PRICING SCHEDULE ESHIBIT A thru F
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA5209-15-R-0013_0001.pdf | ||
| EXHIBITS_(PRICE_LIST)_Revised_22_Oct_15.xlsx | XLSX spreadsheet | |
| Attach_2-PPI_List_FA5209-15-R-0013.pdf | ||
| Attach_1-_PWS_FA5209-15-R-0013.pdf | ||
| Prospective_Proposer.pdf | ||
| Attach_3-PPSurvey.pdf | ||
| FA5209-15-R-0013_SOLICITATION.doc | DOC document | |
| Notice_to_Offerors_FA5209-15-R-0013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLICE LIST BASIC YEAR
| The following pricing schedule will be used to provide pricing information |
| Basic Period: 1 Feb 16 thru 31 Jan 17 |
| CLIN | DESCRIPTION | UNIT | QTY | UNIT PRICE | TOTAL | |
| 1 | A001 | SCAFFOLDING: TUBULAR METAL, Top<10m HIGH | SM | 120 | ||
| 2 | A002 | SCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGH | SM | 120 | ||
| 3 | A003 | SCAFFOLDING: TUBULAR METAL, Top>25m HIGH | SM | 120 | ||
| 4 | A004 | SCAFFOLDING: INTERIOR HUNG INCL. SAFETY NET | SM | 120 | ||
| 5 | A005 | SCAFFOLDING: PORTABLE TRESTLE PLATFORM | SM | 120 | ||
| 6 | A006 | SCAFFOLDING: MOBILE SCAFFOLDING | SM | 120 | ||
| 7 | A007 | SHEET PROTECTION (WEATHER) | SM | 60 | ||
| 8 | A008 | CLEAN, HEPA VAC & WET WIPE | SM | 1,200 | ||
| 9 | A009 | PROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PW | SM | 100 | ||
| 10 | A010 | PROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PW | SM | 100 | ||
| 11 | A011 | INST/DEMO DECON CHAMBER | SM | 300 | ||
| 12 | A012 | PROTECT, FLOORS, 6 MIL POLY | SM | 300 | ||
| 13 | A013 | PROTECT, WALLS, 6 MIL POLY | SM | 300 | ||
| 14 | A014 | PROTECT, CEILINGS, 6 MIL POLY | SM | 300 | ||
| 15 | A015 | PROTECT, EQUIPMENT, 6 MIL POLY | SM | 200 | ||
| 16 | A016 | PROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLY | SM | 172 | ||
| 17 | A017 | DEMO, NON-ACM GWB | SM | 40 | ||
| 18 | A018 | DEMO, NON-ACM SUSPENDED CEILING | SM | 40 | ||
| 19 | A019 | DEMO, NON-ACM SUSPENDED CEILING, 2X GRID | SM | 40 | ||
| 20 | A020 | DEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4 | EA | 20 | ||
| 21 | A021 | DEMO, NON-ACM PARTITION, PLASTER | SM | 40 | ||
| 22 | A022 | DEMO, NON-ACM PARTITION, GWB | SM | 40 | ||
| 23 | A023 | DEMO, NON-ACM CARPET | SM | 180 | ||
| 24 | A024 | DEMO, ACM INSULATION, SPRAY-ON | SM | 100 | ||
| 25 | A025 | DEMO, ACM BOILER/HEATER INSULATION | SM | 100 | ||
| 26 | A026 | DEMO, ACM BOILER BREECHING/FLUE INSULATION | SM | 60 | ||
| 27 | A027 | DEMO, ACM DUCT OR AHU INSULATION | SM | 200 | ||
| 28 | A028 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2 | EA | 20 | ||
| 29 | A029 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2 | EA | 20 | ||
| 30 | A030 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2 | EA | 20 | ||
| 31 | A031 | DEMO, ACM PIPE INSULATION, UP TO 100mm | LM | 40 | ||
| 32 | A032 | DEMO, ACM PIPE INSULATION, 101 TO 200 mm | LM | 40 | ||
| 33 | A033 | DEMO, ACM PIPE INSULATION, 201 TO 300 mm | LM | 40 | ||
| 34 | A034 | DEMO, ACM PIPE INSULATION, 301 TO 400 mm | LM | 40 | ||
| 35 | A035 | DEMO, ACM PIPE INSULATION, >400 mm | LM | 40 | ||
| 36 | A036 | DEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mm | LM | 20 | ||
| 37 | A037 | DEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mm | LM | 20 | ||
| 38 | A038 | DEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mm | LM | 20 | ||
| 39 | A039 | DEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mm | LM | 20 | ||
| 40 | A040 | DEMO, ACM PIPE INSULATION W/ PIPE, >400 mm | LM | 20 | ||
| 41 | A041 | DEMO, ACM PIPE FITTING INSULATION, UP TO 100 mm | EA | 20 | ||
| 42 | A042 | DEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mm | EA | 20 | ||
| 43 | A043 | DEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mm | EA | 20 | ||
| 44 | A044 | DEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mm | EA | 20 | ||
| 45 | A045 | DEMO, ACM PIPE FITTING INSULATION, >400 mm | EA | 20 | ||
| 46 | A046 | DEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mm | EA | 10 | ||
| 47 | A047 | DEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mm | EA | 10 | ||
| 48 | A048 | DEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mm | EA | 10 | ||
