Atch_Amend0001-Exhibit_Revised-150527.pdf
PDF 227 KB Posted
- Solicitation number
- FA5209-15-R-0014
About this file
Revised Exhibits-Pricing Schedule (NOTE Excel Version is available upon request.)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Precon_Minutes_15R0014__2015_06_03.pdf | ||
| 0-2.OF_17-Rev.pdf | ||
| FA5209-15-R-0014-0001.pdf | ||
| 5.Cover_letter-PPQ.pdf | ||
| 4.Atch1_PWS.pdf | ||
| 8.OF_17.pdf | ||
| 7.Atch3_RefList.pdf | ||
| 3.Exhibits.pdf | ||
| 0_NTO.pdf | ||
| 6.Atch2-PPISurvey.pdf | ||
| 2.SF1449_FA520915R0014.pdf | ||
| 1.Goverment_Policy_Ltr.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised Exhibits to Solicitation No. FA5209-15-R-0014 Amendment 0001
(NCWT: Net hundredweight)
EXHIBITS
PRICING SCHEDULE
I. ESTIMATED QUANTITIES
The quantities shown by area of performance for each item in this Solicitation are the Government’s estimates of requirements, which may be ordered during the period of the contract.
The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local holidays are listed below by area of performance within each schedule. Offerors must complete the “Offeror’s Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum acceptable daily capability, for all items within an area of performance for which they submit bids. Failure to do so will render the bid non responsive.
Government's Government's Offeror's
Estimated Maximum Minimum Acceptable Guaranteed Daily
Base Daily Requirement Daily Capability Capability (Unit: NCWT) (Unit: NCWT) (Unit: NCWT)
ZAMA
ZAMA 260 135
YOKOSUKA 1200 700
II. CONTRACTOR'S FACILITY
The Contractor's facility to be used in the performance of this contract for and in accordance with paragraph 10, Facilities, Part I of PWS shall be as identified below. The Contractor's facility shall have the size of storing a minimum of 50 containers specified at Item A010 and the corresponding items for options.
Base Location of the warehouse(s)
Approximate square footage (sq-ft) in each warehouse available for assembling, packing, and storage under this contract
III. CONTRACT AREAS OF PERFORMANCE
(a) The Government will consider all areas of performance described in paragraph (b) as including the Contractor's facility, regardless of geographical location.
(b) The Contractor shall perform services within the following defined areas of performance, which include terminals identified therein: Area within a radius of (XX) kilometers from the main gate of the Government installation (see the list below.)
Base Area within a radius of (XX) km From Drayage Beyond the Contract Areas of
Performance (Not-To-Exceed (NTE) XX km)
ZAMA 50 km Main Gate NTE 600 km
YOKOSUKA
100 km
Main Gate NTE 600 km (include on-base ATSUGI)
BASE YEAR (12 months After Date of Contract (ADC) )
Item A002. Outbound (HHGs From Non-Temporary Storage): No requirement.
IV. SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE I
OUTBOUND SERVICES (Items A001 through A014)
Item A001. Complete Service - Outbound (HHG): Services must include pre-move survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container ASTM-D4169-01, SDDC Pamphlet 55-12) at member's/employee's residence, or at Government-furnished facility when ordered by the ordering officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on line-haul carrier’s equipment at the Government-furnished or contractor-furnished facility. When containers will not accommodate all articles of any one lot, loose articled must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize and other shipments must be paid for under Item A003.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
At member/employee Residence: Container, ASTM-D4169-01, or SDDC Pamphlet 55-12
AB.
100 290
At Government-furnished facility or Contractor’s facility: Container, ASTM- D4169-01, or SDDC Pamphlet 55-12
AA.
1,800 13,500
Estimated Unit Price
Total
Annual Annual
Quantity Quantity (Unit: NCWT) (Unit: NCWT)
Item A003. Complete Service-Outbound (HHG-Overflow Articles and HHGs Shipments requiring other than ASTM- D4169-01 or SDDC Pamphlet 55-12): Service must be the same as Item A001 or Item A002 except that the loose articles are drayed to Government-furnished or contractor-furnished facility when ordered by the ordering officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in ASTM-D4169-01 or SDDC Pamphlet 55-12. Overflow containers are of a lesser size than specified in ASTM- D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in ASTM-D4169-01 or SDDC Pam 55-12. One or more of these containers may be required per shipment.
AA.
