4. Exhibits: Pricing Schedule EXCEL version is available upon request.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibits to Solicitation No. FA520918Q0046

Exhibit Line Item No.

(ELIN)

Estimated Quantity Unit Unit Price Estimated Amount

A010

A01A One-way 50 EA ¥ ¥ 0

A01B Round-trip 8 EA ¥ ¥ 0

A020

A02A One-way 10 EA ¥ ¥ 0

A02B Round-trip 2 EA ¥ ¥ 0

ELINs A010 and A020 Est. Total Amount (A): ¥ 0

ELIN Estimated Quantity Unit Unit Price or

Percentage (%) Estimated Amount

A030 Additional Charges

A03A 8 1/2 hr ¥ ¥ 0

A03B 2% % [2] 0% [3] ¥ 0 Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

A03C 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

A03D 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

A03E 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

A03F 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

EXHIBITS: PRICING SCHEDULE

EXHIBIT A: BASE YEAR (12 months After Date of Contract from the Effective Date in Block 3 of Standard Form (SF) 1449)

Transport Engines between Yokota Air Base, Fussa-shi, Tokyo-to and Misawa Air Base, Hirahata 1-chome, Misawa-shi, Aomori-ken via express highways such as but are not limited to; Tohoku Expressway, Hachinohe Expressway Momoishi-doro, Daini Michinoku-doro, or vice versa (699 kms).

Transport Engines between Yokota Air Base, Fussa-shi, Tokyo-to and USMC Air Station, Iwakuni, Misumi-machi, Iwakuni-shi, Yamaguchi-ken via express highways such as but are not limited to; Chuo Expressway, Meishin Expressway, Chugoku Expressway, Sanyo Expressway, or vice versa (878 kms).

Midnight and Early Morning Charge for Table Rates.

Description

Description

Demurrage charge per 1/2 hour per truck when the truck is held beyond the free time.

(Distances are estimates only)

All Table Rates shall be increased by the percentage (%) for a shipment to/from Tohoku/Hokuriku-Shin'etsu Area during the winter period.

All Table Rates shall be increased by the percentage (%) for a shipment within Tohoku/Hokuriku-Shin'etsu Area during the winter period.

All Table Rates shall be increased by the percentage (%) for a shipment to/from Hokkaido Area during the winter period.

All Table Rates shall be increased by the percentage (%) for a shipment within Hokkaido Area during the winter period.

A03G 4 EA ¥ ¥ 0

A03H 2 EA ¥ ¥ 0

A03J 1 EA ¥ ¥ 0

A03K 1 EA ¥ ¥ 0

A03L 3 EA ¥ ¥ 0

A03M 1 EA ¥ ¥ 0

A03N 1 EA ¥ ¥ 0

A03P 5% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (5%) x [2] Offer Rate (%) = [3] Estimated Amount

A03Q 5% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (5%) x [2] Offer Rate (%) = [3] Estimated Amount

A03R 1 EA ¥ ¥ 0

A03S 1 EA ¥ ¥ 0

A03T 10% % [1] ¥ 0 [4] ¥ 0 Formula: Estimated Quantity (10%) x Offered [1] "Est. Total Amount under Table 1" = [4] Estimated Amount

A03U N/A N/A ¥ Actual Cost ¥ Actual Cost

ELIN A030 Est. Total Amount (B): ¥ 0

ELINs A010, A020, and A030 Est. Grand Total Amount (A) + (B): ¥ 0 (Insert the above Est. Grand Total Amount into Contract Line Item Number (CLIN) 0001 of Standard Form (SF) 1449)

Use of Toll Roads as directed by the Transportation Officer, except ELINs A010 and A020.

Cancellation charge per truck that is ordered to report to Misawa AB and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered to report to MCAS Iwakuni and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered to report to Yokota AB and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered to report to Misawa AB and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered to report to MCAS Iwakuni and the requirement is cancelled on the day of the performance.

