This performance work statement outlines requirements for the erection, rental, and dismantling of prefabricated facilities and electrical distribution systems in support of Exercise Yama Sakura 81 at Camp Itami, Japan. The contractor shall provide all necessary personnel, equipment, materials, and services to erect four prefabricated buildings, install nine generator plants with eighteen generators total, and establish electrical power distribution systems to fully power designated facilities from November 17, 2021 to December 23, 2021. The contractor must also dismantle all temporary facilities and restore sites by January 31, 2022. Submittals and quality control plans are required along with regulatory compliance, management plans, and personnel qualifications. The Department of the Air Force Pacific Air Forces will issue a solicitation for these support services in Japan with an anticipated start date of September 23, 2021 and completion by January 31, 2022.

View the file

Other files

File Type Posted
QandA1.pdf PDF
FA520921Q00910001 SF 30.pdf PDF
Pricing exhibit.pdf PDF
Business w US Government.pdf PDF
Solicitation - FA520921Q0091.pdf PDF
Notice to Offeror.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 RFQ# FA520921Q0091

Army Exercise YS81-Prefab&EDS

DEPARTMENT OF THE ARMY

UNITED STATES ARMY JAPAN

G-3, EXERCISE DIVISION

ATTN: APAJ-GCX-EX

APO AP 96343-5005

PERFORMANCE WORK STATEMENT

TO PROVIDE

ERECTION, RENTAL, AND DISMANTLING OF

PREFABRICATED FACILITIES / ELECTRICAL

DISTRIBUTION SYSTEM (EDS)

IN SUPPORT OF YAMA SAKURA 81

CAMP ITAMI, JGSDF

HYOGO, JAPAN

16 Aug 2021

Army Exercise YS81-Prefab&EDS

TABLE OF CONTENTS

SECTION 1 DESCRIPTION OF SERVICES / GENERAL INFORMATION

SECTION 2 SERVICE SUMMARY

SECTION 3 RESERVED

SECTION 4 APPENDICES

SECTION 1

DESCRIPTION OF SERVICES/GENERAL INFORMATION

1.0. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary for erection, rental, and dismantling of prefabricated facilities/electrical distribution systems (EDS) at YS-22-81 Camp Itami, Hyogo, Japan Ground Self Defense Force (JGSDF), in accordance with (IAW) this Performance Work Statement (PWS), attached drawings, and, commercial and local standards and practices.

(a) The erection, rental, maintenance, heating and dismantling of four (4) Prefabricated Buildings to be used as a temporary Mission Training Complex (also referred to as Central Control Facility) and two (2) entry control access points for the Main Command Post (CP) area:

1. Prefabricated Building No. 1: 9m x 64.8m, 2-Story for Central Control Facility

(Sheet S-03)

2. Prefabricated Building No. 2: 9m x 75m, 2-Story for Central Control Facility (Sheet

S-04)

3. Prefabricated Building No. 3: 5.4m x 3.6m, 1-Story for access control points at Main

Command Post Area (referenced drawings Sheets S-06/7)

4. Prefabricated Building No. 4: 3.6m x 3.6m, 1-Story for access control points at Main

Command Post Area (referenced drawings Sheets S-06/7)

(b) The erection, rental, noise abatement testing, maintenance and dismantling of an electrical power distribution system(s) sufficient to fully power or supplement the following facilities:

1. Prefabricated Buildings

2. Post Gymnasium BLDG #205

3. Main Command Post Area

4. Camp Dining Facility, BLDG #195

1.1. Performance Period. The performance period of this contract is 23 September 2021 (or date of award if later) through 31 January 2022, and is broken out into the below phases:

1.1.1. Erection. The contractor shall deliver and commence erection on 23 September 2021 (or date of contract award, whichever is later) and complete work by 17 November 2021. Generator installation with noise abatement testing and verified compliance with local ordinance by COR shall be completed by 17 November 2021.

1.1.2. Rental. Generator and Prefabricated Building rental period shall be from 17 November 2021 to 23 December 2021.

Army Exercise YS81-Prefab&EDS

1.1.3. Facility Acceptance Inspection. The COR will conduct a facility acceptance inspection on 15-16 November 2021, however the date is subject to change.