No requirement 125Government-Furnished Containers:
Overseas Pack: Overflow Articles
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Item
ZAMA YOKOSUKA
Estimated Unit Price
Total
Estimated Unit Price
Total
AD.
No requirement No requirementGovernment-Furnished Containers:
Domestic Pack: Overflow Articles
AE.
No requirement No requirementGovernment-Furnished Containers:
Domestic Pack: Oversize Articles
AC.
No requirement 60Government-Furnished Containers:
Overseas Pack: Other Shipments
AB.
No requirement 167Government-Furnished Containers:
Overseas Pack: Oversize Articles
(to be drayed to DLA
Yokosuka)
(at member/ employee's residence)
5 5 (to be drayed to Camp Zama warehouse)
AF.
No requirement No requirementGovernment-Furnished Containers:
Domestic Pack: Other Shipments
AG.
Contractor-Furnished Containers:
Overseas Pack: Overflow Articles
15 200
(to DDYJ) (at member/ employee’s)
5 6
(at Gov’t-furnished facility)
AH.
Contractor-Furnished Containers:
Overseas Pack: Oversize Articles
10 350
(to Zama) (at Gov’t’s)
AK.
No requirement No requirementContractor-Furnished Containers:
Domestic Pack: Overflow Articles
AL.
No requirement No requirementContractor-Furnished Containers:
Domestic Pack: Oversize Articles
(to DDYJ) (at member/ employee’s)
2 12 (to Zama)
AJ.
Overseas Pack: Other Shipments
18 120
(at Gov’t’s)
AM.
No requirement No requirementContractor-Furnished Containers:
Domestic Pack: Other Shipments
AA.
No requirement 1Government-Furnished Containers:
Drayage Included
Total
Estimated Unit Price
Total
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Item A004. Complete Service - Outbound (Unaccompanied Baggage (UB)): Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the line-haul carrier’s equipment. Service must be performed at member's/employee’s residence. (Service may be performed at Government-furnished facility or contractor-furnished facility when ordered by the Ordering Officer.)
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Contractor-Furnished Containers:
Drayage Included
AD.
No requirement 350Contractor-Furnished Containers:
Drayage Not Included
AC.
30 220
AB.
No requirement 1Government-Furnished Containers:
Drayage Not Included
AE.
No requirement 5
Shipboard Pack outs
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
AE. Shipboard Pack outs: When outbound services under items A001, A003 and A004 are ordered for performance at the member’s/employee’s residence located on an ocean vessel, the contractor must pick up goods outside fence perimeter. (Due to contractor’s personnel liability and safety, and for security reasons.)
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Item A005. Complete Service-Outbound (UB from Non-temporary Storage): No requirement.
Item A006. Outbound Service-UB Packed By Member/Employee: No requirement.
Item A007. Outbound Service-UB Packed By Member/Employee-Consolidated Shipments/Government Facility: No requirement.
Item A008. Expensive and Valuable Items: No requirement.
Item A009. Storage: Storage of containerized articles must be furnished when ordered by the ordering officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt or notification of completion of containerization service. Storage charges apply for 30-days period or fraction thereof. For Date of release from storage must not be considered in computation of storage charges. Charges are based on actual net weight of shipment (HHG or UB).
Storage 150 No requirement
Item A010. Containers: Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading.
*When a specific container from the SDDC Pam. 55-12 is ordered, the order will indicate the appropriate SDDC approval number.
Total
Estimated Unit Price
Total
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Annual Annual Quantity Quantity
AA.
No requirement No requirement
Container (ASTM-D4169-01)
(ea: each / cu ft: cubic feet)
Item
ZAMA YOKOSUKA
Estimated Unit
Price
Total
Estimated Unit Price
Total
Item A011. Remarking, Coopering and Assembly/Disassembly Service:
AA. Remarking of Shipments for Re-consignment: Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for re-consignment, and loading on the hauling carrier’s vehicle.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Crate
(ASTM-D6039/D6039M-02)
100 1,000
Container (SDDC Pamphlet 55-12)* 250 650 AC. (Unit: cu ft or fraction thereof)
(Unit: cu ft or fraction thereof)
AB. (Unit: ea) (Unit: ea)
Remarking
AB. Coopering: Services must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nail and bands shall be accomplished at no expense to the Government.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
AA.
15 30
Total
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
AB.
No requirement 1
Coopering
Unit Price
Total
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
AC & AD. Assembly/Disassembly of Government-Owned Containers: Contractor will assemble Government-owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
AD.