Distance Table Rates

Cancellation charge per truck that is ordered using Distance Table Rates and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered using Distance Table Rates and the requirement is cancelled on the day of the performance.

Ferry Charge per Truck between Aomori-ko and Hakodate-ko (Round Trip) for orders using Distance Table Rates.

Ferry Charge per Truck between Hachinohe-ko and Tomakomai-ko (Round Trip) for orders using Distance Table Rates.

Additional charge when the requirement is rescheduled or postponed on the day of the performance for the next day.

Cancellation charge per truck that is ordered to report to Yokota AB and the requirement is cancelled on one day before the performance.

[1] Est. Total Amount by 1 each for all items under Table 1 (ELIN A03T): ¥ 0 (Insert above [1] Est. Total Amount under Table 1 into Unit Price of ELIN A03T)

Table 1 Distance Table Rate for ELIN A03T

One-Way per Truck (¥)Distance in Km

~ 10

Every 20 km Over 200 km Up to 500 km Every 50 km Over 500 km

ELIN Estimated Quantity Unit Unit Price Estimated Amount

B010

B01A One-way 50 EA ¥ ¥ 0

B01B Round-trip 8 EA ¥ ¥ 0

B020

B02A One-way 10 EA ¥ ¥ 0

B02B Round-trip 2 EA ¥ ¥ 0

ELINs B010 and B020 Est. Total Amount (A): ¥ 0

ELIN Estimated Quantity Unit Unit Price or

Percentage (%) Estimated Amount

B030 Additional Charges

B03A 8 1/2 hr ¥ ¥ 0

B03B 2% % [2] 0% [3] ¥ 0 Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

B03C 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

B03D 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

B03E 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

B03F 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

EXHIBIT B: OPTION ONE (For a period of 12 months subsequent to BASE YEAR completion)

Description

Transport Engines between Yokota Air Base, Fussa-shi, Tokyo-to and Misawa Air Base, Hirahata 1-chome, Misawa-shi, Aomori-ken via express highways such as but are not limited to; Tohoku Expressway, Hachinohe Expressway Momoishi-doro, Daini Michinoku-doro, or vice versa (699 kms).

Transport Engines between Yokota Air Base, Fussa-shi, Tokyo-to and USMC Air Station, Iwakuni, Misumi-machi, Iwakuni-shi, Yamaguchi-ken via express highways such as but are not limited to; Chuo Expressway, Meishin Expressway, Chugoku Expressway, Sanyo Expressway, or vice versa (878 kms).

Description

All Table Rates shall be increased by the percentage (%) for a shipment within Hokkaido Area during the winter period.

Demurrage charge per 1/2 hour per truck when the truck is held beyond the free time.

Midnight and Early Morning Charge for Table Rates.

All Table Rates shall be increased by the percentage (%) for a shipment to/from Tohoku/Hokuriku-Shin'etsu Area during the winter period.

All Table Rates shall be increased by the percentage (%) for a shipment within Tohoku/Hokuriku-Shin'etsu Area during the winter period.

All Table Rates shall be increased by the percentage (%) for a shipment to/from Hokkaido Area during the winter period.

B03G 4 EA ¥ ¥ 0

B03H 2 EA ¥ ¥ 0

B03J 1 EA ¥ ¥ 0

B03K 1 EA ¥ ¥ 0

B03L 3 EA ¥ ¥ 0

B03M 1 EA ¥ ¥ 0

B03N 1 EA ¥ ¥ 0

B03P 5% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (5%) x [2] Offer Rate (%) = [3] Estimated Amount

B03Q 5% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (5%) x [2] Offer Rate (%) = [3] Estimated Amount

B03R 1 EA ¥ ¥ 0

B03S 1 EA ¥ ¥ 0

B03T 10% % [1] ¥ 0 [4] ¥ 0 Formula: Estimated Quantity (10%) x Offered [1] "Est. Total Amount under Table 1" = [4] Estimated Amount

B03U N/A N/A ¥ Actual Cost ¥ Actual Cost

ELIN B030 Est. Total Amount (B): ¥ 0

ELINs B010, B020, and B030 Est. Grand Total Amount (A) + (B): ¥ 0 (Insert the above Est. Grand Total Amount into CLIN 1001 of SF 1449)

Additional charge when the requirement is rescheduled or postponed on the day of the performance for the next day.