1.1.4. Dismantling/Restoration. The contractor shall dismantle the electrical power distribution system(s) no later than 31 January 2022. Dismantling includes the restoration of all worksites and facilities to an acceptable and reasonable condition. The start date and schedule for dismantling/restoration work will be coordinated with the Contracting Officer’s Representative (COR) prior to commencement of work.

1.2. Prefabricated Buildings.

1.2.1. The contractor shall provide “Kumitate-Shiki” type pre-fab buildings, using ”V” shape 0.8mm thick (H= 88mm) light-gage steel. The minimum section modulus (Zx) shall be 22.42 cm³/cm with flat-type ceilings, insulated walls, windows, fixed and/or sliding doors, floor panels, insulated ceiling, insulated wall partition, access stairways, door canopies and other related items.

The contractor shall provide exterior building buttress support and outer stairways. Erection standards for each building shall be IAW guidelines established by the manufacturer for the intended purpose of use. The Means of egress requirements for prefabricated buildings (Prefabricated Buildings No.1 and No. 2) shall comply with Chapter 10 Means of egress and Section 3103, Temporary Structures of the International Building Code (IBC).

1.2.2. Wall panels shall be 40mm (minimum) thick and consist of an insulation core faced on both sides with approximately 0.27mm metal sheets.

1.2.3. Two (2) 1800mm interior wooden stairways with handrails and three (3) 900 type steel exterior stairways with inside handrails, sidewalls and plastic corrugated sheet roofing shall be constructed at both ends and center each two-story building and center of . These stairways shall comply with the IBC.

1.2.4. Skirt boards (12mm thick plywood) between building base and ground shall be provided for each building.

1.2.5. Baffles and vertical walls shall be provided at each interior stairway to prevent heat loss from the lower floors.

1.2.6. Plastic corrugated sheet canopy, exterior lighting, wooden steps with doormat and stairs shall be provided at each exterior entrance by the contractor.

1.2.7. Exterior entrance doors shall be aluminum panel sliding doors (2000mm height) and shall include a lock device as shown on drawings.

1.2.8. All window glass shall be frosted.

1.2.9. Access holes shall be provided for network/electrical cabling in walls, ceiling panels and floorboards throughout prefabricated buildings. The COR will direct access-hole locations and sizes as needed.

Army Exercise YS81-Prefab&EDS

1.2.10. Floor to ceiling insulated partition walls shall be provided with lockable sliding doors in pre-fab buildings No. 1. Wall thickness shall be no less than 90mm.

1.2.11. Exit signs and directional exit signs (“EXIT” and “EXIT” with Chevron-Type directional indicator) shall be provided at corridors and each exterior doors for prefabricated buildings No. 1 and No. 2. Exit signs and directional exit signs shall be photo-luminescent type.

a. Directional exit signs: One (1) for exterior door at each end, and one (1) or two (2) for exterior door at the middle section of floor. If Directional exit sign for the middle section has a both faces type, quantity may be one (1).

b. Exit Sign: One (1) for each exterior door.

1.2.12. Air conditioner heaters shall be provided as follows:

a. Prefabricated Building No. 1. The contractor shall provide a total of fourteen (14) air conditioner heaters (ceiling hanging type or standalone type) with a 8.0kW heating capacity and all necessary reinforcement for installation per a unit as following locations:

1. First Floor: seven (7) units

2. Second Floor: seven (7) units

b. Prefabricated Building No. 2. The contractor shall provide a total of sixteen (16) air conditioner heaters (ceiling hanging type or standalone type) with a 8.0kW heating capacity and all necessary reinforcement for installation per a unit as following locations:

1. First Floor: eight (8) units

2. Second Floor: eight (8) units

c. Prefabricated Building No. 3 and 4. The contractor shall provide one (1) air conditioner heater (preferably wall mounted) with a 4.0kW heating capacity and all necessary reinforcement for installation per a building.

1.2.13. The contractor shall be responsible to provide spill preventions and response plans for petroleum oil lubricants (POL) of generators under this contract.

