This document provides an annual boiler and unfired pressure vessel inspection schedule for facilities at Yokota Air Base in Japan from 2024 through 2030. It lists the inspection types required as internal and external (Type BA), internal and external with a hydrotest (Type BB), operational with pressure or water (Type BC), and internal and external for unfired pressure vessels (Type VA). Inspections are scheduled for specific boilers and unfired pressure vessels by manufacturer, model, vessel number, serial number, installation year, and steam output or volume. The inspection schedule includes the months that different types of inspections will take place each year through 2030 to maintain compliance with ASME and NFPA safety standards.

This inspection schedule appears to be an appendix for the solicitation seeking a boiler and UPV inspection service at Yokota Air Base in Japan. The pre-solicitation is identified as FA520924Q1006 and is being conducted by the Department of the Air Force Pacific Air Forces. The document provides the details needed to understand the scope of inspections required under any resulting contract.

View the file

Other files

File Type Posted
Draft - PWS-Boiler Inspection Yokota.pdf PDF
PWS Appendix A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BA BB BC BA BB BC BA BB BC BA BB BC BA BB BC BA BB BC BA BB BC

1 Takuma Co.,Ltd Water Tube

NPO-

250C

Tokyo 128938

N-3075 NOV 2016 29,000 294.5 May-24 Jun-24 May-25 Jun-25 May-26 Jun-26 May-27 Jun-27 May-28 Jun-28 May-29 Jun-29 May-30 Jun-30

2 Takuma Co.,Ltd Water Tube

NPO-

250C

Hyogo 22742

N-2978 MAY 2004 29,000 294.5 Jul-24 Aug-24 Jul-25 Aug-25 Jul-26 Aug-26 Jul-27 Aug-27 Jul-28 Aug-28 Jul-29 Aug-29 Jul-30 Aug-30

3 Takuma Co.,Ltd Water Tube

NPO-

250C

Hyogo 23363

N-3062 NOV 2015 29,000 294.5 Sep-24 Sep-24 Sep-25 Sep-25 Sep-26 Sep-26 Sep-27 Sep-27 Sep-28 Sep-28 Sep-29 Sep-29 Sep-30 Sep-30

1 Takuma Co.,Ltd Fire Tube

RE-

100FⅡ Hyogo 22567

R-10055 MAY 2005 10,000 114.4 May-24 Jun-24 May-25 Jun-25 May-26 Jun-26 May-27 Jun-27 May-28 Jun-28 May-29 Jun-29 May-30 Jun-30

2 Takuma Co.,Ltd Fire Tube

RE-

100FⅡ Hyogo 22568

R-10056 MAY 2005 10,000 114.4 Jul-24 Aug-24 Jul-25 Aug-25 Jul-26 Aug-26 Jul-27 Aug-27 Jul-28 Aug-28 Jul-29 Aug-29 Jul-30 Aug-30

3 Takuma Co.,Ltd Fire Tube

RE-

100FⅡ Hyogo 22569

R-10057 MAY 2005 10,000 114.4 Sep-24 Sep-24 Sep-25 Sep-25 Sep-26 Sep-26 Sep-27 Sep-27 Sep-28 Sep-28 Sep-29 Sep-29 Sep-30 Sep-30

1 Takuma Co.,Ltd Water Tube

NPO-

200C

Hyogo 23150

N-3015 JUL 2009 25,900 238.0 May-24 Jun-24 May-25 Jun-25 May-26 Jun-26 May-27 Jun-27 May-28 Jun-28 May-29 Jun-29 May-30 Jun-30

2 Takuma Co.,Ltd Water Tube

NPO-

200C

Hyogo 23166

N-3021 JUL 2009 25,900 238.0 May-24 Aug-24 Jul-25 Aug-25 Jul-26 Aug-26 Jul-27 Aug-27 Jul-28 Aug-28 Jul-29 Aug-29 Jul-30 Aug-30

3 Takuma Co.,Ltd Water Tube

NPO-

200C

Hyogo 23174

N-3022 JUL 2009 25,900 238.0 May-24 Sep-24 Sep-25 Sep-25 Sep-26 Sep-26 Sep-27 Sep-27 Sep-28 Sep-28 Sep-29 Sep-29 Sep-30 Sep-30

1 Takuma Co.,Ltd - - Hyogo 64266

0801 JUL 2009 - *¹ 5.64m³ May-24

*²(VA)

May-27

*²(VA)

May-30

*²(VA)

2 Takuma Co.,Ltd - - Hyogo 64359

0802 JUL 2009 - *¹ 5.64m³ May-25

*²(VA)

May-28

*²(VA)

3 Takuma Co.,Ltd - - Hyogo 64373

0803 JUL 2009 - *¹ 5.64m³ May-26

*²(VA)

May-24

*²(VA9

CHP PLANT

BLDG. 533

Superior Boiler, LLC

Water Tube

No. 34.2-

HSRG-

N/A 40341 2022 14,580 131.0 May-24 Jun-24 May-25 Jun-25 May-26 Jun-26 May-27 Jun-27 May-28 Jun-28 May-29 Jun-29 May-30 Jun-30

ANNUAL BOILER INSPECTION SCHEDULES 2024-2030

2024 2025 2026 2027 2028 2029 2030

TYPES OF

INSPECTIONS

TYPES OF

INSPECTIONS

Boiler

/UPV

No.

MANUFACTURE

BOILER

TYPE

MODEL

VESSEL

No.

SERIAL

No.

YEAR

INSTALLED

STEAM

OUTPUT

Kg/hr

HEATING

SURFACE

AREA (m²)

TYPES OF

INSPECTIONS

Type BB: Internal and external inspection followed or preceded by external inspection while boiler is under a hydrostatic test.

Type BC: Operational inspection while under steam pressure or filled with water. This inspection also includes verifying that safety devices perform as intended in accordance with ASME CSD-1 or NFPA 85, as applicable.

Type VA: Internal and external inspection (UPV).

NOTE: *¹ Volume/Capacity

*² VA= type VA inspection (UPV)

TYPES OF INSPECTIONS

Type BA: Internal and external inspection.

H PLANT

BLDG 1245

K PLANT

BLDG 4435

Unfired Pressure

Vessel

BLDG 4435

F PLANT

BLDG 9

TYPES OF

INSPECTIONS

TYPES OF

INSPECTIONS

TYPES OF

INSPECTIONS

TYPES OF

INSPECTIONS