J A.pdf

PDF 317 KB Posted

Attached to
ITC-PAC R&D "Solar Fuel" Federal contract opportunity
Solicitation number
FA520916R0017a
Issued by
Department of the Air Force Pacific Air Forces

About this file

Justification and Approval (J A) for Other Than Full and Open Competition

View the file

Other files for this federal contract opportunity

Other files attached to ITC-PAC R&D "Solar Fuel", newest first.
File Type Posted
SOW_SNU_doped_graphene_20160902_Final-REDACTED.pdf PDF
FA520916R0017_FBO.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Justification and Approval (J&A) for Other Than Full and Open Competition

FOR OFFICIAL USE ONLY NOT APPLICABLE AFTER AWARD

FOR OFFICIAL USE ONLY NOT APPLICABLE AFTER AWARDUpdated: 15 Mar 16

I. Contracting Activity.

U.S. Army International Technology Center Pacific (ITC-PAC) is the requiring activity. 374th CONS/ LGCZ is the contracting activity. Document number W90GQZ-61240032 for Research and Development Project “Solar Fuel”.

II. Nature and/or description of the action being processed.

This determination provides the rationale for contracting by other than full and open competition for research and development project “Solar Fuel”. This action is to be a new, firm-fixed-price contract with

, . Performance period shall start on .

III. Description of supplies/services required to meet agency needs.

This requirement is to provide financing in support of the research project titled “Solar Fuel” led by Dr.

The project is to characterize and optimize a new photo-catalyst structure of for hydrogen production from water and subsequent hydrocarbon synthesis. Such catalysts are expected to be more efficient and lower cost than current platinum-based photocatalysts.

all need to be characterized and optimized for transition. The research proposed is complex with numerous unknowns that need to be determined by experiment. Therefore the project comprises three, 1-year periods.

The main tasks of this project include the following milestones.

Basic Period:

1. Milestone 1: by optimizing the deposition process.

2. Milestone 2: Characterize relationship to catalytic performance.

Option 1 Period:

1. Milestone 1: Investigate various catalyst support structures, including

2. Milestone 2: Optimize .

Option 2 Period:

1. Milestone 1: Optimized deposition process.

FOR OFFICIAL USE ONLY NOT APPLICABLE AFTER AWARD

FOR OFFICIAL USE ONLY NOT APPLICABLE AFTER AWARDUpdated: 15 Mar 16

2. Milestone 2: Investigate and characterize catalytic process for hydrogen and carbon dioxide reactions.

This acquisition will be a firm-fixed price purchase order in the amount of for the basic period of one year, with two additional option years (Option Period I and Option Period II) also in the amount of per year for a total cost of .

IV. Statutory authority permitting Other than Full and Open Competition.

10 USC 2304 (c) (1) as implemented by FAR 6.302-1, as “Only One Responsible Source.”

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).

In evaluating the content of the Research and Development Program it has been determined that the research and development project will focus specifically on attainable means by which investigators from the Pacific Rim and the U.S. military research institutions may maximize collaborative effort in addressing the scientific challenges inherent in the topic.

Our endorsement and support for this project will help to attract attention to ITC-PAC's presence (and for our outreach objectives) as well as to demonstrate the interest.

ITC-PAC Director of Material Science, Dr. , found this project while searching areas of expertise for potential sources of basic research. He searched for all sources that they identified as technically capable and promising. He found that the primary/lead organization for this project is Dr.

, who is considered a leading research scientist in the area of such methods. is the only source expressing interest in developing on this research and development project and the only source with both the ideas and expertise.

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

The ITC-PAC Director reviewed this research and development proposal and requests a contract with the primary/lead organization. ITC-PAC found the primary/lead organization of this technology is

. Technical literature was reviewed and no other sources were identified. Further, consolation with experts at Army Research Lab also concurred that the expertise and knowledge of the proposed contractor is uniquely suited for this project.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

This fund is for research and development project titled “Solar Fuel”. Because this project will feature the

FOR OFFICIAL USE ONLY NOT APPLICABLE AFTER AWARD

FOR OFFICIAL USE ONLY NOT APPLICABLE AFTER AWARDUpdated: 15 Mar 16

Travel for 1 trip for 1 person for 2 weeks between and the . This cost is comparable to similar travel of government employees booked in DTS.

• Overhead Cost is for standard overhead on research funds:

7.2 of other costs: . Overhead at Universities is typically higher, so is a significant discount.

The Government will receive deliverables such as:

• Project Proposal

• Project Interim Report

• Project Final Report

• Project Financial Report

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

ITC-PAC Director of Material Science, Dr. , identified this project while reviewing current research in the region. has great experience with the technique at the center of this project necessary to conduct the experiments. Therefore, they are uniquely suited to perform this work. This research was the only direct source associated with a completed collaboration effort among ITC-PAC, NSRDEC, and Chemicals and Pharmaceuticals in the area of .

IX. Any other facts supporting the use of Other Than Full and Open Competition.

N/A.

X. List of sources, if any, that expressed interest in the acquisition.

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

N/A.

FOR OFFICIAL USE ONLY NOT APPLICABLE AFTER AWARD

FOR OFFICIAL USE ONLY NOT APPLICABLE AFTER AWARDUpdated: 15 Mar 16

XII. Certification by the Contracting Officer.

As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.

XIII. Certification by the technical/requirements personnel.

As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.