1.3. Electrical Power Distribution System.

1.3.1. The contractor shall provide an electrical power distribution system for the facilities provided in para 1.0 above. This electrical system shall be completed with cable wiring, panel boards, fluorescent lighting, wall switches, receptacles and bracket lights at entrances IAW the attached drawings and para 1.3.

1.3.2. Nine (9) generator plants with two (2) generators each shall be provided as follows:

1. Diesel engine generator 300KVA, 3PH-4W-120/208V, 60Hz

Army Exercise YS81-Prefab&EDS

2. Diesel engine generator 150KVA, 3PH-4W-120/208V, 60Hz

3. Diesel engine generator 220KVA, 3PH-4W-120/208V, 60Hz

4. Diesel engine generator 150KVA, 3PH-3W-120/208V, 60Hz

5. Diesel engine generator 150KVA, 1PH-3W-105/210V, 60Hz

6. Diesel engine generator 220KVA, 3PH-4W-120/208V, 60Hz

7. Diesel engine generator 300KVA, 3PH-4W-120/208V, 60Hz

8. Diesel engine generator 220KVA, 3PH-4W-120/208V, 60Hz

9. Diesel engine generator 150KVA, 3PH-4W-120/208V, 60Hz

1.3.2.1. All power plants must be serviced by two (2) generators for a total of Eighteen (18).

Generators shall be automatic synchronizing type and enclosed and/or be sound-proofed consistent with previously listed local ordinance. Generator plants shall be surrounded by the noise abatement materials.

1.3.2.2. Fuel and lubricants shall be provided by the contractor for all generators throughout the rental period except emergency cases; the contractor will leave fuel/oil delivery slips with the COR after each delivery. Fuel may be provided by U.S. government in case of emergency.

1.3.3. The contractor shall provide and install electrical distribution wiring, fixtures, outlets, cables, wiring, accessories, and molded case circuit breakers.

1.3.4. The contractor shall provide suspension wires in work tents sufficient to attach fluorescent lighting systems.

1.3.5. Electrical system shall be installed in the existing buildings and the tents with cable wiring, panel boards, fluorescent lighting, wall switches, receptacles and bracket lights at entrances.

1.3.6. All 120V power drops shall be painted red for easy identification.

1.3.7. Electrical power shall be provided and maintained 24hr/7days for continuous and uninterrupted power throughout the rental period. Maintenance service shall be provided without delay or interruption and commence 17 November 2021 at 0830 and conclude 23 December 2021 at 1700 (rental period).

1.3.8. Repair service for all the electrical facilities, generators, power distribution system, electrical accessories, fluorescent lights and other light fixtures shall be provided by the contractor on an “on-call” basis.

1.3.9. Only the designated COR can order changes to add, modify, repair or extend electrical power services from anyone else, to include the JGSDF, representatives or visiting U.S. Military Forces. COR shall report and be approved by the Contracting Officer (KO) prior add, modify, repair or any other changes of work.

1.4. Electrical Work Specification. Electrical work shall meet or exceed the following specifications.

Army Exercise YS81-Prefab&EDS

1.4.1. Code Compliance. Electrical installation shall comply with all requirements specified by the National Fire Protection Association (NFPA), No. 70, National Electrical Code, Chapter 5, Special Occupancies, Article 590, “Temporary Installations”, the Japan Electric Association (JEA) and/or Public Building Master Guide Specifications for Electrical Work (Koukyou kenchiku kouji hyoujun shiyousho - Dennki setsubi koujihen). The construction of stairways shall comply with international building code (IBC).

(NFPA): https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=70

(JEA): https://www.jesc.gr.jp//jesc-assent/private/jesc_e0003_12.html

Public Building Master Guide Specifications for Electrical Work (Koukyou kenchiku kouji hyoujun shiyousho - Dennki setsubi koujihen):

https://www.mlit.go.jp/gobuild/gobuild_tk4_000017.html

IBC: https://www.iccsafe.org/

1.4.2. General Installation Requirements. All materials and equipment shall be installed IAW approved codes, standards, and manufacturer recommendations.

1.4.3. Grounding. Ground rods and wire conductors for equipment grounding shall be installed IAW Article 590 of National Electrical Code and Japan Electric Association (JEA) standards.