No requirement 1
Disassembly
AC.
No requirement 1
Assembly
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
Contract Area of Performance within a radius of 50 km within a radius of 100 km Not-to-exceed ~ a radius of 600 km a radius of 600 km
Annual Annual Quantity Quantity (Unit: per loaded 10km) (Unit: per loaded 10km)
Item A012. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Item A013. Attempted Pickup: When the initial attempt to pickup a shipment at the member's/employee's residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after Contractor’s notification, the ordering officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member's/employee at the residence within one hour after notification, and (c) the Contractor left a notice of attempted pickup at the residence.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
HHG
AB.
5 1
UB
AA.
5 1
HHG
AB.
3 1
UB
AA.
3 1
Annual Annual Quantity Quantity
(Unit:
ea shpmt)
(Unit:
ea shpmt)
Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).
Unit Price
Total
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
Item A014. Additional Services: The Contractor must provide additional services not included above, but required for satisfactory completion of the services ordered under this contract.
AA & AB. Moving and Placing Pianos or Organs: When moving and placing pianos or organs are involved for outbound services under Item A001, the Contractor shall be paid the unit price listed hereunder in addition to the rate of Item A001.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
AC. When the piano or organ is to be moved from the second floor or above, the following rate shall be added to the rate under Item A014AA or A014AB for each floor covered. However, this additional rate does not apply when a building elevator is available.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Grand Piano
AB.
5 5 Upright Piano or Organ
AA.
3 1
Estimated Unit Price
Total
Annual Annual Quantity Quantity (Unit: per service)
(Unit: per service)
Second floor or above
AD. Services Performed by Third Party: Third party services as specified in PWS PART I, paragraph A.6.
Note: The contractor must bill the Government for the requested/required third party services as a separate charge on the invoice supported by two (2) copies of the paid receipt/invoice from the third party.
(*TBD: To Be Determined)
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
AC
2 1
Unit Price
Total
Annual Annual Quantity Quantity (Unit: per pick-up)
(Unit: per pick-up)
Indefinite Third Party
AE & AF. Additional Pickup: In conjunction with Item A001, A003, and A004, add a rate for one (1) additional pickup point for one (1) shipment within the performance area.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
AD.
2 *TBD Indefinite 1 TBD
HHG
AF.
3 1
UB
AE.
3 1
b. c.
AG. Crane: Items of unusual heavy furniture. Except pianos and organs, may require service by a third party which is arranged by the contractor with the authorization of the ordering officer.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Indefinite Crane
AH. Overtime: Rates at Item A001, A002 and A003 shall be increased by the following percentage (%) for services ordered to be accomplished during other than regular working hours (PWS PART, I para. A.3.b.)
Item
ZAMA YOKOSUKA
Estimated
Rate
Total
Estimated
AG.
2 TBD Indefinite 1 TBD
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
14,835 0.13%
AH.
No requirement a. 20 %
Rate
Total
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
SUB TOTAL OF SCHEDULE I (OUTBOUND) OF BASE YEAR
Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).
AREA TOTAL
ZAMA
YOKOSUKA
d.
Overtime
(a) Estimated Annual Quantity 20 = (c) 0.13% of (b) Total Estimated Quantity of A001, A002 and A003
(d) Extended Amount for Overtime = Total Extended Amount for "A001, A002 and A003" x Estimated Annual Qty (0.13%) x Rate (%)
RECAPITULATION SCHEDULE I
SCHEDULE II
INBOUND SERVICES (Items A015 through A030)
Item A015. Complete Service - Inbound (HHGs): Service must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers to government-furnished or contractor-furnished facility and return, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, drayage to member's/employee's residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, un-servicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates and debris from member's/employee's residence and drayage of empty containers to Government facility or Contractor’s facility.
Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Complete Service – Inbound (HHGs) 1,120 8,100
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Annual
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Item A020. Complete Service - Inbound (UB): Service must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers to Government-furnished or contractor-furnished facility, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, drayage of UB containers to member's/employee's residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Item A016. Complete Service - Inbound (HHG): No requirement.
Item A017. Complete Service - Inbound (HHG): No requirement.
Item A018. Inbound Service-Contractor Facility (HHG): No requirement.
Item A019. Complete Service – Expensive and Valuable Items: No requirement.
Item A021. Complete Service - Inbound (Unaccompanied Baggage): No requirement.
Item A022. Inbound Service – Contractor Facility (Unaccompanied Baggage): No requirement.