| 49 | A049 | DEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mm | EA | 10 | ||
| 50 | A050 | DEMO, ACM PIPE FITTING W/ INSULATION, >400 mm | EA | 10 | ||
| 51 | A051 | DEMO, ACM PIPE/FITTING INSULATION, GLOVE BAG | EA | 60 | ||
| 52 | A052 | DEMO, ACM CEMENTITIOUS MATL, FLAT SURFACE | SM | 30 | ||
| 53 | A053 | DEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACE | SM | 30 | ||
| 54 | A054 | DEMO, ACM CEILING SYSTEM, SOLID | SM | 240 | ||
| 55 | A055 | DEMO, ACM CEILING SYSTEM, LAY-IN | SM | 240 | ||
| 56 | A056 | DEMO, ACM FLOOR TILE/MASTIC | SM | 200 | ||
| 57 | A057 | DEMO, ACM WALL TILE/MASTIC | SM | 150 | ||
| 58 | A058 | DEMO, ACM CARPET/MASTIC | SM | 120 | ||
| 59 | A059 | DEMO, ACM COVE BASE/MASTIC | LM | 160 | ||
| 60 | A060 | DEMO, ACM BASE BOARD & MASTIC, GLOVE BAG | EA | 30 | ||
| 61 | A061 | DEMO, ACM WALL TILE & MASTIC, GLOVE BAG | EA | 30 | ||
| 62 | A062 | DEMO, ACM FLOOR TILE & MASTIC, GLOVE BAG | EA | 30 | ||
| 63 | A063 | DEMO, ACM WALL BOARD/TRANSITE/FINISH | SM | 40 | ||
| 64 | A064 | DEMO, ACM SOIL | CM | 2 | ||
| 65 | A065 | DISPOSAL, ACM COLLECT/BAG/TRANSPORT | CM | 20 | ||
| 66 | A066 | DISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREA | CM | 100 | ||
| 67 | A067 | DISPOSAL, NON-ACM COLLECT/TRANSPORT | CM | 6 | ||
| 68 | A068 | DISPOSAL, NON-ACM GWB COLLECT/TRANSPORT | CM | 6 | ||
| 69 | A069 | ENCAPSULATE, WALLS/CEILINGS/FLOOR | SM | 1,000 | ||
| 70 | A070 | ENCAPSULATE, BEAMS/COLUMNS/STRUCTURE | SM | 300 | ||
| 71 | A071 | ENCAPSULATE, PIPES, UP TO 300 mm | LM | 20 | ||
| 72 | A072 | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM, | EA | 400 | ||
| 73 | A073 | Sample/Analyze, Clearance Sample, Aggressive, TEM, | EA | 400 | ||
| 74 | A074 | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | EA | 300 | ||
| 75 | A075 | Sample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCM | EA | 300 | ||
| 76 | A076 | Demo, ACM Mortar (up to 30mm thickness) | SM | 20 | ||
| 77 | A077 | DEMO, ACM CONCREAT CORE DRILL < 200mm BREADTH | EA | 6 | ||
| 78 | A078 | DEMO, OTHER ACM CORE DRILL < 200mm BREADTH | EA | 10 | ||
| 79 | A079 | Electric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 days | EA | 10 | ||
| 80 | A080 | Electric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14days | EA | 10 | ||
| TOTAL AMOUNT FOR BASIC PERIOD: | ||||||
| ABBREVIATIONS: | ||||||
| MH-MAN HOUR LF- LINEAR FOOT | ||||||
| SY-SQUARE YARD EA-EACH |
&"Times New Roman,Bold"EXHIBIT A FOR CLIN 0001 PRICING SCHEDULE &"Times New Roman,Regular"&10&K000000RFP No. FA5209-15-R-0013
PLICE LIST OPTION 1
| The following pricing schedule will be used to provide pricing information |
| Option 1 Period: 1 Feb 17 thru 31 Jan 18 |
| 1 | B001 | SCAFFOLDING: TUBULAR METAL, Top<10m HIGH | SM | 120 |
| 2 | B002 | SCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGH | SM | 120 |
| 3 | B003 | SCAFFOLDING: TUBULAR METAL, Top>25m HIGH | SM | 120 |
| 4 | B004 | SCAFFOLDING: INTERIOR HUNG INCL. SAFETY NET | SM | 120 |
| 5 | B005 | SCAFFOLDING: PORTABLE TRESTLE PLATFORM | SM | 120 |
| 6 | B006 | SCAFFOLDING: MOBILE SCAFFOLDING | SM | 120 |
| 7 | B007 | SHEET PROTECTION (WEATHER) | SM | 60 |
| 8 | B008 | CLEAN, HEPA VAC & WET WIPE | SM | 1,200 |
| 9 | B009 | PROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PW | SM | 100 |
| 10 | B010 | PROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PW | SM | 100 |
| 11 | B011 | INST/DEMO DECON CHAMBER | SM | 300 |
| 12 | B012 | PROTECT, FLOORS, 6 MIL POLY | SM | 300 |
| 13 | B013 | PROTECT, WALLS, 6 MIL POLY | SM | 300 |
| 14 | B014 | PROTECT, CEILINGS, 6 MIL POLY | SM | 300 |
| 15 | B015 | PROTECT, EQUIPMENT, 6 MIL POLY | SM | 200 |
| 16 | B016 | PROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLY | SM | 172 |
| 17 | B017 | DEMO, NON-ACM GWB | SM | 40 |
| 18 | B018 | DEMO, NON-ACM SUSPENDED CEILING | SM | 40 |
| 19 | B019 | DEMO, NON-ACM SUSPENDED CEILING, 2X GRID | SM | 40 |
| 20 | B020 | DEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4 | EA | 20 |
| 21 | B021 | DEMO, NON-ACM PARTITION, PLASTER | SM | 40 |
| 22 | B022 | DEMO, NON-ACM PARTITION, GWB | SM | 40 |
| 23 | B023 | DEMO, NON-ACM CARPET | SM | 180 |
| 24 | B024 | DEMO, ACM INSULATION, SPRAY-ON | SM | 100 |
| 25 | B025 | DEMO, ACM BOILER/HEATER INSULATION | SM | 100 |
| 26 | B026 | DEMO, ACM BOILER BREECHING/FLUE INSULATION | SM | 60 |
| 27 | B027 | DEMO, ACM DUCT OR AHU INSULATION | SM | 200 |
| 28 | B028 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2 | EA | 20 |
| 29 | B029 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2 | EA | 20 |
| 30 | B030 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2 | EA | 20 |
| 31 | B031 | DEMO, ACM PIPE INSULATION, UP TO 100mm | LM | 40 |
| 32 | B032 | DEMO, ACM PIPE INSULATION, 101 TO 200 mm | LM | 40 |
| 33 | B033 | DEMO, ACM PIPE INSULATION, 201 TO 300 mm | LM | 40 |
| 34 | B034 | DEMO, ACM PIPE INSULATION, 301 TO 400 mm | LM | 40 |
| 35 | B035 | DEMO, ACM PIPE INSULATION, >400 mm | LM | 40 |
| 36 | B036 | DEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mm | LM | 20 |
| 37 | B037 | DEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mm | LM | 20 |
| 38 | B038 | DEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mm | LM | 20 |
| 39 | B039 | DEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mm | LM | 20 |
| 40 | B040 | DEMO, ACM PIPE INSULATION W/ PIPE, >400 mm | LM | 20 |
| 41 | B041 | DEMO, ACM PIPE FITTING INSULATION, UP TO 100 mm | EA | 20 |
| 42 | B042 | DEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mm | EA | 20 |
| 43 | B043 | DEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mm | EA | 20 |
| 44 | B044 | DEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mm | EA | 20 |
| 45 | B045 | DEMO, ACM PIPE FITTING INSULATION, >400 mm | EA | 20 |
| 46 | B046 | DEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mm | EA | 10 |
| 47 | B047 | DEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mm | EA | 10 |
| 48 | B048 | DEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mm | EA | 10 |
| 49 | B049 | DEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mm | EA | 10 |
| 50 | B050 | DEMO, ACM PIPE FITTING W/ INSULATION, >400 mm | EA | 10 |
| 51 | B051 | DEMO, ACM PIPE/FITTING INSULATION, GLOVE BAG | EA | 60 |
| 52 | B052 | DEMO, ACM CEMENTITIOUS MATL, FLAT SURFACE | SM | 30 |
| 53 | B053 | DEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACE | SM | 30 |
| 54 | B054 | DEMO, ACM CEILING SYSTEM, SOLID | SM | 240 |
| 55 | B055 | DEMO, ACM CEILING SYSTEM, LAY-IN | SM | 240 |
| 56 | B056 | DEMO, ACM FLOOR TILE/MASTIC | SM | 200 |
| 57 | B057 | DEMO, ACM WALL TILE/MASTIC | SM | 150 |
| 58 | B058 | DEMO, ACM CARPET/MASTIC | SM | 120 |
| 59 | B059 | DEMO, ACM COVE BASE/MASTIC | LM | 160 |
| 60 | B060 | DEMO, ACM BASE BOARD & MASTIC, GLOVE BAG | EA | 30 |
| 61 | B061 | DEMO, ACM WALL TILE & MASTIC, GLOVE BAG | EA | 30 |
| 62 | B062 | DEMO, ACM FLOOR TILE & MASTIC, GLOVE BAG | EA | 30 |
| 63 | B063 | DEMO, ACM WALL BOARD/TRANSITE/FINISH | SM | 40 |
| 64 | B064 | DEMO, ACM SOIL | CM | 2 |
| 65 | B065 | DISPOSAL, ACM COLLECT/BAG/TRANSPORT | CM | 20 |
| 66 | B066 | DISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREA | CM | 100 |
| 67 | B067 | DISPOSAL, NON-ACM COLLECT/TRANSPORT | CM | 6 |
| 68 | B068 | DISPOSAL, NON-ACM GWB COLLECT/TRANSPORT | CM | 6 |
| 69 | B069 | ENCAPSULATE, WALLS/CEILINGS/FLOOR | SM | 1,000 |
| 70 | B070 | ENCAPSULATE, BEAMS/COLUMNS/STRUCTURE | SM | 300 |
| 71 | B071 | ENCAPSULATE, PIPES, UP TO 300 mm | LM | 20 |
| 72 | B072 | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM, | EA | 400 |
| 73 | B073 | Sample/Analyze, Clearance Sample, Aggressive, TEM, | EA | 400 |
| 74 | B074 | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | EA | 300 |
| 75 | B075 | Sample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCM | EA | 300 |
| 76 | B076 | Demo, ACM Mortar (up to 30mm thickness) | SM | 20 |
| 77 | B077 | DEMO, ACM CONCREAT CORE DRILL < 200mm BREADTH | EA | 6 |
| 78 | B078 | DEMO, OTHER ACM CORE DRILL < 200mm BREADTH | EA | 10 |
| 79 | B079 | Electric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 days | EA | 10 |
| 80 | B080 | Electric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14days | EA | 10 |
| TOTAL AMOUNT FOR OPTION 1: | ||||
| ABBREVIATIONS: | ||||
| MH-MAN HOUR LF- LINEAR FOOT | ||||
| SY-SQUARE YARD EA-EACH |
&"Times New Roman,Bold"EXHIBIT B FOR CLIN 1001 PRICING SCHEDULE &"Times New Roman,Regular"RFP No. FA5209-15-R-0013