1.4.4. Operating Tests. Upon installation of electrical generators and power distribution systems, the contractor shall conduct operating tests to verify serviceability prior to delivery.

Equipment tests shall be performed in the presence of the COR. The contractor shall furnish instruments, materials, and personnel required for the test.

1.4.5. Ground-Resistance Measurements. Ground-resistance measurements shall be certified by the contractor and provided to the COR upon completion of electrical system installation.

The data provided shall include the measured ground resistance of each grounding rod, the rod’s location, grounding system used, soil conditions, and noted resistance at the time of measurement. Ground-resistance measurements shall be made in normal dry weather, not less than 48-hours after rainfall, with the underground test location isolated from other grounding rods. If applicable, the contractor shall dig a hole and shall remove frozen soil to make dry conditions for the measurements. The ground resistance shall be measured using the ‘fall-of-potential’ method before the operating test and shall not exceed 25 ohms (10 ohms for the Command Post area and Central Control Facility area) when measured in normal dry conditions.

1.5. Engineering Support. The contractor shall provide well-qualified an employee(s) at the job site 24hr/ 7days for maintenance. For electrical work requiring an engineer, the engineer(s) to be provided shall be possessed at least a 2nd Category Electrical Engineer’s Licenses (第⼆種 電気⼯事⼠)(experience over 10 years) to perform maintenance and repair of electrical generators, power distribution systems, and all other equipment.

Army Exercise YS81-Prefab&EDS

1.6. Work Space. The Government will allow the contractor to set up a work space for their employees for this requirement at the site. The location shall be coordinated through the COR and provided to the contractor prior to contract performance; the COR will provide suitable ground space in close proximity to the work site but not to exceed twenty (20) square meters.

1.7. Submittals. The contractor shall provide submittals to the COR for approval for each item listed below within the specified number of days following contract award. Descriptive information shall be supported by catalogs, certificates of compliance, or other data published by the manufacturer, manufacturer’s shop drawings, testing / visual inspection reports, manufacturer’s quality control program, and checklist to demonstrate conformance with specification requirements prior to installation.

1. Electrical materials and equipment (Provide the COR within seven (7) business days):

a. Cables

b. Lighting fixtures

c. Enclosed circuit breakers

d. Generators

2. Shop drawings for Prefabricated buildings (Provide the COR within seven (7) business days):

a. Floor Plans of prefabricated buildings to identify locations of bracing, exterior doors, interior/exterior stairs, Exit signs / directional exit signs, etc.

b. Foundations for prefabricated buildings

3. Utility equipment (Provide the COR within ten (10) business days):

a. Air conditioner heaters for each prefabricated building

b. Spill preventions and response plans for POL

4. Testing / Visual Inspection Reports: Test / visual inspection report shall be submitted to the COR for approval within three (3) calendar days after the testing / visual inspection and at least three (3) calendar days prior to the first day of operation period indicated on paragraph 1.1.2. Approval of test / visual inspection report will conform to the paragraph

1.3.1. The test / visual inspection report shall include followings as minimum; (i) date of testing/inspection, (ii) equipment names, (iii) electrical engineer, (iv) names of COR, (v) weather condition and all other information to support the testing / visual inspection report conforming to the requirements of specification and references.

Testing / Visual Inspection Report:

Grounding Resistance Test Insulation Resistance Test Voltage Check Test Electrical Polarity Check

Electrical Phase Check (If applicable)

5. Contractor shall conduct manufacture’s quality control for prefabricated buildings in accordance with manufacture’s installation instruction manual during erecting. The contractor shall provide test report to the COR at least three (3) business days prior to the day of inspection by the Government.

6. Contractor shall conduct manufacture’s operational tests for each air conditioner heater.

1.8. Disposal of Materials. The contractor shall remove all debris and unsalvageable materials generated at the work site IAW local Japanese law. No debris will be disposed of on the JGSDF installation.

1.9. Removal and Restoration. After the removal of pre-fab buildings, the contractor shall repair any ground surface damage caused by temporary construction to its “as was” or original condition. Contractor shall receive the approval from COR for all repairs.