Item A023. Storage: Storage of containerized articles must be furnished when ordered by the ordering officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt or notification of arrival of shipment. Storage charges apply for 30-days period or fraction thereof. Date of release from storage must not be considered in computation of storage charges. Charges are based on actual net weight of shipment (HHG or UB).
Complete Service – Inbound (UB)
62 250
Estimated Unit Price
Total
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
AA. Remarking of Shipment for Re-consignment: Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to Government-furnished or contractor-furnished facility, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for re-consignment loading on the hauling carrier’s vehicle.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Storage 50 No requirement
Item A024. Remarking, Coopering, and Assembly/Disassembly Service:
AB.
No requirement 1
Coopering
Unit Price
Total
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
Remarking
AB. Coopering: Services must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nail and bands shall be accomplished at no expense to the Government.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
AA.
15 1
AC.
No requirement 5
Assembly
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
AC & AD. Assembly/Disassembly of Government-Owned Containers: Contractor will assemble Government-owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
AD.
No requirement 5
Disassembly
Annual Annual Quantity Quantity
(Unit:
ea shpmt)
(Unit:
ea shpmt)
Item A025. Attempted Delivery: When the initial attempt to deliver a shipment at the member's/employee's residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after Contractor’s notification, the ordering officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the Contractor left a notice of attempted delivery at the residence.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Item A026. Reweighing: Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
HHG
AB.
3 2
UB
AA.
3 2
HHG
AB.
5 1
UB
AA.
2 1
Annual Annual Quantity Quantity
(Unit:
ea shpmt)
(Unit:
ea shpmt)
Contract Area of Performance within a radius of 50 km within a radius of 100 km Not-to-exceed ~ a radius of 600 km a radius of 600 km
Annual Annual Quantity Quantity (Unit: per loaded 10km) (Unit: per loaded 10km)
Item A027. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
HHG
AB.
5 1
UB
AA.
5 1
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Item A028. Partial Withdrawal: Service must be the same as Item A015 or A020, except a partial removal of the items from the outer container will be performed at the Government-furnished or contractor-furnished facility. Articles not removed from the shipment will remain at the Government-furnished or contractor-furnished facility.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
AC.
No requirement No requirement
UB Drayage Included
AD.
No requirement No requirement UB Drayage Not Included
HHG Drayage Included
AB.
No requirement 25 HHG Drayage Not Included
AA.
3 10
Unit Price
Total
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).
Item A029. Additional Services: The Contractor must provide additional services not included above, but required for satisfactory completion of the services ordered under this contract.
AA & AB. Moving and Placing Pianos or Organs: When moving and placing pianos or organs are involved for inbound services under Item A015, the Contractor shall be paid the unit price listed hereunder in addition to the rate of Item A015.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
AC. When the piano or organ is to be moved on the second floor or above, the following rate shall be added to the rate under Item A029AA or A029AB for each floor covered. However, this additional rate does not apply when a building elevator is available.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Grand Piano
AB.
2 4 Upright Piano or Organ
AA.
2 1
Second floor or above
AC.
2 1
Unit Price
Total
Annual Annual Quantity Quantity (Unit: per service)
(Unit: per service)
AD. Services Performed by Third Party: Third party services as specified in PWS PART I, paragraph A.6.
Note: The contractor must bill the Government for the requested/required third party services as a separate charge on the invoice supported by two (2) copies of the paid receipt/invoice from the third party.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
Unit Price
Total
Annual Annual Quantity Quantity (Unit: per pick-up)
(Unit: per pick-up)
Indefinite Third Party
AE & AF. Additional Delivery: In conjunction with Item A015, add a rate for one (1) additional delivery point for one (1) shipment within the performance area.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
AD.
2 TBD Indefinite 1 TBD
AG. Crane: Items of unusual heavy furniture. Except pianos and organs, may require service by a third party which is arranged by the contractor with the authorization of the ordering officer.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
HHG
AF.
3 1
UB
AE.
5 1
Indefinite Crane
AH. Customs Clearance: The Contractor will clear customs when shipments become frustrated.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
AG.
1 TBD Indefinite 1 TBD
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
Customs Clearance
AH.
5 1
Unit Price
Total
Annual Annual Quantity Quantity
(Unit:
ea shpmt)
(Unit:
b. c.
a.
AJ. Overtime: Rates at Item A015 and A020 shall be increased by the following percentage (%) for services ordered to be accomplished during other than regular working hours (PWS PART I, para. A.3.b.)