Cancellation charge per truck that is ordered to report to Yokota AB and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered to report to Misawa AB and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered to report to MCAS Iwakuni and the requirement is cancelled on one day before the performance.

Ferry Charge per Truck between Aomori-ko and Hakodate-ko (Round Trip) for orders using Distance Table Rates.

Ferry Charge per Truck between Hachinohe-ko and Tomakomai-ko (Round Trip) for orders using Distance Table Rates.

Distance Table Rates

Use of Toll Roads as directed by the Transportation Officer, except ELINs B010 and B020.

Cancellation charge per truck that is ordered to report to Yokota AB and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered to report to Misawa AB and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered to report to MCAS Iwakuni and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered using Distance Table Rates and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered using Distance Table Rates and the requirement is cancelled on the day of the

[1] Est. Total Amount by 1 each for all items under Table 1 (ELIN B03T): ¥ 0 (Insert above [1] Est. Total Amount under Table 1 into Unit Price of ELIN B03T)

Table 1

Distance Table Rate for ELIN B03T

Distance in Km One-Way per Truck

~ 10

Every 20 km Over 200 km Up to 500 km Every 50 km Over 500 km

ELIN Estimated Quantity Unit Unit Price Estimated Amount

C010

C01A One-way 50 EA ¥ ¥ 0

C01B Round-trip 8 EA ¥ ¥ 0

C020

C02A One-way 10 EA ¥ ¥ 0

C02B Round-trip 2 EA ¥ ¥ 0

ELINs C010 and C020 Est. Total Amount (A): ¥ 0

ELIN Estimated Quantity Unit Unit Price or

Percentage (%) Estimated Amount

C030 Additional Charges

C03A 8 1/2 hr ¥ ¥ 0

C03B 2% % [2] 0% [3] ¥ 0 Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

C03C 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

C03D 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

C03E 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

C03F 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

All Table Rates shall be increased by the percentage (%) for a shipment within Hokkaido Area during the winter period.

Description

Transport Engines between Yokota Air Base, Fussa-shi, Tokyo-to and Misawa Air Base, Hirahata 1-chome, Misawa-shi, Aomori-ken via express highways such as but are not limited to; Tohoku Expressway, Hachinohe Expressway Momoishi-doro, Daini Michinoku-doro, or vice versa (699 kms).

Transport Engines between Yokota Air Base, Fussa-shi, Tokyo-to and USMC Air Station, Iwakuni, Misumi-machi, Iwakuni-shi, Yamaguchi-ken via express highways such as but are not limited to; Chuo Expressway, Meishin Expressway, Chugoku Expressway, Sanyo Expressway, or vice versa (878 kms).

Description

Demurrage charge per 1/2 hour per truck when the truck is held beyond the free time.

Midnight and Early Morning Charge for Table Rates.

All Table Rates shall be increased by the percentage (%) for a shipment to/from Tohoku/Hokuriku-Shin'etsu Area during the winter period.

All Table Rates shall be increased by the percentage (%) for a shipment within Tohoku/Hokuriku-Shin'etsu Area during the winter period.

All Table Rates shall be increased by the percentage (%) for a shipment to/from Hokkaido Area during the winter period.

EXHIBIT C: OPTION TWO (For a period of 12 months subsequent to OPTION ONE completion)

C03G 4 EA ¥ ¥ 0

C03H 2 EA ¥ ¥ 0

C03J 1 EA ¥ ¥ 0

C03K 1 EA ¥ ¥ 0

C03L 3 EA ¥ ¥ 0

C03M 1 EA ¥ ¥ 0

C03N 1 EA ¥ ¥ 0

C03P 5% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (5%) x [2] Offer Rate (%) = [3] Estimated Amount

C03Q 5% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (5%) x [2] Offer Rate (%) = [3] Estimated Amount

C03R 1 EA ¥ ¥ 0

C03S 1 EA ¥ ¥ 0

C03T 10% % [1] ¥ 0 [4] ¥ 0 Formula: Estimated Quantity (10%) x Offered [1] "Est. Total Amount under Table 1" = [4] Estimated Amount

C03U N/A N/A ¥ Actual Cost ¥ Actual Cost

ELIN C030 Est. Total Amount (B): ¥ 0

ELINs C010, C020, and C030 Est. Grand Total Amount (A) + (B): ¥ 0 (Insert the above Est. Grand Total Amount into CLIN 2001 of SF 1449)

Cancellation charge per truck that is ordered using Distance Table Rates and the requirement is cancelled on the day of the performance.

Ferry Charge per Truck between Aomori-ko and Hakodate-ko (Round Trip) for orders using Distance Table Rates.

Ferry Charge per Truck between Hachinohe-ko and Tomakomai-ko (Round Trip) for orders using Distance Table Rates.

Distance Table Rates

Use of Toll Roads as directed by the Transportation Officer, except ELINs C010 and C020.

Additional charge when the requirement is rescheduled or postponed on the day of the performance for the next day.

Cancellation charge per truck that is ordered to report to Yokota AB and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered to report to Misawa AB and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered to report to MCAS Iwakuni and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered to report to Yokota AB and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered to report to Misawa AB and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered to report to MCAS Iwakuni and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered using Distance Table Rates and the requirement is cancelled on one day before the performance.

[1] Est. Total Amount by 1 each for all items under Table 1 (ELIN C03T): ¥ 0 (Insert above [1] Est. Total Amount under Table 1 into Unit Price of ELIN C03T)

Every 20 km Over 200 km Up to 500 km Every 50 km Over 500 km

~ 10

Table 1 Distance Table Rate for ELIN C03T

Distance in Km One-Way per Truck

ELIN Estimated Quantity Unit Unit Price Estimated Amount

D010

D01A One-way 50 EA ¥ ¥ 0

D01B Round-trip 8 EA ¥ ¥ 0

D020

D02A One-way 10 EA ¥ ¥ 0

D02B Round-trip 2 EA ¥ ¥ 0

ELINs D010 and D020 Est. Total Amount (A): ¥ 0

ELIN Estimated Quantity Unit Unit Price or

Percentage (%) Estimated Amount

D030 Additional Charges

D03A 8 1/2 hr ¥ ¥ 0

D03B 2% % [2] 0% [3] ¥ 0 Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

D03C 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

D03D 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

D03E 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

D03F 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

Demurrage charge per 1/2 hour per truck when the truck is held beyond the free time.

Midnight and Early Morning Charge for Table Rates.

All Table Rates shall be increased by the percentage (%) for a shipment to/from Tohoku/Hokuriku-Shin'etsu Area during the winter period.

All Table Rates shall be increased by the percentage (%) for a shipment within Tohoku/Hokuriku-Shin'etsu Area during the winter period.

All Table Rates shall be increased by the percentage (%) for a shipment to/from Hokkaido Area during the winter period.

All Table Rates shall be increased by the percentage (%) for a shipment within Hokkaido Area during the winter period.

EXHIBIT D: OPTION THREE (For a period of 12 months subsequent to OPTION TWO completion)

Description

Transport Engines between Yokota Air Base, Fussa-shi, Tokyo-to and Misawa Air Base, Hirahata 1-chome, Misawa-shi, Aomori-ken via express highways such as but are not limited to; Tohoku Expressway, Hachinohe Expressway Momoishi-doro, Daini Michinoku-doro, or vice versa (699 kms).

Transport Engines between Yokota Air Base, Fussa-shi, Tokyo-to and USMC Air Station, Iwakuni, Misumi-machi, Iwakuni-shi, Yamaguchi-ken via express highways such as but are not limited to; Chuo Expressway, Meishin Expressway, Chugoku Expressway, Sanyo Expressway, or vice versa (878 kms).

Description

D03G 4 EA ¥ ¥ 0

D03H 2 EA ¥ ¥ 0

D03J 1 EA ¥ ¥ 0

D03K 1 EA ¥ ¥ 0

D03L 3 EA ¥ ¥ 0

D03M 1 EA ¥ ¥ 0

D03N 1 EA ¥ ¥ 0

D03P 5% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (5%) x [2] Offer Rate (%) = [3] Estimated Amount

D03Q 5% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (5%) x [2] Offer Rate (%) = [3] Estimated Amount

D03R 1 EA ¥ ¥ 0

D03S 1 EA ¥ ¥ 0

D03T 10% % [1] ¥ 0 [4] ¥ 0 Formula: Estimated Quantity (10%) x Offered [1] "Est. Total Amount under Table 1" = [4] Estimated Amount

D03U N/A N/A ¥ Actual Cost ¥ Actual Cost

ELIN D030 Est. Total Amount (B): ¥ 0

ELINs D010, D020, and D030 Est. Grand Total Amount (A) + (B): ¥ 0 (Insert the above Est. Grand Total Amount into CLIN 3001 of SF 1449)

Use of Toll Roads as directed by the Transportation Officer, except ELINs D010 and D020.

Cancellation charge per truck that is ordered to report to MCAS Iwakuni and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered to report to Yokota AB and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered to report to Misawa AB and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered to report to MCAS Iwakuni and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered using Distance Table Rates and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered using Distance Table Rates and the requirement is cancelled on the day of the performance.

Ferry Charge per Truck between Aomori-ko and Hakodate-ko (Round Trip) for orders using Distance Table Rates.

Ferry Charge per Truck between Hachinohe-ko and Tomakomai-ko (Round Trip) for orders using Distance Table Rates.

Distance Table Rates

Additional charge when the requirement is rescheduled or postponed on the day of the performance for the next day.

Cancellation charge per truck that is ordered to report to Yokota AB and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered to report to Misawa AB and the requirement is cancelled on one day before the

[1] Est. Total Amount by 1 each for all items under Table 1 (ELIN D03T): ¥ 0 (Insert above [1] Est. Total Amount under Table 1 into Unit Price of ELIN D03T)

Every 20 km Over 200 km Up to 500 km Every 50 km Over 500 km

Table 1 Distance Table Rate for ELIN D03T

Distance in Km One-Way per Truck

~ 10

ELIN Estimated Quantity Unit Unit Price Estimated Amount

E010

E01A One-way 50 EA ¥ ¥ 0

E01B Round-trip 8 EA ¥ ¥ 0

E020

E02A One-way 10 EA ¥ ¥ 0

E02B Round-trip 2 EA ¥ ¥ 0

ELINs E010 and E020 Est. Total Amount (A): ¥ 0

ELIN Estimated Quantity Unit Unit Price or

Percentage (%) Estimated Amount

E030 Additional Charges

E03A 8 1/2 hr ¥ ¥ 0

E03B 2% % [2] 0% [3] ¥ 0 Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

E03C 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

E03D 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

E03E 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

E03F 2% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (2%) x [2] Offer Rate (%) = [3] Estimated Amount

All Table Rates shall be increased by the percentage (%) for a shipment to/from Hokkaido Area during the winter period.

All Table Rates shall be increased by the percentage (%) for a shipment within Hokkaido Area during the winter period.