2.0. GENERAL INFORMATION.

2.1. Contractor Personnel.

2.1.1. Contract Manager. The contractor shall provide a contract manager who shall be responsible for the work on site during work hours. The name of this person and any alternate(s) who shall act for the contractor when the manager is absent, shall be designated in writing to the KO prior to the commencement of contract work. The manager/alternate(s) shall have full authority to act for the contractor on all matters relating to this contract. The manager / alternate(s) shall be proficient in English and Japanese, and have a good understanding of the requirements pertaining to this contract for interpretation and implementation of directives (written and oral), issued in English and Japanese by the KO or COR. The Contract Manager shall be responsible to coordinate with U.S. key stakeholders and JGSDF key personnel through the COR prior to and during the performance of work. The Contract Manger shall furnish the contractor organization chart and contact roster includes the COR, U.S. key stakeholders, JGSDF key personnel and Contract Manager/alternate in case of work coordination, emergency and accident.

2.1.2. Contract Manager Availability. The Contract Manager/alternate shall be physically present or readily available throughout the contract period. The Contract Manager/alternate should be available for meetings at the worksite within one (1) hour of a COR request for repair service and within two (2) hours for routine administrative matters.

2.1.3. Contract Manager and his/her alternate shall specify their position by badges or arm bands.

2.1.4 Contractor Employees. The contractor personnel shall be easily recognizable as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which contain the contractor’s company

Army Exercise YS81-Prefab&EDS name and the employee’s name. The contractor shall not employ personnel who have been identified to the contractor as a potential threat to health, safety, security, general well- being or operational mission of the installation or its population.

2.1.5. Contractor Manager’s Qualification. The contractor shall be responsible for obtaining all necessary licenses and permits to perform the work described by this PWS. The Contract

Manager/alternate shall possess at least a 2nd Category Electrical Engineer’s Licenses (第⼆種 電気⼯事⼠)and 10 years of experience in electrical work to supervise the work site.

2.1.6. Removal of Contractor’s Employees. The contractor shall utilize only experienced, responsible and capable employees in the performance of this contract. The KO may require that the contractor remove any of his/her employees who endanger persons or property, or whose continued employment under this contract is inconsistent with the interests of the U.S.

Government.

2.1.7. Other Country Nationals (OCN). The Security Forces on each base control entry to the base. Under certain circumstances, the OCN might be denied entry. It is the contractor’s responsibility to coordinate with Security Forces at each base when there is a question about particular entry circumstances.

2.1.8. U.S. Government and/or Master Labor Contract Employees. The contractor shall not hire employees of the U.S. Government and/or Master Labor Contract employees in accordance with the Procurement Integrity Act. See Federal Acquisition Regulation (FAR) Section 3.104.

Further, the contractor shall not employ any Department of Defense employee, either military or civilian, unless such person seeks and receives approval in accordance with Department of Defense 5500.7-R, Joint Ethics Regulation.”

2.2. Quality Control. The contractor shall develop and maintain a quality control program to ensure the services are performed IAW commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of defective services. At a minimum, the contractor shall develop quality control procedures addressing the areas identified in Section 2, Services Summary.

2.3. Quality Assurance. The Government will evaluate the contractor’s performance IAW the Quality Assurance Surveillance Plan (QASP) by appointing a COR(s) to monitor performance to ensure services are received.

2.4. Government Remedies. The KO will follow FAR 52.212-4, Contract Terms and Conditions- Commercial Items, for the contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

2.5. Contracting Officer (KO) Authority. Only the KO has authority to enter into, administer, terminate or modify the terms and conditions herein. Any changes made by persons other than the KO will be considered an Unauthorized Commitment and subject to Ratification Actions in accordance with the FAR 1.602-3.

Army Exercise YS81-Prefab&EDS

2.6. Contracting Officer’s Representative (COR). The contractor shall coordinate all aspects of this project with the COR. Completed work shall be subject to inspection and acceptance by COR. This designation will be made in writing by the KO at the time of contract award, or prior to commencement of COR duty. The COR shall NOT direct or redirect any contractor action(s).

This can only be done by the KO.