PLICE LIST OPTION 2
| The following pricing schedule will be used to provide pricing information | ||||||
| OPTION 2 ( 1 Feb 18 thru 31 Jan 19) | ||||||
| CLIN | DESCRIPTION | UNIT | QTY | UNIT PRICE | TOTAL | |
| 1 | C001 | SCAFFOLDING: TUBULAR METAL, Top<10m HIGH | SM | 120 | ||
| 2 | C002 | SCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGH | SM | 120 | ||
| 3 | C003 | SCAFFOLDING: TUBULAR METAL, Top>25m HIGH | SM | 120 | ||
| 4 | C004 | SCAFFOLDING: INTERIOR HUNG INCL. SAFETY NET | SM | 120 | ||
| 5 | C005 | SCAFFOLDING: PORTABLE TRESTLE PLATFORM | SM | 120 | ||
| 6 | C006 | SCAFFOLDING: MOBILE SCAFFOLDING | SM | 120 | ||
| 7 | C007 | SHEET PROTECTION (WEATHER) | SM | 60 | ||
| 8 | C008 | CLEAN, HEPA VAC & WET WIPE | SM | 1,200 | ||
| 9 | C009 | PROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PW | SM | 100 | ||
| 10 | C010 | PROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PW | SM | 100 | ||
| 11 | C011 | INST/DEMO DECON CHAMBER | SM | 300 | ||
| 12 | C012 | PROTECT, FLOORS, 6 MIL POLY | SM | 300 | ||
| 13 | C013 | PROTECT, WALLS, 6 MIL POLY | SM | 300 | ||
| 14 | C014 | PROTECT, CEILINGS, 6 MIL POLY | SM | 300 | ||
| 15 | C015 | PROTECT, EQUIPMENT, 6 MIL POLY | SM | 200 | ||
| 16 | C016 | PROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLY | SM | 172 | ||
| 17 | C017 | DEMO, NON-ACM GWB | SM | 40 | ||
| 18 | C018 | DEMO, NON-ACM SUSPENDED CEILING | SM | 40 | ||
| 19 | C019 | DEMO, NON-ACM SUSPENDED CEILING, 2X GRID | SM | 40 | ||
| 20 | C020 | DEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4 | EA | 20 | ||
| 21 | C021 | DEMO, NON-ACM PARTITION, PLASTER | SM | 40 | ||
| 22 | C022 | DEMO, NON-ACM PARTITION, GWB | SM | 40 | ||
| 23 | C023 | DEMO, NON-ACM CARPET | SM | 180 | ||
| 24 | C024 | DEMO, ACM INSULATION, SPRAY-ON | SM | 100 | ||
| 25 | C025 | DEMO, ACM BOILER/HEATER INSULATION | SM | 100 | ||
| 26 | C026 | DEMO, ACM BOILER BREECHING/FLUE INSULATION | SM | 60 | ||
| 27 | C027 | DEMO, ACM DUCT OR AHU INSULATION | SM | 200 | ||
| 28 | C028 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2 | EA | 20 | ||
| 29 | C029 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2 | EA | 20 | ||
| 30 | C030 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2 | EA | 20 | ||
| 31 | C031 | DEMO, ACM PIPE INSULATION, UP TO 100mm | LM | 40 | ||
| 32 | C032 | DEMO, ACM PIPE INSULATION, 101 TO 200 mm | LM | 40 | ||
| 33 | C033 | DEMO, ACM PIPE INSULATION, 201 TO 300 mm | LM | 40 | ||
| 34 | C034 | DEMO, ACM PIPE INSULATION, 301 TO 400 mm | LM | 40 | ||
| 35 | C035 | DEMO, ACM PIPE INSULATION, >400 mm | LM | 40 | ||
| 36 | C036 | DEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mm | LM | 20 | ||
| 37 | C037 | DEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mm | LM | 20 | ||
| 38 | C038 | DEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mm | LM | 20 | ||
| 39 | C039 | DEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mm | LM | 20 | ||
| 40 | C040 | DEMO, ACM PIPE INSULATION W/ PIPE, >400 mm | LM | 20 | ||
| 41 | C041 | DEMO, ACM PIPE FITTING INSULATION, UP TO 100 mm | EA | 20 | ||
| 42 | C042 | DEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mm | EA | 20 | ||
| 43 | C043 | DEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mm | EA | 20 | ||
| 44 | C044 | DEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mm | EA | 20 | ||
| 45 | C045 | DEMO, ACM PIPE FITTING INSULATION, >400 mm | EA | 20 | ||
| 46 | C046 | DEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mm | EA | 10 | ||
| 47 | C047 | DEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mm | EA | 10 | ||
| 48 | C048 | DEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mm | EA | 10 | ||
| 49 | C049 | DEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mm | EA | 10 | ||
| 50 | C050 | DEMO, ACM PIPE FITTING W/ INSULATION, >400 mm | EA | 10 | ||
| 51 | C051 | DEMO, ACM PIPE/FITTING INSULATION, GLOVE BAG | EA | 60 | ||
| 52 | C052 | DEMO, ACM CEMENTITIOUS MATL, FLAT SURFACE | SM | 30 | ||
| 53 | C053 | DEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACE | SM | 30 | ||
| 54 | C054 | DEMO, ACM CEILING SYSTEM, SOLID | SM | 240 | ||
