Amend_FA520919QA0420001_SF_30.pdf

PDF 520 KB Posted

Attached to
Inspection and Maintenance of Electric Gate Systems at Yokota Air Base, Japan
Solicitation number
FA520919QA042
Issued by

About this file

Amendment 0001

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The Purpose of This Amendment Is: The purpose of this amendment are to delete following words in Standard Form 1449 and Performance Work Statement (PWS). The red lines in the left side margin show the places of changes.

1. Forth paragraph on Page 47 of Standard Form 1449, the word, "limited to two decimal places," has been deleted.

2. Paragraph 1.7.1., Normal Hours of Operation on Page 3 of PWS, the word, "except that services performed at the Fussa gate and Supply gate are from 0000 to 2400 hours" and the date of cover page of PWS was changed to 30 Jul 19.

Attachment: PWS dated 30 Jul 19

List of Attachments

Miscellaneous text in this section has been modified to:

LIST OF DOCUMENTS, EXHIBITS, OR ATTACHMENTS:

Atch No. Description Date Page

1. Government Policy Letter 1

2. Past Performance Reference List N/A 1

3. Performance Work Statement (PWS) 30 Jun 19 20 with Appendix A - Electric Gate

Systems Information and

Service Repair Calls

History

Appendix B - Map of Gate

Location and As-built

Drawings

Exhibit 1 Service Repair Calls (Contract N/A 1

Line Item No.(CLIN) X002, Stipulated in Section B)

* The above attachment 1 and 2 will not be a part of the resultant contract.

Representations, Certification, & Other Statements

The following clauses were modified:

52.212-1 - Instructions to Offerors-Commercial Items. Oct 2018 hereby reads as follows:

Addenda to 52.212-1 Instructions to Offerors - Commercial Items. (OCT 2018)

1. Paragraph 52.212-1(c), "Period for Acceptance of Offers," is tailored as follows: "The offeror agrees to hold the prices in itsoffer firm for 120 calendar days from the date specified for receipt of offers."

2. The following is inserted as new paragraph (m) of the provision:

(m) Quotation Preparation Instructions.

(1) To assure timely and equitable evaluation of proposals, quoters must follow the instructions contained herein. Quotersare required to meet all solicitation requirements, including terms and conditions, representations and certifications, andtechnical requirements, in addition to those identified as evaluation factors or subfactors. Quoters must clearly identify any exception to the

FA520919QA0420001

solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of three (3) separate parts; Part I - Summary and MiscellaneousData, Part II - Price Proposal, Part III - Past Performance Proposal.

(2) Specific Instructions:

PART I - SUMMARY AND MISCELLANEOUS DATA.

(a) Standard Form (SF) 1449. Complete blocks 12, 17a, 30a, 30b, and 30c. In doing so, the quoter accedes to the contractterms and conditions as written in the solicitation.

(b) Complete the necessary fill-ins and certifications in provisions and in the on-line Representations and Certifications at www.sam.gov. Return the provision FAR 52.212-3, Offeror Representations and Certifications - Commercial Items, along with the quotation. For other provisions and clauses in the solicitation, the quoter is required to submit the pages that require a quoter fill-in.

(c) Submit an acknowledgment of the all solicitation amendments, if issued.

(d) All offerors shall submit copies of licenses as required at paragraphs 1.8.2.3. of the PWS. In the eventthe offeror does not submit the required licenses, the offeror may not be deemed "Responsible" in accordance with FAR9.104-1 rendering them ineligible for award.

The quoter shall provide cerifications/licenses IAW PWS para 1.8.2.3. listed below:

1. A license of 1st Class or 2nd Class Electrician with experience period of performing electrical works.

PART II - PRICE.

(a) This part shall contain a completed Schedule of Supplies/Services, continuation sheets of SF 1449, blocks 19 - 24.

(b) Insert proposed unit price(s) and extended amount(s) in the Schedule of Supplies/Services for each Contract Line ItemNumber (CLIN), including all option periods. The extended amount must equal the unit price multiplied by the number of units. It is imperative that mathematical calculations are correct; particular care should be taken to ensure the amounts match when using the EXCEL program.

(c) Extreme care should be exercised to ensure that no price data of any kind are included in Part III.

PART III - PAST PERFORMANCE.

(a) Past Performance Information (PPI).

Provide a list of no more than three (3) recent and relevant contracts performed for any customer.

[See definitions of recentand relevant in addendum to 52.212-2, paragraph (d)(2)]. Furnish the following information for each contract listed:

(i) Company/Division name

(ii) Description of Product/Service

(iii) Contracting Agency/Customer

(iv) Contract Number

(v) Contract Value

(vi) Period of Performance

(vii) Verified, up-to-date name, mailing and e-mail addresses, and telephone number of the contracting officer (Point-of-Contact)

(viii) Comments regarding compliance with contract terms and conditions

(ix) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions.

Include rationale supporting your assertion of relevance and identify aspects of the contracts deemed relevant and how theyrelate to the proposed effort. If an quoter has no past performance history of relevance, the quoter must affirmatively state itpossesses no past performance history of relevance.