2.7. Hours of Operation. The work site will be made available to the contractor for erection and dismantling of buildings and other facilities, and for repair and maintenance of buildings and utilities systems 24hrs/7days, including Japanese and U.S. holidays. Deviation from this requirement may be made with the approval of the COR.

2.8. Security Requirements. The contractor shall ensure each employee obtains required access passes and identification items for entry to the JGSDF work site. The contractor shall be responsible for all controlled-area pass or badges issued to his/her employees under this contract IAW JGSDF regulations. The contractor shall return employee identification cards to JGSDF security forces within 24-hours of work termination. Management of access passes and entry approval remains the sole responsibility of JGSDF security forces. Questions concerning entry policy must be addressed directly to the installation security office.

2.8.1. Off Limit Signs. The contractor shall provide warning and/or ”OFF LIMITS” signs in both English and Japanese and post them at the entrances of jobsite, and barricades around the worksite while the equipment and/or systems are being serviced. The contractor shall control all personnel desiring access into jobsite areas when work is in progress.

2.8.2. Photography Permission. The contractor shall obtain COR approval prior to commencing any photography.

2.9. Reports of Damages, Destruction, Injury, or Death.

2.9.1. The contractor shall report all incidents of damage or destruction to property, or personal injury or death of any person, arising out of and during the performance of this contract. The term “property” includes equipment, freight, or property of any type, whether Government owned or not. The term “Contractor” and “Subcontractors” includes the contractor, its agents, servants or employees.

2.9.2. The contractor shall submit these reports to the KO through the COR as follows:

(a) A preliminary report shall be made as soon as practicable after the time the incident occurs.

The report may be either verbal or facsimile.

(b) A complete written report shall be submitted within 4 days (96 hours) after occurrence of the incident. A copy of this report shall be furnished to the COR.

2.10. CONTRACT MANPOWER REPORTING. The contractor shall report ALL labor hours (including subcontractor labor hours) required for the performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at https://www.sam.gov/SAM/.

Army Exercise YS81-Prefab&EDS

2.10.1. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October each calendar year. Contractors may direct questions to the CMRA help desk.

2.10.2. Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

SECTION 2

SERVICES SUMMARY

The following Services Summary identifies the performance objectives and performance thresholds for critical tasks associated with providing support services for this requirement. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. As a general rule, defects are categorized as follows: (1), ‘Major’ defects that present significant safety or health hazards to customer or contract employees (e.g. improperly braced or attached exterior stairs) and (2), ‘Minor’ defects that though inconvenient or annoying, do not impede or delay mission accomplishment (e.g. missing light fixture or plug receptacle).

Performance Objective PWS Paragraph

Performance Threshold Method of Assessment

SS#1: Quality.

Erection and Maintenance of Electrical Power Distribution System (EDS) The contractor shall meet quality requirements for erection and maintenance of EDS.

1.3. Six (6) minor defects are

allowed that are correctable and not affecting the performance period.

Periodic Inspections Rental Period (Every Other Week) Customer Complaints

SS#2: Performance Schedule.

The contractor shall meet required performance timelines.

1.1.1. thru 1.1.4.

One (1) time of two (2) days behind from the schedule is allowed per months during performance

Periodic Inspections (Monthly)

SS#3: Management.

The contractor shall satisfactorily address human resource functions, necessary for maintenance and repair service.

1.4.5 & 2.1.2.

One (1) defects allowed but none of them fails to respond in a timely manner.

Periodic Inspections (Every Other Week)

SS#4: Management.

Submittals.

Timely submission of the required documents.

1.7. Two (2) minor defects are

allowed that are correctable and not affecting the performance period.

100% Inspection

SS#5: Regulatory Compliance.

The contractor shall follow PWS referenced publications, as well as the terms and conditions of this contract.

1.4.1 thru 1.4.3

One (1) correctable error not to following the PWS referenced publications as well as the terms and conditions.

100% Inspection

Note: Adjustments to the method of assessment shall remain the unilateral right of the Government, in so far as the change does not affect cost or cause delays in performance. The contractor may not use the method of assessment for any excusable delay.

