4._Atch_1_PWS_BLDG_4084_ROOF_REPAIR.pdf

PDF 159 KB Posted

Attached to
Repair Roof on Bldg 4084, Yokota Air Base, Japan
Solicitation number
FA5209-18-Q-0126
Issued by

About this file

Solicitation Attach #1: PWS

View the file

Other files

File Type Posted
Amend0001.pdf PDF
MFR_s_visit.pdf PDF
5._Atch_2._ROOF_PLANS.PDF PDF
7.OF-17.pdf PDF
1._Govt_Policy_Ltr.pdf PDF
3.Solicitation.docx DOCX document
2._Notice_to_Offerors.pdf PDF
6._Atch_3._PICTURE_OF_GUTTERS.JPG JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

TO

REPAIR ROOF ON BLDG 4084

YOKOTA AIR BASE, JAPAN

12 July 18

PERFORMANCE WORK STATEMENT

TO

REPAIR ROOF ON BLDG 4084

1. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, equipment, tools, and supervision, necessary to reattach the gutter to the flashing and seal the gap left behind 1.1.1 of this Performance Work Statement (PWS) in a safe, timely and professional manner in accordance with applicable Japanese Environmental Governing Standards (JEGS), Japanese laws, pertinent regulations and commercial standards and practices. The contractor shall accomplish all services below to meet the requirements of this PWS.

1.1.1 SCOPE OF WORK. The contractor shall remove the old caulking and prep the gutter for new water proof membrane. The contractor will secure the gutter to the flashing, to prevent sagging or leaking.

Once the gutter has been secured to the flashing the contractor shall close the gap between the gutter and flashing and seal it with a waterproof membrane.

1.1.2. LOCATIONS AND DESCRIPTIONS OF SERVICES.

LOCATION DESCRIPTIONS OF SERVICE

Building 4084 Remove old sealant and clean the surface

Secure gutter to the flashing to prevent the gutter from sagging and close gaps Install waterproof membrane to the gap in between the flashing and gutter to make a waterproof surface.

1.1.2. Work Schedule. The contractor shall establish a work schedule and submit it to the GR within fourteen (14) calendar days after contract award.

1.1.3. Materials/Parts. Descriptive data of all contractor-furnished materials/parts to be used under this contract shall be submitted for approval via a material submittal Form 3000. The data shall be supported by the manufacturer’s catalog cuts, product number, patent number, certificate of compliance, etc. to demonstrate equal or better quality of the original or genuine parts. Safety Data Sheets (SDS) in both English and Japanese shall be attached to AF Form 3000 for any chemicals and hazardous materials to be used as well.

1.1.4. Job-Site Cleaning. All debris generated from the contractor’s performance shall be removed and disposed of off-base by the end of each day.

1.1.5. Performance Period. The performance period of this project is 90 days after contract award.

1.2. GENERAL INFORMATION

1.2.1. Quality Control. The contractor shall ensure all services are performed in accordance with JEGS, Japanese laws, pertinent regulations and commercial standards and practices.

1.2.2. Quality Assurance. The GR will evaluate the contractor’s performance based on paragraph 1.1.1.

1.3.1. Hours of Operation.

1.3.1.1. Normal Hours. The Contractor shall perform the services required under this contract during the following hours: Monday through Friday, from 0730 to 1630.

1.3.1.2. Recognized Holidays. The Contractor is not required to provide normal service on the following days:

U.S. HOLIDAYS:

1 January New Year's Day 3rd Monday of January Martin Luther King, Jr.'s Birthday 3rd Monday of February Washington's Birthday Last Monday of May Memorial Day

4th July Independence Day 1st Monday of September Labor Day 2nd Monday of October Columbus Day

11th November Veterans Day 4th Thursday of November Thanksgiving Day

25th December Christmas Day

*Holidays falling on a Saturday will be observed on the preceding Friday. Holidays falling on a Sunday will be observed on the following Monday.

1.3.2. Base Passes. The contractor’s employees will be issued base passes (identification cards), which shall be carried by the individual bearers at all times while on Yokota Air Base and remote sites. The contractor shall submit written requests for issuance of base passes to the Contracting Officer (KO) and shall be responsible for all base passes issued to his/her employees. The contractor shall return all base passes to the Japanese Pass Section at Yokota Air Base upon termination of employment or completion of the contract. If Contractor requires access to restricted areas, contractor will be escorted at all times by authorized persons.

1.3.3. SPECIAL QUALIFICATIONS.

1.3.3.1. Business Permits and Licenses. The contractor shall possess any and all applicable business permits, certifications, and licenses to complete service in accordance with this PWS as required by Japanese Environmental Government Standards and Japanese laws. The contractor will ensure all documents are current. The contractor shall submit a copy of each of these documents to the KO within one week after contract award.

1.3.3.2. Project Manager (PM): The contractor shall provide a PM who shall be responsible for the performance of the work. The name of this person and his/her alternate(s) shall be designated in writing to the KO within ten (10) calendar days after contract award.

1.3.3.2.1. The PM or his/her alternate(s), upon notification, shall be available during normal duty hours within two (2) hours to meet on the installation with the GR to discuss problems.

1.3.3.2.2. The PM and his/her alternate(s) must be able to read, write, speak, and understand English, or provide a translator.

1.3.4. Contractor Employees. The contractor shall not employ persons for work on this contract, if he/she is identified to the contractor by the KO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

1.3.4.1. The contractor personnel shall present a neat appearance and be easily recognized. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee’s names. The contractor shall adhere to all base safety and traffic regulations and policies.

1.3.4.2. The Contractor shall not employ any person who is an employee of the US Government if employing that person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies of the Department of the Air Force.

1.3.4.3. The Contractor is cautioned that off duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours or deployment. Military Reservists and National Guard members may be subject to recall to active duty.

1.3.4.4. The abrupt absence of these personnel could adversely affect the Contractor’s ability to perform under this contract; however, their absence at any time shall not constitute an excuse for nonperformance under this contract.

2. GOVERNMENT FURNISHED SERVICES.

2.1. The Government will furnish water and electricity in existing facilities at no cost to the contractor for the sole purpose of accomplishment of this contract.

2.2. The Government will provide, for emergency purposes only, the following services:

a. Security Police Telephone 911 or 225-7227

b. Fire Protection Telephone 911

c. Hospital Emergency (Reimbursable expense) Telephone 911

Any time the contractor uses one of the above services, the Contractor shall immediately report to the GR with all of the details. The Contractor will be required to submit, in writing, within two (2) calendar days, the details surrounding the use of this service to the GR.

2.3. Damage. The contractor shall exercise care not to damage any facilities and grounds at Yokota Air Base and the remote sites. Any damages determined to have been caused by the contractor shall be repaired by the contractor at no expense to the Government.

2.4. Government Remedies. The KO shall follow FAR 52.212-4, Contract Terms and Conditions- Commercial Items, for the contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

2.5 APPENDICES

A. Roof Plans B. Pictures

REPAIR ROOF ON BLDG 4084
YOKOTA AIR BASE, JAPAN
12 July 18

File details come from the government source that posted it.