| 55 | C055 | DEMO, ACM CEILING SYSTEM, LAY-IN | SM | 240 | ||
| 56 | C056 | DEMO, ACM FLOOR TILE/MASTIC | SM | 200 | ||
| 57 | C057 | DEMO, ACM WALL TILE/MASTIC | SM | 150 | ||
| 58 | C058 | DEMO, ACM CARPET/MASTIC | SM | 120 | ||
| 59 | C059 | DEMO, ACM COVE BASE/MASTIC | LM | 160 | ||
| 60 | C060 | DEMO, ACM BASE BOARD & MASTIC, GLOVE BAG | EA | 30 | ||
| 61 | C061 | DEMO, ACM WALL TILE & MASTIC, GLOVE BAG | EA | 30 | ||
| 62 | C062 | DEMO, ACM FLOOR TILE & MASTIC, GLOVE BAG | EA | 30 | ||
| 63 | C063 | DEMO, ACM WALL BOARD/TRANSITE/FINISH | SM | 40 | ||
| 64 | C064 | DEMO, ACM SOIL | CM | 2 | ||
| 65 | C065 | DISPOSAL, ACM COLLECT/BAG/TRANSPORT | CM | 20 | ||
| 66 | C066 | DISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREA | CM | 100 | ||
| 67 | C067 | DISPOSAL, NON-ACM COLLECT/TRANSPORT | CM | 6 | ||
| 68 | C068 | DISPOSAL, NON-ACM GWB COLLECT/TRANSPORT | CM | 6 | ||
| 69 | C069 | ENCAPSULATE, WALLS/CEILINGS/FLOOR | SM | 1,000 | ||
| 70 | C070 | ENCAPSULATE, BEAMS/COLUMNS/STRUCTURE | SM | 300 | ||
| 71 | C071 | ENCAPSULATE, PIPES, UP TO 300 mm | LM | 20 | ||
| 72 | C072 | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM, | EA | 400 | ||
| 73 | C073 | Sample/Analyze, Clearance Sample, Aggressive, TEM, | EA | 400 | ||
| 74 | C074 | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | EA | 300 | ||
| 75 | C075 | Sample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCM | EA | 300 | ||
| 76 | C076 | Demo, ACM Mortar (up to 30mm thickness) | SM | 20 | ||
| 77 | C077 | DEMO, ACM CONCREAT CORE DRILL < 200mm BREADTH | EA | 6 | ||
| 78 | C078 | DEMO, OTHER ACM CORE DRILL < 200mm BREADTH | EA | 10 | ||
| 79 | C079 | Electric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 days | EA | 10 | ||
| 80 | C080 | Electric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14days | EA | 10 | ||
| TOTAL AMOUNT FOR OPTION 2 PERIOD: | ||||||
| ABBREVIATIONS: | ||||||
| MH-MAN HOUR LF- LINEAR FOOT | ||||||
| SY-SQUARE YARD EA-EACH |
&"Times New Roman,Bold"EXHIBIT C FOR CLIN 2001 PRICING SCHEDULE &"Times New Roman,Regular"RFP No.FA5209-15-R-0013
PLICE LIST OPTION 3
| The following pricing schedule will be used to provide pricing information | ||||||
| OPTION 3 ( 1 Feb 19 thru 31 Jan 20) | ||||||
| CLIN | DESCRIPTION | UNIT | QTY | UNIT PRICE | TOTAL | |
| 1 | D001 | SCAFFOLDING: TUBULAR METAL, Top<10m HIGH | SM | 120 | ||
| 2 | D002 | SCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGH | SM | 120 | ||
| 3 | D003 | SCAFFOLDING: TUBULAR METAL, Top>25m HIGH | SM | 120 | ||
| 4 | D004 | SCAFFOLDING: INTERIOR HUNG INCL. SAFETY NET | SM | 120 | ||
| 5 | D005 | SCAFFOLDING: PORTABLE TRESTLE PLATFORM | SM | 120 | ||
| 6 | D006 | SCAFFOLDING: MOBILE SCAFFOLDING | SM | 120 | ||
| 7 | D007 | SHEET PROTECTION (WEATHER) | SM | 60 | ||
| 8 | D008 | CLEAN, HEPA VAC & WET WIPE | SM | 1,200 | ||
| 9 | D009 | PROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PW | SM | 100 | ||
| 10 | D010 | PROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PW | SM | 100 | ||
| 11 | D011 | INST/DEMO DECON CHAMBER | SM | 300 | ||
| 12 | D012 | PROTECT, FLOORS, 6 MIL POLY | SM | 300 | ||
| 13 | D013 | PROTECT, WALLS, 6 MIL POLY | SM | 300 | ||
| 14 | D014 | PROTECT, CEILINGS, 6 MIL POLY | SM | 300 | ||
| 15 | D015 | PROTECT, EQUIPMENT, 6 MIL POLY | SM | 200 | ||
| 16 | D016 | PROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLY | SM | 172 | ||
| 17 | D017 | DEMO, NON-ACM GWB | SM | 40 | ||
| 18 | D018 | DEMO, NON-ACM SUSPENDED CEILING | SM | 40 | ||
| 19 | D019 | DEMO, NON-ACM SUSPENDED CEILING, 2X GRID | SM | 40 | ||
| 20 | D020 | DEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4 | EA | 20 | ||
| 21 | D021 | DEMO, NON-ACM PARTITION, PLASTER | SM | 40 | ||
| 22 | D022 | DEMO, NON-ACM PARTITION, GWB | SM | 40 | ||
| 23 | D023 | DEMO, NON-ACM CARPET | SM | 180 | ||
| 24 | D024 | DEMO, ACM INSULATION, SPRAY-ON | SM | 100 | ||
| 25 | D025 | DEMO, ACM BOILER/HEATER INSULATION | SM | 100 | ||
| 26 | D026 | DEMO, ACM BOILER BREECHING/FLUE INSULATION | SM | 60 | ||
| 27 | D027 | DEMO, ACM DUCT OR AHU INSULATION | SM | 200 | ||
| 28 | D028 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2 | EA | 20 | ||