Item
ZAMA YOKOSUKA
Estimated
Rate
Total
Estimated
8,350 0.12%
AJ.
No requirement 10 % d.
Rate
Total
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
SUB TOTAL OF SCHEDULE II (INBOUND) OF BASE YEAR
Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).
AREA TOTAL
ZAMA
YOKOSUKA
Overtime
(a) Estimated Annual Quantity 10 = (c) 0.12% of (b) Total Estimated Quantity of A015 and A020
(d) Extended Amount for Overtime = Total Extended Amount for "A015 and A020" x Estimated Annual Qty (0.12%) x Rate (%)
Item A030. Reserved.
RECAPITULATION SCHEDULE II
SCHEDULE III
INTRA-CITY AND INTRA-AREA MOVES (Items A031 through A034)
Item A031. Complete Service for Intra-City and Intra-Area Moves: Service must include a premove survey, servicing of appliances, packaging and packing at member's/employee's residence to protect household goods properly during transit, tagging of items, inventorying, loading, weighing, drayage, unloading, unpacking, and placing of each article in member's/employee’s new residence as directed by member/employee or member's/employee’s designated representative and removal of all empty containers and materials from residence.
Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Complete Service – Intra- City and Intra-Area Moves
4,000 11,500
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Annual
Unit Price
Total
Annual Annual Quantity Quantity (Unit: per pick-up)
(Unit: per pick-up)
Item A032. Attempted Pickup or Delivery: When the initial attempt to pickup or deliver a shipment at the member's/employee’s residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after Contractor’s notification, the ordering officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the Contractor left a notice of attempted pickup or delivery at the residence.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
Annual Annual Quantity Quantity (Unit: per loaded 10km) (Unit: per loaded 10km)
Item A033. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Attempted Pickup
AB.
3 1 Attempted Delivery
AA.
3 1
Drayage Beyond the Contract Area of Performance
Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).
Item A034. Additional Services: The Contractor must provide additional services not included above, but required for satisfactory completion of the services ordered under this contract.
A033.
10 1
Contract Area of Performance within a radius of 50 km within a radius of 100 km Not-to-exceed ~ a radius of 600 km a radius of 600 km
AA & AB. Moving and Placing Pianos or Organs: When moving and placing pianos or organs between residences are involved for local moves under Item A031, the contractor shall be paid the unit price listed hereunder in addition to the rate of Item A031.
Grand Piano
AB.
15 5
Annual Quantity Quantity (Unit: ea) (Unit: ea)
AA.
3 1
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Annual
Total
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
Upright Piano or Organ
AC. When the piano or organ is to be moved to or moved from the second floor or above, the following rate shall be added to the rate under Item A034AA or A034AB for each floor covered. However, this additional rate does not apply when a building elevator is available.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Unit Price
Total
Annual Annual Quantity Quantity (Unit: per service)
(Unit: per service)
To/from second floor or above
AD. Services Performed by Third Party: Third party services as specified in PWS PART I, paragraph A.6.
Note: The contractor must bill the Government for the requested/required third party services as a separate charge on the invoice supported by two (2) copies of the paid receipt/invoice from the third party.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
AC.
10 1
Unit Price
Total
Annual Annual Quantity Quantity (Unit: per pick-up)
(Unit: per pick-up)
Indefinite Third Party
AE. Additional Pickup and Delivery: In conjunction with Item A031, add a rate for one (1) additional pickup point or one
(1) additional delivery point for one (1) shipment within the performance area.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
AD.
2 TBD Indefinite 1 TBD
AE.
10 No requirement
Pickup or Delivery
b. c.
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
AF. Crane: Items of unusual heavy furniture. Except pianos and organs, may require service by a third party which is arranged by the contractor with the authorization of the ordering officer.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Rate
Total
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Indefinite Crane
AG. Overtime: Rates at Item A031shall be increased by the following percentage (%) for services ordered to be accomplished during other than regular working hours (PWS PART I, para. A.3.b.)
Item
ZAMA YOKOSUKA
Estimated
Rate
Total
Estimated
AF.
2 TBD Indefinite 1 TBD
AREA TOTAL
ZAMA
YOKOSUKA
d.
Overtime
(a) Estimated Annual Quantity 10 = (c) 0.09% of (b) Total Estimated Quantity of A031
(d) Extended Amount for Overtime = Total Extended Amount for A031 x Estimated Annual Qty (0.09%) x Rate (%)
RECAPITULATION SCHEDULE III
11,500 0.09%
AG.
No requirement a. 10 %
TOTAL OF SCHEDULE I, II, AND III OF BASE YEAR
Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).
(Insert this amount at CLINs in SF1449)
0001 ZAMA
0002 YOKOSUKA
SUB TOTAL OF SCHEDULE III
(INTRA-CITY AND INTRA-MOVES) OF BASE YEAR
Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).
RECAPITULATION SCHEDULE I, II, AND III
CLIN AREA TOTAL
OPTION ONE (12 months)
Item B002. Outbound (HHGs From Non-Temporary Storage): No requirement.
IV. SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE I
OUTBOUND SERVICES (Items B001 through B014)
Item B001. Complete Service - Outbound (HHG): Services must include pre-move survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container ASTM-D4169-01, SDDC Pamphlet 55-12) at member's/employee's residence, or at Government-furnished facility when ordered by the ordering officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on line-haul carrier’s equipment at the Government-furnished or contractor-furnished facility. When containers will not accommodate all articles of any one lot, loose articled must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize and other shipments must be paid for under Item B003.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
At member/employee Residence: Container, ASTM-D4169-01, or SDDC Pamphlet 55-12
AB.
100 290
At Government-furnished facility or Contractor’s facility: Container, ASTM- D4169-01, or SDDC Pamphlet 55-12
AA.
1,800 13,500
Estimated Unit Price
Total
Annual Annual
Quantity Quantity (Unit: NCWT) (Unit: NCWT)
Item B003. Complete Service-Outbound (HHG-Overflow Articles and HHGs Shipments requiring other than ASTM- D4169-01 or SDDC Pamphlet 55-12): Service must be the same as Item B001 or Item B002 except that the loose articles are drayed to Government-furnished or contractor-furnished facility when ordered by the ordering officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in ASTM-D4169-01 or SDDC Pamphlet 55-12. Overflow containers are of a lesser size than specified in ASTM- D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in ASTM-D4169-01
AA.
No requirement 125Government-Furnished Containers:
Overseas Pack: Overflow Articles
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Item
ZAMA YOKOSUKA
Estimated Unit Price
Total
Estimated Unit Price
Total
AD.
No requirement No requirementGovernment-Furnished Containers:
Domestic Pack: Overflow Articles
AE.
No requirement No requirementGovernment-Furnished Containers:
Domestic Pack: Oversize Articles
AC.
No requirement 60Government-Furnished Containers:
Overseas Pack: Other Shipments
AB.
No requirement 167Government-Furnished Containers:
Overseas Pack: Oversize Articles
(to be drayed to DLA
Yokosuka)
(at member/ employee's residence)
5 5 (to be drayed to Camp Zama warehouse)
AF.
No requirement No requirementGovernment-Furnished Containers:
Domestic Pack: Other Shipments
AG.
Contractor-Furnished Containers:
Overseas Pack: Overflow Articles
15 200
(to DDYJ) (at member/ employee’s)
5 6
(at Gov’t-
Overseas Pack: Oversize Articles
10 350
(to Zama) (at Gov’t’s)
AK.
No requirement No requirementContractor-Furnished Containers:
Domestic Pack: Overflow Articles
AL.
No requirement No requirementContractor-Furnished Containers:
Domestic Pack: Oversize Articles
(to DDYJ) (at member/ employee’s)
Overseas Pack: Other Shipments
18 120
(at Gov’t’s)
AM.
AA.
No requirement 1Government-Furnished Containers:
Drayage Included
Total
Estimated Unit Price
Total
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Item B004. Complete Service - Outbound (Unaccompanied Baggage (UB)): Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the line-haul carrier’s equipment. Service must be performed at member's/employee’s residence. (Service may be performed at Government-furnished facility or contractor-furnished facility when ordered by the Ordering Officer.)
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Contractor-Furnished Containers:
Drayage Included
AD.
No requirement 350Contractor-Furnished Containers:
Drayage Not Included
AC.
30 220
AB.
No requirement 1Government-Furnished Containers:
Drayage Not Included
AE.
No requirement 5
Shipboard Pack outs
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
AE. Shipboard Pack outs: When outbound services under items B001, B003 and B004 are ordered for performance at the member’s/employee’s residence located on an ocean vessel, the contractor must pick up goods outside fence perimeter. (Due to contractor’s personnel liability and safety, and for security reasons.)
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Item B005. Complete Service-Outbound (UB from Non-temporary Storage): No requirement.
Item B006. Outbound Service-UB Packed By Member/Employee: No requirement.
Item B007. Outbound Service-UB Packed By Member/Employee-Consolidated Shipments/Government Facility: No requirement.
Item B008. Expensive and Valuable Items: No requirement.
Item B009. Storage: Storage of containerized articles must be furnished when ordered by the ordering officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt or notification of completion of containerization service. Storage charges apply for 30-days period or fraction thereof. For Date of release from storage must not be considered in computation of storage charges. Charges are based on actual net weight of shipment (HHG or UB).
Storage 150 No requirement
Item B010. Containers: Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading.
*When a specific container from the SDDC Pam. 55-12 is ordered, the order will indicate the appropriate SDDC approval number.
Total
Estimated Unit Price
Total
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Annual Annual Quantity Quantity
AA.
No requirement No requirement
Container (ASTM-D4169-01)
(ea: each / cu ft: cubic feet)
Item
ZAMA YOKOSUKA
Estimated Unit
Price
Total
Estimated Unit Price
Total
Item B011. Remarking, Coopering and Assembly/Disassembly Service:
AA. Remarking of Shipments for Re-consignment: Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for re-consignment, and loading on the hauling carrier’s vehicle.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Crate
(ASTM-D6039/D6039M-02)
100 1,000
Container (SDDC Pamphlet 55-12)* 250 650 AC. (Unit: cu ft or fraction thereof)
(Unit: cu ft or fraction thereof)
AB. (Unit: ea) (Unit: ea)
Remarking
AB. Coopering: Services must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nail and bands shall be accomplished at no expense to the Government.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
AA.
15 30
Total
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
AB.
No requirement 1
Coopering
Unit Price
Total
Annual Annual
AC & AD. Assembly/Disassembly of Government-Owned Containers: Contractor will assemble Government-owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
AD.
No requirement 1
Disassembly
AC.
No requirement 1
Assembly
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
Contract Area of Performance within a radius of 50 km within a radius of 100 km Not-to-exceed ~ a radius of 600 km a radius of 600 km
Annual Annual Quantity Quantity (Unit: per loaded 10km) (Unit: per loaded 10km)
Item B012. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Item B013. Attempted Pickup: When the initial attempt to pickup a shipment at the member's/employee's residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after Contractor’s notification, the ordering officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member's/employee at the residence within one hour after notification, and (c) the Contractor left a notice of attempted pickup at the residence.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
HHG
AB.
5 1
UB
AA.
5 1
HHG
AB.
3 1
UB
AA.
3 1
Annual Annual Quantity Quantity
(Unit:
ea shpmt)
(Unit:
Unit Price
Total
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
Item B014. Additional Services: The Contractor must provide additional services not included above, but required for satisfactory completion of the services ordered under this contract.
AA & AB. Moving and Placing Pianos or Organs: When moving and placing pianos or organs are involved for outbound services under Item B001, the Contractor shall be paid the unit price listed hereunder in addition to the rate of Item B001.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
AC. When the piano or organ is to be moved from the second floor or above, the following rate shall be added to the rate under Item B014AA or B014AB for each floor covered. However, this additional rate does not apply when a building elevator is available.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Grand Piano
AB.
5 5 Upright Piano or Organ
AA.
3 1
Estimated Unit Price
Total
Annual Annual Quantity Quantity (Unit: per service)
(Unit: per service)
Second floor or above
AD. Services Performed by Third Party: Third party services as specified in PWS PART I, paragraph A.6.
Note: The contractor must bill the Government for the requested/required third party services as a separate charge on the invoice supported by two (2) copies of the paid receipt/invoice from the third party.
(*TBD: To Be Determined)
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
AC
2 1
Unit Price
Total
Annual Annual Quantity Quantity (Unit: per pick-up)
(Unit: per pick-up)
Indefinite Third Party
AE & AF. Additional Pickup: In conjunction with Item B001, B003, and B004, add a rate for one (1) additional pickup point for one (1) shipment within the performance area.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
AD.
2 *TBD Indefinite 1 TBD
HHG
AF.
3 1
UB
b. c.
AG. Crane: Items of unusual heavy furniture. Except pianos and organs, may require service by a third party which is arranged by the contractor with the authorization of the ordering officer.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Indefinite Crane
AH. Overtime: Rates at Item B001, B002 and B003 shall be increased by the following percentage (%) for services ordered to be accomplished during other than regular working hours (PWS PART, I para. A.3.b.)