EXHIBIT E: OPTION FOUR (For a period of 12 months subsequent to OPTION THREE completion)

Description

Transport Engines between Yokota Air Base, Fussa-shi, Tokyo-to and Misawa Air Base, Hirahata 1-chome, Misawa-shi, Aomori-ken via express highways such as but are not limited to; Tohoku Expressway, Hachinohe Expressway Momoishi-doro, Daini Michinoku-doro, or vice versa (699 kms).

Transport Engines between Yokota Air Base, Fussa-shi, Tokyo-to and USMC Air Station, Iwakuni, Misumi-machi, Iwakuni-shi, Yamaguchi-ken via express highways such as but are not limited to; Chuo Expressway, Meishin Expressway, Chugoku Expressway, Sanyo Expressway, or vice versa (878 kms).

Description

Demurrage charge per 1/2 hour per truck when the truck is held beyond the free time.

Midnight and Early Morning Charge for Table Rates.

All Table Rates shall be increased by the percentage (%) for a shipment to/from Tohoku/Hokuriku-Shin'etsu Area during the winter period.

All Table Rates shall be increased by the percentage (%) for a shipment within Tohoku/Hokuriku-Shin'etsu Area during the winter period.

E03G 4 EA ¥ ¥ 0

E03H 2 EA ¥ ¥ 0

E03J 1 EA ¥ ¥ 0

E03K 1 EA ¥ ¥ 0

E03L 3 EA ¥ ¥ 0

E03M 1 EA ¥ ¥ 0

E03N 1 EA ¥ ¥ 0

E03P 5% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (5%) x [2] Offer Rate (%) = [3] Estimated Amount

E03Q 5% % [2] 0% [3] ¥ 0

Formula: Offered [1] "Est. Total Amount under Table 1" x Estimated Quantity (5%) x [2] Offer Rate (%) = [3] Estimated Amount

E03R 1 EA ¥ ¥ 0

E03S 1 EA ¥ ¥ 0

E03T 10% % [1] ¥ 0 [4] ¥ 0 Formula: Estimated Quantity (10%) x Offered [1] "Est. Total Amount under Table 1" = [4] Estimated Amount

E03U N/A N/A ¥ Actual Cost ¥ Actual Cost

ELIN E030 Est. Total Amount (B): ¥ 0

ELINs E010, E020, and E030 Est. Grand Total Amount (A) + (B): ¥ 0 (Insert the above Est. Grand Total Amount into CLIN 4001 of SF 1449)

Cancellation charge per truck that is ordered using Distance Table Rates and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered using Distance Table Rates and the requirement is cancelled on the day of the performance.

Ferry Charge per Truck between Aomori-ko and Hakodate-ko (Round Trip) for orders using Distance Table Rates.

Ferry Charge per Truck between Hachinohe-ko and Tomakomai-ko (Round Trip) for orders using Distance Table Rates.

Distance Table Rates

Use of Toll Roads as directed by the Transportation Officer, except ELINs E010 and E020.

Additional charge when the requirement is rescheduled or postponed on the day of the performance for the next day.

Cancellation charge per truck that is ordered to report to Yokota AB and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered to report to Misawa AB and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered to report to MCAS Iwakuni and the requirement is cancelled on one day before the performance.

Cancellation charge per truck that is ordered to report to Yokota AB and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered to report to Misawa AB and the requirement is cancelled on the day of the performance.

Cancellation charge per truck that is ordered to report to MCAS Iwakuni and the requirement is cancelled on the day of the

[1] Est. Total Amount by 1 each for all items under Table 1 (ELIN E03T): ¥ 0 (Insert above [1] Est. Total Amount under Table 1 into Unit Price of ELIN E03T)

Every 20 km Over 200 km Up to 500 km Every 50 km Over 500 km

~ 10

Table 1 Distance Table Rate for ELIN E03T

Distance in Km One-Way per Truck

Exhibits