WRFD 10-5004.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE SCHEDULE
POC: Mr. Sato at DSN 225-7619
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Dec-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5209-16-B-0002
X 9B. DATED (SEE ITEM 11)
06-Nov-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Dec-2015
CODE
374TH CONTRACTING SQUADRON
UNIT 5228, BLDG 620, YOKOTA AB
FUSSA-SHI, TOKYO 197-0001 JAPAN
FA5209 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5209-16-B-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
Changes in SECTION A - SOLICITATION/CONTRACT FORM The required response date/time has changed from 07-Dec-2015 02:00 PM to 09-Dec-2015
02:00 PM.
Changes in SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENT
NUMBER
TITLE
1 Contract Specifications for Project No. WRFD 10-5004, Repair Poles and Netting, Tama Golf Course, Japan, revised on 4 Dec 15
2 Contract Drawings for Project No. WRFD 10-5004, Repair Poles and Netting, Tama
Golf Course, Japan as listed below:
Sheet No. Ref No Title Date 1 of 33 T-1 Index of Drawings, Vicinity and Location Plan 2 Jul 15 2 of 33 C-1 #18 Demolition Plan 27 Nov 15 3 of 33 C-2 #18 New Site Plan 2 Jul 15 4 of 33 C-3 #18 Hole New Elevation 2 Jul 15 5 of 33 C-4 #18 Hole New Column Elevation 3 Dec 15 6 of 33 C-5 #18 Hole New Detail “A” 2 Jul 15 7 of 33 C-6 #18 Hole New Detail “B” 2 Jul 15 8 of 33 C-7 #18 Hole Evevation, Section and New Net installation Detail 2 Jul 15
9 of 33 C-8 #18 Hole Temporary Work Plan 27 Nov 15 10 of 33 C-9 #18 Hole Site Recovering Plan 2 Jul 15 11 of 33 C-10 Driving Range Demolition Plan 2 Jul 15 12 of 33 C-11 Driving Range New Site Plan 2 Jul 15 13 of 33 C-12 Driving Range New Elevation 2 Jul 15 14 of 33 C-13 Driving Range New Column Elevation 3 Dec 15 15 of 33 C-14 Driving Range New Detail 2 Jul 15 16 of 33 C-15 Driving Range New Detail “B” 2 Jul 15 17 of 33 C-16 Driving Range Evevation, Section and new Net installation Detail 2 Jul 15
18 of 33 C-17 Driving Range Temporary Work Plan - 1 2 Jul 15 19 of 33 C-18 Driving Range Temporary Work Plan – 2 2 Jul 15 20 of 33 C-19 Temporary Access Road Plan – 1 2 Jul 15 21 of 33 C-20 Access Road Plan – 2 2 Jul 15
FA5209-16-B-0002
22 of 33 C-21 Temporary Construction Plan 2 Jul 15 23 of 33 C-22 Temporary Construction Plan 2 Jul 15 24 of 33 E-01 Electrical Distribution Plan 2 Jul 15 25 of 33 E-02 #18 Hole Enlarged New Electrical Distribution Plan 2 Jul 15 26 of 33 E-03 Driving Range Enlarged New Electrical Distribution
Plan 2 Jul 15
27 of 33 E-04 Enlarged Distribution Plan, Elevations and Section 2 Jul 15 28 of 33 E-05 One Line Diagram 2 Jul 15 29 of 33 E-06 One Line Diagrams-1 #18 Hole Area 2 Jul 15 30 of 33 E-07 One Line Diagrams-2 Driving Rang Area 2 Jul 15 31 of 33 E-08 Details 2 Jul 15 32 of 33 E-09 Equipment Detail 2 Jul 15 33 of 33 E-10 Equipment Details 27 Nov 15
(End of Summary of Changes)