Army Exercise YS81-Prefab&EDS

SECTION 3

RESERVED

SECTION 4

APPENDICES

A. Site Plans and/or Details

Drawing No. Description

YS-22-81 T-01 CAMP ITAMI

BASE CAMP

TITLE SHEET

YS-22-81 S-01 CCF LAYOUT PLAN

YS-22-81 S-02 PLAN OF BLDG NO.205

YS-22-81 S-03 PLAN OF PREFAB BLDG NO. 1 AND DETAIL

YS-22-81 S-04 PLAN OF PREFAB BLDG NO. 2

YS-22-81 S-05 TYP SECTION OF PREFAB BLDG

YS-22-81 S-06 CP AREA LAYOUT PLAN

YS-22-81 S-07 PLANS AND SECTION

YS-22-81 S-08 ELECTRICAL DISTRIBUTION PLAN FOR "CCF" AREA, 120V

YS-22-81 S-09 ELECTRICAL DISTRIBUTION PLAN FOR "CCF" AREA, 100V

YS-22-81 S-10 ELECTRICAL FEEDER PLAN FOR BLDG NO. 205, 120V

YS-22-81 S-11 ELECTRICAL FEEDER PLAN FOR BLDG NO. 205, 100V

YS-22-81 S-12 ELECTRICAL PLAN FOR BLDG NO. 205 1st FLOOR AND DETAILS, 120V YS-22-81 S-13 ELECTRICAL PLAN FOR BLDG NO. 205 2nd FLOOR AND DETAILS, 120V

YS-22-81 S-14 ELECTRICAL LIGHTING PLAN FOR BLDG NO. 205

YS-22-81 S-15 ELECTRICAL PLAN FOR BLDG NO. 205 AND DETAILS, 100V

YS-22-81 S-16 ELECTRICAL FEEDER PLAN FOR PREFAB BLDGS 1st FLOOR, 120V YS-22-81 S-17 ELECTRICAL FEEDER PLAN FOR PREFAB BLDGS 2nd FLOOR, 120V YS-22-81 S-18 ELECTRICAL FEEDER PLAN FOR PREFAB BLDGS 1st FLOOR, 100V YS-22-81 S-19 ELECTRICAL FEEDER PLAN FOR PREFAB BLDGS 2nd FLOOR, 100V YS-22-81 S-20 ELECTRICAL PLAN FOR PREFAB BLDGS 1st FLOOR AND DETAILS, 120V

YS-22-81 S-21 ELECTRICAL PLAN FOR TECH. CONT. ROOM AND DETAILS, 120V

YS-22-81 S-22 ELECTRICAL PLAN FOR PREFAB BLDGS 2nd FLOOR AND DETAILS, 120V YS-22-81 S-23 ELECTRICAL LIGHTING PLAN FOR PREFAB BLDGS 1st FLOOR YS-22-81 S-24 ELECTRICAL LIGHTING PLAN FOR PREFAB BLDGS 2nd FLOOR YS-22-81 S-25 ELECTRICAL PLAN FOR PREFAB BLDGS 1st FLOOR AND DETAILS, 100V YS-22-81 S-26 ELECTRICAL PLAN FOR PREFAB BLDGS 2nd FLOOR AND DETAILS, 100V

YS-22-81 S-27 ELECTRICAL DISTRIBUTION PLAN FOR "CP" AREA, 120V

YS-22-81 S-28 ELECTRICAL PLAN FOR TENT AND DETAILS, 120V (1)

YS-22-81 S-29 ELECTRICAL PLAN FOR TENT AND DETAILS, 120V (2)

YS-22-81 S-30 ELECTRICAL PLAN FOR TENT AND DETAILS, 120V (3)

YS-22-81 S-31 ELECTRICAL PLAN FOR TENT AND DETAILS, 120V (4)

YS-22-81 S-32 ELECTRICAL PLAN FOR ACCESS CHECK POINT AND DETAILS, 100V

YS-22-81 S-33 ELECTRICAL DISTRIBUTION PLAN FOR "DFAC" AREA

YS-22-81 S-34 ELECTRICAL PLAN FOR BUILDING NO. 195 AND DETAILS

YS-22-81 S-35 ELECTRICAL PLAN FOR FOOD PREPARE TENT AND DETAILS