Item
ZAMA YOKOSUKA
Estimated
Rate
Total
Estimated
AG.
2 TBD Indefinite 1 TBD
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
14,835 0.13%
AH.
No requirement a. 20 %
Rate
Total
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
SUB TOTAL OF SCHEDULE I (OUTBOUND) OF OPTION ONE
Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).
AREA TOTAL
ZAMA
YOKOSUKA
d.
Overtime
(a) Estimated Annual Quantity 20 = (c) 0.13% of (b) Total Estimated Quantity of B001, B002 and B003
(d) Extended Amount for Overtime = Total Extended Amount for "B001, B002 and B003" x Estimated Annual Qty (0.13%) x Rate (%)
SCHEDULE II
INBOUND SERVICES (Items B015 through B030)
Item B015. Complete Service - Inbound (HHGs): Service must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers to government-furnished or contractor-furnished facility and return, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, drayage to member's/employee's residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, un-servicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates and debris from member's/employee's residence and drayage of empty containers to Government facility or Contractor’s facility.
Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Complete Service – Inbound (HHGs) 1,120 8,100
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Annual
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Item B020. Complete Service - Inbound (UB): Service must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers to Government-furnished or contractor-furnished facility, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, drayage of UB containers to member's/employee's residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Item B016. Complete Service - Inbound (HHG): No requirement.
Item B017. Complete Service - Inbound (HHG): No requirement.
Item B018. Inbound Service-Contractor Facility (HHG): No requirement.
Item B019. Complete Service – Expensive and Valuable Items: No requirement.
Item B021. Complete Service - Inbound (Unaccompanied Baggage): No requirement.
Item B022. Inbound Service – Contractor Facility (Unaccompanied Baggage): No requirement.
Item B023. Storage: Storage of containerized articles must be furnished when ordered by the ordering officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt or notification of arrival of shipment. Storage charges apply for 30-days period or fraction thereof. Date of release from storage must not be considered in computation of storage charges. Charges are based on actual net weight of shipment (HHG or UB).
Complete Service –
Estimated Unit Price
Total
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
AA. Remarking of Shipment for Re-consignment: Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to Government-furnished or contractor-furnished facility, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for re-consignment loading on the hauling carrier’s vehicle.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Storage 50 No requirement
Item B024. Remarking, Coopering, and Assembly/Disassembly Service:
AB.
No requirement 1
Coopering
Unit Price
Total
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
Remarking
AB. Coopering: Services must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nail and bands shall be accomplished at no expense to the Government.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated
AA.
15 1
AC.
No requirement 5
Assembly
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
AC & AD. Assembly/Disassembly of Government-Owned Containers: Contractor will assemble Government-owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
AD.
Annual Annual Quantity Quantity
(Unit:
ea shpmt)
(Unit:
ea shpmt)
Item B025. Attempted Delivery: When the initial attempt to deliver a shipment at the member's/employee's residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after Contractor’s notification, the ordering officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the Contractor left a notice of attempted delivery at the residence.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
Item B026. Reweighing: Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
HHG
AB.
3 2
UB
AA.
3 2
HHG
AB.
5 1
UB
AA.
2 1
Annual Annual Quantity Quantity
(Unit:
ea shpmt)
(Unit:
ea shpmt)
Contract Area of Performance within a radius of 50 km within a radius of 100 km Not-to-exceed ~ a radius of 600 km a radius of 600 km
Annual Annual Quantity Quantity (Unit: per loaded 10km) (Unit: per loaded 10km)
Item B027. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
HHG
AB.
5 1
UB
Annual Annual Quantity Quantity
(Unit: NCWT) (Unit: NCWT)
Item B028. Partial Withdrawal: Service must be the same as Item B015 or B020, except a partial removal of the items from the outer container will be performed at the Government-furnished or contractor-furnished facility. Articles not removed from the shipment will remain at the Government-furnished or contractor-furnished facility.
Item
ZAMA YOKOSUKA
Estimated
Unit Price
Total
Estimated Unit Price
Total
AC.
No requirement No requirement
UB Drayage Included
AD.
No requirement No requirement UB Drayage Not Included
HHG Drayage Included
AB.
No requirement 25 HHG Drayage Not Included
AA.
3 10
Unit Price
Total
Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)
Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).
Item B029. Additional Services: The Contractor must provide additional services not included above,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .