Appendix B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS-Boiler_Inspection_28_Feb_17.pdf | ||
| Boiler_Amendment_1.pdf | ||
| 3._PWS-Boiler_Inspection_14_Feb_17.pdf | ||
| 2._RFQ_FA5209-17-T-0006.pdf | ||
| 1._Government_Policy.pdf | ||
| 4._Appendix_A._AF_FM_1222_(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BA BB BC BA BB BC BA BB BC BA BB BC BA BB BC BA BB BC BA BB BC
F PLANT
1 Takuma Co.,Ltd Water Tube NPO-250C Tokyo 128938 N-3075 NOV 2016 29,000 294.5 May-17 Jun-17 Jun-18 Jul-18 Jun-19 Jul-19 Jun-20 Jul-20 Jun-21 Jul-21 Jun-22 Jul-22 Jun-23 Jul-23
2 Takuma Co.,Ltd Water Tube NPO-250C Hyogo 22742 N-2978 MAY 2004 29,000 294.5 Aug-18 Aug-18 Aug-19 Aug-19 Aug-20 Aug-20 Aug-21 Aug-21 Aug-22 Aug-22 Aug-23 Aug-23
3 Takuma Co.,Ltd Water Tube NPO-250C Hyogo 23363 N-3062 NOV 2015 29,000 294.5 Jun-17 Jul-17 Sep-18 Sep-18 Sep-19 Sep-19 Sep-20 Sep-20 Sep-21 Sep-21 Sep-22 Sep-22 Sep-23 Sep-23
H PLANT
1 Takuma Co.,Ltd Fire Tube RE-100FⅡ Hyogo 22567 R-10055 MAY 2005 10,000 114.4 Jun-17 Jul-17 Jun-18 Jul-18 Jun-19 Jul-19 Jun-20 Jul-20 Jun-21 Jul-21 Jun-22 Jul-22 Jun-23 Jul-23
2 Takuma Co.,Ltd Fire Tube RE-100FⅡ Hyogo 22568 R-10056 MAY 2005 10,000 114.4 Aug-17 Aug-17 Aug-18 Aug-18 Aug-19 Aug-19 Aug-20 Aug-20 Aug-21 Aug-21 Aug-22 Aug-22 Aug-23 Aug-23
3 Takuma Co.,Ltd Fire Tube RE-100FⅡ Hyogo 22569 R-10057 MAY 2005 10,000 114.4 Sep-17 Sep-17 Sep-18 Sep-18 Sep-19 Sep-19 Sep-20 Sep-20 Sep-21 Sep-21 Sep-22 Sep-22 Sep-23 Sep-23
1 Takuma Co.,Ltd Water Tube NPO-200C Hyogo 23150 N-3015 JUL 2009 25,900 238.0 Aug-17 Sep-17 Jun-18 Jul-18 Aug-19 Aug-19 Aug-20 Sep-20 Jun-21 Jul-21 Aug-22 Aug-22 Aug-23 Sep-23
K PLANT
2 Takuma Co.,Ltd Water Tube NPO-200C Hyogo 23166 N-3021 JUL 2009 25,900 238.0 Sep-17 Sep-17 Aug-18 Aug-18 Jun-19 Jul-19 Sep-20 Sep-20 Aug-21 Aug-21 Jun-22 Jul-22 Sep-23 Sep-23
BLDG 4435 3 Takuma Co.,Ltd Water Tube NPO-200C Hyogo 23174 N-3022 JUL 2009 25,900 238.0 Jun-17 Aug-17 Sep-18 Sep-18 Sep-19 Sep-19 Jun-20 Aug-20 Sep-21 Sep-21 Sep-22 Sep-22 Jun-23 Aug-23
1 Takuma Co.,Ltd - - Hyogo 64266 0801 JUL 2009 - *¹ 5.64m³ Jun-18
*²(VA)
Jun-21
*²(VA)
2 Takuma Co.,Ltd - - Hyogo 64359 0802 JUL 2009 - *¹ 5.64m³ Jun-19
*²(VA)
Jun-22
*²(VA)
BLDG 4435 3 Takuma Co.,Ltd - - Hyogo 64373 0803 JUL 2009 - *¹ 5.64m³ Jun-17
*²(VA)
Jun-20
*²(VA)
Jun-23
*²(VA)
L PLANT 1 Takuma Co.,Ltd Water Tube NPO-80KN Hyogo 19686 N-2130 SEP 1975 8,000 99.4 Jun-17 Aug-17 Jul-18 Aug-18 Jul-19 Aug-19 Jun-20 Aug-20 Jul-21 Aug-21 Jul-22 Aug-22 Jun-23 Aug-23
BLDG 4096 2 Takuma Co.,Ltd Water Tube NPO-80KN Hyogo 19687 N-2131 SEP 1975 8,000 99.4 Sep-17 Sep-17 Sep-18 Sep-18 Sep-19 Sep-19 Sep-20 Sep-20 Sep-21 Sep-21 Sep-22 Sep-22 Sep-23 Sep-23
NOTE: *¹ Volume/Capacity *² VA= type VA inspection (UPV)
TYPES OF INSPECTIONS
Type BA: Internal and external inspection.
Type BB: Internal and external inspection followed or preceded by external inspection while boiler is under a hydrostatic test.
Type BC: Operational inspection while under steam pressure or filled with water. This inspection also includes verifying that safety devices perform as intended in accordance with ASME CSD-1 or NFPA 85, as applicable.
Type VA: Internal and external inspection (UPV).
ANNUAL BOILER INSPECTION SCHEDULES 2017-2023
TYPES OF INSPECTIONS TYPES OF INSPECTIONS TYPES OF INSPECTIONS
BLDG 9
N/A
SERIAL No. YEAR
INSTALLED
STEAM
OUTPUT
Kg/hr
HEATING
SURFACE
AREA (m²)
TYPES OF INSPECTIONS TYPES OF INSPECTIONSBoiler
/UPV
No
MANUFACTURE BOILER TYPE
Unfired Pressure
Vessel
TYPES OF INSPECTIONS
TYPES OF INSPECTIONS
BLDG 1245
MODEL VESSEL No.
2017 2018 2019 2020 2021
2017-2023