This document is Attachment 4 - Contractor Responsibility from an RFQ (Request for Quotation) for the Tower Installation East (Trunk Relocation) project at Yokota Air Base, Japan. The RFQ number is FA520924Q0028, Amendment 0001.
The key details are: The contractor must certify their responsibility in areas such as having adequate financial resources, ability to comply with the delivery schedule, possession of necessary equipment and facilities, and the necessary organization, experience, and technical skills. The contractor must also indicate if their required licenses will be renewed from the RFQ submission to contract award, and provide the proposed performance period for the tower installation (within [X] Months/Days) and LMR trunking relocation (within [X] Months/Days), with a total period of performance of [X] Months/Days. The contractor must state if they will use subcontractors, joint ventures, or partnerships, and confirm they understand the waste disposal requirements at Yokota Air Base. Finally, the contractor must indicate if the LMR trunking relocation will be conducted by a certified Motorola representative and if they have contacted Motorola regarding the relocation.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ# FA520924Q0028
Amendment 0001
Tower Installation East (Trunk Relocation) for Yokota Air Base, Japan Attachment 4- Contractor Responsibility
(1) General Contractor Responsibility
(i) The Offeror has [___] has not [___], within a three-year period preceding this offer, had one or more contracts terminated for default by any Federal agency.
(ii) Have [___] have not [___], adequate financial resources to perform the contract, or the ability to obtain them.
(iii) Can [___] cannot [___], to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments.
(iv) Have [___] have not [___], the necessary production, construction and technical equipment and facilities, or the ability to obtain them.
(v) Have [___] have not [___], the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).
(2) Licenses
(i) From date of RFQ submission to contract award, the license [___] will be [___] will not be renewed.
(3) Performance Period
(i) From the date of contract award to the completion of all work described in the
PWS, the work will be completed within [___] Months Days (Circle Month or Day) for the installation of the LMR tower and within [___] Months Days (Circle Month or Day) for the relocation of the LMR tunking which is to be commenced immediately after the completion of the LMR tower installation. The total period of performance will be within [___] Months Days (Circle Month or Day) after receipt of award for the entire work scope required in the PWS of this requirement.
(4) Subcontractor/Joint Venture/ Partnership
(i) We [___] do [___] do not contemplate performance on this contract through
Subcontractor/ Joint venture /Partnership.
RFQ# FA520924Q0028
Amendment 0001
Tower Installation East (Trunk Relocation) for Yokota Air Base, Japan Attachment 4- Contractor Responsibility
(5) Other
(i) We [___] do [___] do not verify that the quoted prices are based on services being conducted at Yokota Air Base Japan and accordingly all waste generated through the performance of the project will be disposed of off-base through a local municipality in Japan.
(ii) We [___] were [___] were not in attendance for the mandatory site visit conducted on 13 May 2024, and understand the conditions of the site and work required.
(6) Motorola
(i) The relocation of the Motorola LMR trunking system will [___] will not [___] be conducted by a certified Motorola representative.
(ii) We [___] have [___] have not contacted Motorola regarding the relocation of the LMR trunking system.
Contractor's Response:
I certify on that all answers above are correct to the best of my knowledge. If for any reason any answer changes before award, I will notify the government immediately.
Signature:
Date:
Name:
Position:
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Text15: |
| Text16: |
| Text17: |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Date26_af_date: |
| Text27: |
| Text28: |
File details come from the government source that posted it. Updated .