Zama, Japan ENVIROQUEST CO., LTD.
Asbestos Samples Sample No. Description P/N
162-01A Silver wrapped pipe insulation Positive 162-02A Silver wrapped pipe insulation Positive 162-03A Silver wrapped duct insulation Positive 162-04A Concrete floor Negative 162-05A Concrete floor Negative 162-06A Concrete floor Positive 162-07A Concrete floor Negative 162-08A Concrete floor Positive 162-09A Concrete floor Negative 162-10A Concrete floor Negative
162-03A
POSITIVE
NEGATIVE
RED
BLUE
162-04A
162-05A
162-07A
162-08A
162-10A
162-06A
162-09A
162-02A
162-01A
Asbestos Samples Sample No. Description P/N
300830.162-01 Gray flange gasket Positive 300830.162-02 White flange gasket over metal casing Positive 300830.162-03 White flange gasket Positive 300830.162-04 White flange gasket Positive
300830.162-01 300830.162-02 300830.162-03 300830.162-04
RED
BLUE
POSITIVE
NEGATIVE
Asbestos Samples Sample No. Description P/N
300830.162-05 Black gasket Negative
POSITIVE
NEGATIVE
RED
BLUE
300830.162-05
5 EQI Job No. 300830.162
REFERENCE PHOTOGRAPHS
ENVIROQUEST CO., LTD.
Building 121, Camp Zama, Japan
Sample 162-01A
Room 112
Asbestos containing silver wrapped pipe insulation.
Sample 162-02A
Room 112
Asbestos containing silver wrapped pipe insulation.
Sample 162-03A
Room 112
Asbestos containing silver wrapped duct insulation.
Sample 162-04A
Room 110
Non-asbestos containing concrete floor.
Sample 162-05A
Room 110
Non-asbestos containing concrete floor.
Sample 162-06A
Room 110
Asbestos containing concrete floor.
Sample 162-07A
Room 110
Non-asbestos containing concrete floor.
Sample 162-08A
Room 110
Asbestos containing concrete floor.
Sample 162-09A
Room 110
Non-asbestos containing concrete floor.
Sample 162-10A
Room 110
Non-asbestos containing concrete floor.
Sample 300830.162-01
Room 112
Asbestos containing gray flange gasket.
Sample 300830.162-02
Room 112
Asbestos containing white flange gasket over metal casing.
Sample 300830.162-03
Room 112
Asbestos containing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .