5._Appendix_B.__INSPECTION_SCHEDULE_2017-2023.pdf

PDF 105 KB Posted

Attached to
Boiler and Unfired Pressure Vessel Inspection at Yokota
Solicitation number
FA5209-17-T-0006
Issued by

About this file

Appendix B

View the file

Other files

File Type Posted
PWS-Boiler_Inspection_28_Feb_17.pdf PDF
Boiler_Amendment_1.pdf PDF
3._PWS-Boiler_Inspection_14_Feb_17.pdf PDF
2._RFQ_FA5209-17-T-0006.pdf PDF
1._Government_Policy.pdf PDF
4._Appendix_A._AF_FM_1222_(1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BA BB BC BA BB BC BA BB BC BA BB BC BA BB BC BA BB BC BA BB BC

F PLANT

1 Takuma Co.,Ltd Water Tube NPO-250C Tokyo 128938 N-3075 NOV 2016 29,000 294.5 May-17 Jun-17 Jun-18 Jul-18 Jun-19 Jul-19 Jun-20 Jul-20 Jun-21 Jul-21 Jun-22 Jul-22 Jun-23 Jul-23

2 Takuma Co.,Ltd Water Tube NPO-250C Hyogo 22742 N-2978 MAY 2004 29,000 294.5 Aug-18 Aug-18 Aug-19 Aug-19 Aug-20 Aug-20 Aug-21 Aug-21 Aug-22 Aug-22 Aug-23 Aug-23

3 Takuma Co.,Ltd Water Tube NPO-250C Hyogo 23363 N-3062 NOV 2015 29,000 294.5 Jun-17 Jul-17 Sep-18 Sep-18 Sep-19 Sep-19 Sep-20 Sep-20 Sep-21 Sep-21 Sep-22 Sep-22 Sep-23 Sep-23

H PLANT

1 Takuma Co.,Ltd Fire Tube RE-100FⅡ Hyogo 22567 R-10055 MAY 2005 10,000 114.4 Jun-17 Jul-17 Jun-18 Jul-18 Jun-19 Jul-19 Jun-20 Jul-20 Jun-21 Jul-21 Jun-22 Jul-22 Jun-23 Jul-23

2 Takuma Co.,Ltd Fire Tube RE-100FⅡ Hyogo 22568 R-10056 MAY 2005 10,000 114.4 Aug-17 Aug-17 Aug-18 Aug-18 Aug-19 Aug-19 Aug-20 Aug-20 Aug-21 Aug-21 Aug-22 Aug-22 Aug-23 Aug-23

3 Takuma Co.,Ltd Fire Tube RE-100FⅡ Hyogo 22569 R-10057 MAY 2005 10,000 114.4 Sep-17 Sep-17 Sep-18 Sep-18 Sep-19 Sep-19 Sep-20 Sep-20 Sep-21 Sep-21 Sep-22 Sep-22 Sep-23 Sep-23

1 Takuma Co.,Ltd Water Tube NPO-200C Hyogo 23150 N-3015 JUL 2009 25,900 238.0 Aug-17 Sep-17 Jun-18 Jul-18 Aug-19 Aug-19 Aug-20 Sep-20 Jun-21 Jul-21 Aug-22 Aug-22 Aug-23 Sep-23

K PLANT

2 Takuma Co.,Ltd Water Tube NPO-200C Hyogo 23166 N-3021 JUL 2009 25,900 238.0 Sep-17 Sep-17 Aug-18 Aug-18 Jun-19 Jul-19 Sep-20 Sep-20 Aug-21 Aug-21 Jun-22 Jul-22 Sep-23 Sep-23

BLDG 4435 3 Takuma Co.,Ltd Water Tube NPO-200C Hyogo 23174 N-3022 JUL 2009 25,900 238.0 Jun-17 Aug-17 Sep-18 Sep-18 Sep-19 Sep-19 Jun-20 Aug-20 Sep-21 Sep-21 Sep-22 Sep-22 Jun-23 Aug-23

1 Takuma Co.,Ltd - - Hyogo 64266 0801 JUL 2009 - *¹ 5.64m³ Jun-18

*²(VA)

Jun-21

*²(VA)

2 Takuma Co.,Ltd - - Hyogo 64359 0802 JUL 2009 - *¹ 5.64m³ Jun-19

*²(VA)

Jun-22

*²(VA)

BLDG 4435 3 Takuma Co.,Ltd - - Hyogo 64373 0803 JUL 2009 - *¹ 5.64m³ Jun-17

*²(VA)

Jun-20

*²(VA)

Jun-23

*²(VA)

L PLANT 1 Takuma Co.,Ltd Water Tube NPO-80KN Hyogo 19686 N-2130 SEP 1975 8,000 99.4 Jun-17 Aug-17 Jul-18 Aug-18 Jul-19 Aug-19 Jun-20 Aug-20 Jul-21 Aug-21 Jul-22 Aug-22 Jun-23 Aug-23

BLDG 4096 2 Takuma Co.,Ltd Water Tube NPO-80KN Hyogo 19687 N-2131 SEP 1975 8,000 99.4 Sep-17 Sep-17 Sep-18 Sep-18 Sep-19 Sep-19 Sep-20 Sep-20 Sep-21 Sep-21 Sep-22 Sep-22 Sep-23 Sep-23

NOTE: *¹ Volume/Capacity *² VA= type VA inspection (UPV)

TYPES OF INSPECTIONS

Type BA: Internal and external inspection.

Type BB: Internal and external inspection followed or preceded by external inspection while boiler is under a hydrostatic test.

Type BC: Operational inspection while under steam pressure or filled with water. This inspection also includes verifying that safety devices perform as intended in accordance with ASME CSD-1 or NFPA 85, as applicable.

Type VA: Internal and external inspection (UPV).

ANNUAL BOILER INSPECTION SCHEDULES 2017-2023

TYPES OF INSPECTIONS TYPES OF INSPECTIONS TYPES OF INSPECTIONS

BLDG 9

N/A

SERIAL No. YEAR

INSTALLED

STEAM

OUTPUT

Kg/hr

HEATING

SURFACE

AREA (m²)

TYPES OF INSPECTIONS TYPES OF INSPECTIONSBoiler

/UPV

No

MANUFACTURE BOILER TYPE

Unfired Pressure

Vessel

TYPES OF INSPECTIONS

TYPES OF INSPECTIONS

BLDG 1245

MODEL VESSEL No.

2017 2018 2019 2020 2021

2017-2023