(b) Quality and Satisfaction Rating of Contracts. Provide any PPI currently available (letters, metrics, customer surveys,independent surveys, etc.) that demonstrates customer satisfaction with overall job performance and/or quality of completed and/or ongoing contracts. In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems, such as cost overruns, extended performance periods, numerous warranty calls, etc.

(c) The evaluation of PPI will take into account PPI regarding (i) predecessor companies, (ii) will take into account PPI regarding teaming partners, and/or (iii) will take into account PPI regarding subcontractors that will perform major aspects of the requirement when such information is relevant to this acquisition. Major aspects are identified in PWS paragraphs 1.1 through 1.3

(d) If a teaming arrangement is contemplated, provide complete information as to the arrangement, including any recent and relevant PPI on previous teaming arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past contracts of relevance.

(e) Subcontractor Consent. PPI pertaining to a subcontractor cannot be disclosed to the prime contractor without the subcontractor's consent. Provide with the quotation a letter from each subcontractor that will perform major or critical aspects of the requirement, consenting to the release of its past performance information to the prime contractor.

(3) Documents submitted in response to this RFQ must be consistent with the following:

(a) Requirements of the solicitation (CLINs) and Government standards.

(b) FAR 52.212-2, Evaluation - Commercial Items, of this solicitation.

(c) Submission for the quotation shall be as follows:

(i) Quoters shall submit electronic copies of quotation via e-mail or fax. By submitting an electronic copy, quoter assume allrisk of quotations not getting through security measures and firewalls. Only files created using Microsoft WORD, MicrosoftEXCEL, and/or Adobe.pdf files will be accepted. No zip files will be accepted. If submitting quotations electronically, email the file(s) by the solicitation closing date and time to the following email addresses and fax: reiko.kimura.2.jp@us.af.mil and namiko.kaneko.1.jp@us.af.mil or FAX 042-551-0973. The Government will confirm receipt of your submission via email reply.

(ii) The following table summarizes the quotation submission:

[Part] [Title] [Electronic Copy] [Paper Copy] [Page Limit] [Due Date]

I Summary and Misc Data 1 N/A N/A See Block 8 of SF 1449

II Price 1 N/A N/A See Block 8 of SF 1449

III Past Performance 1 N/A N/A See Block 8 of SF 1449

(End of Addenda)

Addendum to FAR 52.212-2, Evaluation - Commercial Items

The following is inserted as new paragraph (d) of the provision:

(d) Basis for Contract Award: This is a competitive lowest price with acceptable past performance award conducted in accordance with (IAW) Federal Acquisition Regulation (FAR) Parts 12 and 13. By submission of its quote IAW the instructions provided in clause FAR 52.212-1, Instructions to Offerors - Commercial Items, the quoter accedes to all solicitation requirements, including terms and conditions and representations and certification. Failure to meet a requirement may result in a quote being determined unacceptable. Award will be made to the lowest Total Evaluated

Price (TEP) quote that is lowest price with acceptable past performance. The evaluation process will include the following:

(1) Price: The Government will rank all quotes by TEP for Contract Line Item Number (CLIN) 0001, including all option prices (1001, 2001, 3001, 4001, 5001, 6001). CLINs 0002 and 0003 and their corresponding option CLINs will not be evaluated, but CLIN 0002 and its corresponding option CLINs will be examined for reasonableness for inclusion into the resulting contract, and offers including unreasonable rates may be excluded from consideration for award. The price evaluation will document the fairness and reasonableness of the TEP. The Government reserves the right to perform price realism analysis. If the Government elects to perform a price realism analysis, the Government reserves discretion over the method within which it performs its price realism analysis. If the Government elects to perform a price realism analysis and finds a proposal unrealistic, the Government may withhold award to that quoter.

Total Evaluated Price. A TEP will be computed for each quote in order to meet the requirements of FAR Parts 6 and 17. The price of a six-month extension authorized by FAR 52.217-8, Option to Extend Services, will be added to the proposed price for each potential contract performance period.

The TEP is a two-part computation. First, the quoter's total quoted price will be determined by multiplying the quantities identified in the Pricing Schedule (SF 1449, continuation of blocks 19 - 24) by the unit price, for

X001 CLIN to confirm the extended total amount for X001 CLIN; the sum of all extended amounts will be the quoter's total quoted price. Second, the total quoted price (total amount for CLINs X001) plus the sum of FAR 52.217-8 formula

(shown below) will constitute the TEP.

The formula for the Option to Extend Services amount is as follows:

Base Year = CLIN Extended Amount x 0.5*

Option Year 1 = CLIN Extended Amount x 0.5*

Option Year 2 = CLIN Extended Amount x 0.5*

Option Year 3 = CLIN Extended Amount x 0.5*

Option Year 4 = CLIN Extended Amount x 0.5*

Option Year 5 = CLIN Extended Amount x 0.5*

Option Year 6 = CLIN Extended Amount x 0.5*

Note: *0.5 is the multiplicative factor used to derive the 6 months quantity value.

Evaluating the Option CLINs does not obligate the Government to exercise the Options.

(2) Past Performance: The Government will evaluate past performance information (PPI) submitted from the lowest priced quoter under this acquisition. If the lowest priced quoter is determined to be Acceptable based on the below evaluation process, no other quoters need to be evaluated for past performance. In the event that the lowest quoter is determined to be

Unacceptable, the quoter will be eliminated from consideration for award and the Government will then evaluate the next low quoter's PPI. This process will continue until a quoter is found to have acceptable past performance.

Past performance evaluation considers each quoter's demonstrated recent and relevant record of performance in supplying products and services that meet the solicitation requirements as well as the quality assessment, based on contacting customers. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the quoter's Past Performance quote and any information obtained from other sources available to the

Government.

The Past Performance evaluation results in an assessment of the quoter's probability of meeting the solicitation requirements.

Quoters must receive a past performance rating of Acceptable to be eligible for award.

Recency Assessment. An assessment of the PPI will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past 3 years from the date of issuance of this solicitation. Ongoing contracts shall have completed at least six (6) months of performance by the solicitation release date in order to be considered for acceptability. PPI that fails this condition will not be evaluated.

Relevancy Assessment. The Government will conduct an evaluation of all recent PPI obtained to determine whether the products provided/services performed under those contracts relate to the products/services identified within the PWS.

A relevancy determination of the quoter's PPI will be made based upon the aforementioned considerations, including predecessor companies, teaming partner(s), and subcontractor(s). In determining the relevancy of effort performed under individual past performance contracts, the Government will only consider the specific effort or portion consistent with that proposed by the prime, teaming partner, or subcontractor. PPI pertaining to a subcontractor cannot be disclosed to the prime quoter without the subcontractor's consent. PPI forms and information obtained from other sources will be used to establish the relevancy of past performance. The Government will assess relevancy for each recent PPI using the following definitions in the below table.

TABLE 1: PAST PERFORMANCE RELEVANCY RATINGS

[Rating] [Definition]

Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Performance Quality Assessment. For each of the recent and relevant past performance information reviewed, the performance quality of work will be assessed based on the (i) Quality Assessment Criteria evaluated through using the comments from the contacted customers and (ii) the evaluation ratings in the Federal Past Performance Information Retrieval

System (PPIRS), if available. The Government will assess the quality of each recent and relevant PPI using the following quality descriptions in the below table.

TABLE 2: PAST PERFORMANCE QUALITY ASSESSMENT

[Quality Assessment] [Description]

Satisfactory (S) During the contract period, contractor performance is meeting (or met) contract requirements.

For any problems encountered, contractor took effective corrective action.

Unsatisfactory (U) During the contract period, contractor performance is not meeting (or did not meet) some contract requirements. For problems encountered, corrective action appeared only marginally effective, not effective, or not fully implemented. Customer involvement was required.

Not Available (N) Quality and/or performance information is not available.

Evaluation Ratings. As a result of the relevancy and performance quality assessments of the recent PPI evaluated, the

Government will assess an integrated past performance evaluation rating as described in the table below.

TABLE 3: PAST PERFORMANCE EVALUATION RATINGS

[Rating] [Definition]

Acceptable Based on the offeror's performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror's performance record is unknown.

(See note below.)

Unacceptable Based on the offeror's performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

Note: In the case of an offeror whose PPI is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance.

Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/ unacceptability, Unknown shall be considered Acceptable. More recent performance will have a greater impact on the Past Performance rating than less recent effort.

Quoters are cautioned to submit sufficient information and in the format specified in FAR 52.212-1 of this solicitation. The

Government intends to award a contract without further interchanges with quoters. Consequently, quoters are highly encouraged to quote their best quote in their initial submissions. However, the Government reserves the right to have interchanges with any or all quoters, if it is determined advantageous for the Government to do so.

This statement is not to be construed to mean that the Government is obligated to have interchanges with every quoter (note that FAR Part

15 procedures do not apply to FAR 13 procedures, therefore formal discussions are not applicable). A quoter may be eliminated from consideration without further interchanges if its quote is not among those considered most advantageous to the Government based on a best value determination.

IDCode:
Page: 1
Pages: 7
AmendNo: 0001
EffDate: 7/29/2019
ReqNo: F4G3B49123AW01
ProjNo:
IssCode: FA5209
AdmCode:
IssuedBy: FA5209 374 CONS LGC

UNIT 5228

APO AP 96328-5228

APO, AP 96328-5228

United States Reiko Kimura, Email: reiko.kimura.2.jp@us.af.mil Telephone: 225-6691

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA520919QA042
SolDate: 7/19/2019
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt:
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: Off
Require:
Copies:
Descript:

SEE CONTINUATION PAGE

ContNameTitle:
CoNameTitle: NAMIKO KANEKO, Contracting Officer

Email: namiko.kaneko.jp@us.af.mil Telephone: 225-5447

ContDate:
CODate:

File details come from the government source that posted it.