| 29 | D029 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2 | EA | 20 | ||
| 30 | D030 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2 | EA | 20 | ||
| 31 | D031 | DEMO, ACM PIPE INSULATION, UP TO 100mm | LM | 40 | ||
| 32 | D032 | DEMO, ACM PIPE INSULATION, 101 TO 200 mm | LM | 40 | ||
| 33 | D033 | DEMO, ACM PIPE INSULATION, 201 TO 300 mm | LM | 40 | ||
| 34 | D034 | DEMO, ACM PIPE INSULATION, 301 TO 400 mm | LM | 40 | ||
| 35 | D035 | DEMO, ACM PIPE INSULATION, >400 mm | LM | 40 | ||
| 36 | D036 | DEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mm | LM | 20 | ||
| 37 | D037 | DEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mm | LM | 20 | ||
| 38 | D038 | DEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mm | LM | 20 | ||
| 39 | D039 | DEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mm | LM | 20 | ||
| 40 | D040 | DEMO, ACM PIPE INSULATION W/ PIPE, >400 mm | LM | 20 | ||
| 41 | D041 | DEMO, ACM PIPE FITTING INSULATION, UP TO 100 mm | EA | 20 | ||
| 42 | D042 | DEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mm | EA | 20 | ||
| 43 | D043 | DEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mm | EA | 20 | ||
| 44 | D044 | DEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mm | EA | 20 | ||
| 45 | D045 | DEMO, ACM PIPE FITTING INSULATION, >400 mm | EA | 20 | ||
| 46 | D046 | DEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mm | EA | 10 | ||
| 47 | D047 | DEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mm | EA | 10 | ||
| 48 | D048 | DEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mm | EA | 10 | ||
| 49 | D049 | DEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mm | EA | 10 | ||
| 50 | D050 | DEMO, ACM PIPE FITTING W/ INSULATION, >400 mm | EA | 10 | ||
| 51 | D051 | DEMO, ACM PIPE/FITTING INSULATION, GLOVE BAG | EA | 60 | ||
| 52 | D052 | DEMO, ACM CEMENTITIOUS MATL, FLAT SURFACE | SM | 30 | ||
| 53 | D053 | DEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACE | SM | 30 | ||
| 54 | D054 | DEMO, ACM CEILING SYSTEM, SOLID | SM | 240 | ||
| 55 | D055 | DEMO, ACM CEILING SYSTEM, LAY-IN | SM | 240 | ||
| 56 | D056 | DEMO, ACM FLOOR TILE/MASTIC | SM | 200 | ||
| 57 | D057 | DEMO, ACM WALL TILE/MASTIC | SM | 150 | ||
| 58 | D058 | DEMO, ACM CARPET/MASTIC | SM | 120 | ||
| 59 | D059 | DEMO, ACM COVE BASE/MASTIC | LM | 160 | ||
| 60 | D060 | DEMO, ACM BASE BOARD & MASTIC, GLOVE BAG | EA | 30 | ||
| 61 | D061 | DEMO, ACM WALL TILE & MASTIC, GLOVE BAG | EA | 30 | ||
| 62 | D062 | DEMO, ACM FLOOR TILE & MASTIC, GLOVE BAG | EA | 30 | ||
| 63 | D063 | DEMO, ACM WALL BOARD/TRANSITE/FINISH | SM | 40 | ||
| 64 | D064 | DEMO, ACM SOIL | CM | 2 | ||
| 65 | D065 | DISPOSAL, ACM COLLECT/BAG/TRANSPORT | CM | 20 | ||
| 66 | D066 | DISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREA | CM | 100 | ||
| 67 | D067 | DISPOSAL, NON-ACM COLLECT/TRANSPORT | CM | 6 | ||
| 68 | D068 | DISPOSAL, NON-ACM GWB COLLECT/TRANSPORT | CM | 6 | ||
| 69 | D069 | ENCAPSULATE, WALLS/CEILINGS/FLOOR | SM | 1,000 | ||
| 70 | D070 | ENCAPSULATE, BEAMS/COLUMNS/STRUCTURE | SM | 300 | ||
| 71 | D071 | ENCAPSULATE, PIPES, UP TO 300 mm | LM | 20 | ||
| 72 | D072 | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM, | EA | 400 | ||
| 73 | D073 | Sample/Analyze, Clearance Sample, Aggressive, TEM, | EA | 400 | ||
| 74 | D074 | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | EA | 300 | ||
| 75 | D075 | Sample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCM | EA | 300 | ||
| 76 | D076 | Demo, ACM Mortar (up to 30mm thickness) | SM | 20 | ||
| 77 | D077 | DEMO, ACM CONCREAT CORE DRILL < 200mm BREADTH | EA | 6 | ||
| 78 | D078 | DEMO, OTHER ACM CORE DRILL < 200mm BREADTH | EA | 10 | ||
| 79 | D079 | Electric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 days | EA | 10 | ||
| 80 | D080 | Electric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14days | EA | 10 | ||
| TOTAL AMOUNT FOR OPTION 3 PERIOD: | ||||||
| ABBREVIATIONS: | ||||||
| MH-MAN HOUR LF- LINEAR FOOT | ||||||
| SY-SQUARE YARD EA-EACH |
&"Times New Roman,Bold"EXHIBIT D FOR CLIN 3001 PRICING SCHEDULE &"Times New Roman,Regular"RFP No. FA5209-15-R-0013
PLICE LIST OPTION 4
| The following pricing schedule will be used to provide pricing information | ||||||
| OPTION 4 ( 1 Feb 18 thru 31 Jan 19) | ||||||
| CLIN | DESCRIPTION | UNIT | QTY | UNIT PRICE | TOTAL | |
| 1 | E001 | SCAFFOLDING: TUBULAR METAL, Top<10m HIGH | SM | 120 | ||
| 2 | E002 | SCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGH | SM | 120 | ||
| 3 | E003 | SCAFFOLDING: TUBULAR METAL, Top>25m HIGH | SM | 120 | ||
| 4 | E004 | SCAFFOLDING: INTERIOR HUNG INCL. SAFETY NET | SM | 120 | ||
| 5 | E005 | SCAFFOLDING: PORTABLE TRESTLE PLATFORM | SM | 120 | ||
| 6 | E006 | SCAFFOLDING: MOBILE SCAFFOLDING | SM | 120 | ||
| 7 | E007 | SHEET PROTECTION (WEATHER) | SM | 60 | ||
| 8 | E008 | CLEAN, HEPA VAC & WET WIPE | SM | 1,200 | ||
| 9 | E009 | PROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PW | SM | 100 | ||
| 10 | E010 | PROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PW | SM | 100 | ||
| 11 | E011 | INST/DEMO DECON CHAMBER | SM | 300 | ||
| 12 | E012 | PROTECT, FLOORS, 6 MIL POLY | SM | 300 | ||
| 13 | E013 | PROTECT, WALLS, 6 MIL POLY | SM | 300 | ||
| 14 | E014 | PROTECT, CEILINGS, 6 MIL POLY | SM | 300 | ||
| 15 | E015 | PROTECT, EQUIPMENT, 6 MIL POLY | SM | 200 | ||
| 16 | E016 | PROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLY | SM | 172 | ||
| 17 | E017 | DEMO, NON-ACM GWB | SM | 40 | ||
| 18 | E018 | DEMO, NON-ACM SUSPENDED CEILING | SM | 40 | ||
| 19 | E019 | DEMO, NON-ACM SUSPENDED CEILING, 2X GRID | SM | 40 | ||
| 20 | E020 | DEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4 | EA | 20 | ||
| 21 | E021 | DEMO, NON-ACM PARTITION, PLASTER | SM | 40 | ||
| 22 | E022 | DEMO, NON-ACM PARTITION, GWB | SM | 40 | ||
| 23 | E023 | DEMO, NON-ACM CARPET | SM | 180 | ||
| 24 | E024 | DEMO, ACM INSULATION, SPRAY-ON | SM | 100 | ||
| 25 | E025 | DEMO, ACM BOILER/HEATER INSULATION | SM | 100 | ||
| 26 | E026 | DEMO, ACM BOILER BREECHING/FLUE INSULATION | SM | 60 | ||
| 27 | E027 | DEMO, ACM DUCT OR AHU INSULATION | SM | 200 | ||
| 28 | E028 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2 | EA | 20 | ||
| 29 | E029 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2 | EA | 20 | ||
| 30 | E030 | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2 | EA | 20 | ||
| 31 | E031 | DEMO, ACM PIPE INSULATION, UP TO 100mm | LM | 40 | ||
| 32 | E032 | DEMO, ACM PIPE INSULATION, 101 TO 200 mm | LM | 40 | ||
| 33 | E033 | DEMO, ACM PIPE INSULATION, 201 TO 300 mm | LM | 40 | ||
| 34 | E034 | DEMO, ACM PIPE INSULATION, 301 TO 400 mm | LM | 40 | ||
| 35 | E035 | DEMO, ACM PIPE INSULATION, >400 mm | LM | 40 | ||
| 36 | E036 | DEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mm | LM | 20 | ||
| 37 | E037 | DEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mm | LM | 20 | ||
| 38 | E038 | DEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mm | LM | 20 | ||
| 39 | E039 | DEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mm | LM | 20 | ||
| 40 | E040 | DEMO, ACM PIPE INSULATION W/ PIPE, >400 mm | LM | 20 | ||
| 41 | E041 | DEMO, ACM PIPE FITTING INSULATION, UP TO 100 mm | EA | 20 | ||
| 42 | E042 | DEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mm | EA | 20 | ||
| 43 | E043 | DEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mm | EA | 20 | ||
| 44 | E044 | DEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mm | EA | 20 | ||
| 45 | E045 | DEMO, ACM PIPE FITTING INSULATION, >400 mm | EA | 20 | ||
| 46 | E046 | DEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mm | EA | 10 | ||
| 47 | E047 | DEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mm | EA | 10 | ||
| 48 | E048 | DEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mm | EA | 10 | ||
| 49 | E049 | DEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mm | EA | 10 | ||
| 50 | E050 | DEMO, ACM PIPE FITTING W/ INSULATION, >400 mm | EA | 10 | ||
| 51 | E051 | DEMO, ACM PIPE/FITTING INSULATION, GLOVE BAG | EA | 60 | ||
| 52 | E052 | DEMO, ACM CEMENTITIOUS MATL, FLAT SURFACE | SM | 30 | ||
| 53 | E053 | DEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACE | SM | 30 | ||
| 54 | E054 | DEMO, ACM CEILING SYSTEM, SOLID | SM | 240 | ||
| 55 | E055 | DEMO, ACM CEILING SYSTEM, LAY-IN | SM | 240 | ||
| 56 | E056 | DEMO, ACM FLOOR TILE/MASTIC | SM | 200 | ||
| 57 | E057 | DEMO, ACM WALL TILE/MASTIC | SM | 150 | ||
| 58 | E058 | DEMO, ACM CARPET/MASTIC | SM | 120 | ||
| 59 | E059 | DEMO, ACM COVE BASE/MASTIC | LM | 160 | ||
| 60 | E060 | DEMO, ACM BASE BOARD & MASTIC, GLOVE BAG | EA | 30 | ||
| 61 | E061 | DEMO, ACM WALL TILE & MASTIC, GLOVE BAG | EA | 30 | ||
| 62 | E062 | DEMO, ACM FLOOR TILE & MASTIC, GLOVE BAG | EA | 30 | ||
| 63 | E063 | DEMO, ACM WALL BOARD/TRANSITE/FINISH | SM | 40 | ||
| 64 | E064 | DEMO, ACM SOIL | CM | 2 | ||
| 65 | E065 | DISPOSAL, ACM COLLECT/BAG/TRANSPORT | CM | 20 | ||
| 66 | E066 | DISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREA | CM | 100 | ||
| 67 | E067 | DISPOSAL, NON-ACM COLLECT/TRANSPORT | CM | 6 | ||
| 68 | E068 | DISPOSAL, NON-ACM GWB COLLECT/TRANSPORT | CM | 6 | ||
| 69 | E069 | ENCAPSULATE, WALLS/CEILINGS/FLOOR | SM | 1,000 | ||
| 70 | E070 | ENCAPSULATE, BEAMS/COLUMNS/STRUCTURE | SM | 300 | ||
| 71 | E071 | ENCAPSULATE, PIPES, UP TO 300 mm | LM | 20 | ||
| 72 | E072 | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM, | EA | 400 | ||
| 73 | E073 | Sample/Analyze, Clearance Sample, Aggressive, TEM, | EA | 400 | ||
| 74 | E074 | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | EA | 300 | ||
| 75 | E075 | Sample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCM | EA | 300 | ||
| 76 | E076 | Demo, ACM Mortar (up to 30mm thickness) | SM | 20 | ||
| 77 | E077 | DEMO, ACM CONCREAT CORE DRILL < 200mm BREADTH | EA | 6 | ||
| 78 | E078 | DEMO, OTHER ACM CORE DRILL < 200mm BREADTH | EA | 10 | ||
| 79 | E079 | Electric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 days | EA | 10 | ||
| 80 | E080 | Electric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14days | EA | 10 | ||
| TOTAL AMOUNT FOR OPTION 4 PERIOD: | ||||||
| ABBREVIATIONS: | ||||||
| MH-MAN HOUR LF- LINEAR FOOT | ||||||
| SY-SQUARE YARD EA-EACH |
&"Times New Roman,Bold"EXHIBIT E FOR CLIN 4001 PRICING SCHEDULE &"Times New Roman,Regular"RFP No. FA5209-15-R-0013
PLICE LIST OPTION 5
| The following pricing schedule will be used to provide pricing information | ||||||
| OPTION 5 ( 1 Feb 20 thru 31 Jan 21) | ||||||
| CLIN | DESCRIPTION | UNIT | QTY | UNIT PRICE | TOTAL | |
| 1 | 5001AA | SCAFFOLDING: TUBULAR METAL, Top<10m HIGH | SM | 120 | ||
| 2 | 5001AB | SCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGH | SM | 120 | ||
| 3 | 5001AC | SCAFFOLDING: TUBULAR METAL, Top>25m HIGH | SM | 120 | ||
| 4 | 5001AD | SCAFFOLDING: INTERIOR HUNG INCL. SAFETY NET | SM | 120 | ||
| 5 | 5001AE | SCAFFOLDING: PORTABLE TRESTLE PLATFORM | SM | 120 | ||
| 6 | 5001AF | SCAFFOLDING: MOBILE SCAFFOLDING | SM | 120 | ||
| 7 | 5001AG | SHEET PROTECTION (WEATHER) | SM | 60 | ||
| 8 | 5001AH | CLEAN, HEPA VAC & WET WIPE | SM | 1,200 | ||
| 9 | 5001AJ | PROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PW | SM | 100 | ||
| 10 | 5001AK | PROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PW | SM | 100 | ||
| 11 | 5001AL | INST/DEMO DECON CHAMBER | SM | 300 | ||
| 12 | 5001AM | PROTECT, FLOORS, 6 MIL POLY | SM | 300 | ||
| 13 | 5001AN | PROTECT, WALLS, 6 MIL POLY | SM | 300 | ||
| 14 | 5001AP | PROTECT, CEILINGS, 6 MIL POLY | SM | 300 | ||
| 15 | 5001AQ | PROTECT, EQUIPMENT, 6 MIL POLY | SM | 200 | ||
| 16 | 5001AR | PROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLY | SM | 172 | ||
| 17 | 5001AS | DEMO, NON-ACM GWB | SM | 40 | ||
| 18 | 5001AT | DEMO, NON-ACM SUSPENDED CEILING | SM | 40 | ||
| 19 | 5001AU | DEMO, NON-ACM SUSPENDED CEILING, 2X GRID | SM | 40 | ||
| 20 | 5001AV | DEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4 | EA | 20 | ||
| 21 | 5001AW | DEMO, NON-ACM PARTITION, PLASTER | SM | 40 | ||
| 22 | 5001AX | DEMO, NON-ACM PARTITION, GWB | SM | 40 | ||
| 23 | 5001AY | DEMO, NON-ACM CARPET | SM | 180 | ||
| 24 | 5001AZ | DEMO, ACM INSULATION, SPRAY-ON | SM | 100 | ||
| 25 | 5001BA | DEMO, ACM BOILER/HEATER INSULATION | SM | 100 | ||
| 26 | 5001BB | DEMO, ACM BOILER BREECHING/FLUE INSULATION | SM | 60 | ||
| 27 | 5001BC | DEMO, ACM DUCT OR AHU INSULATION | SM | 200 | ||
| 28 | 5001BD | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2 | EA | 20 | ||
| 29 | 5001BE | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2 | EA | 20 | ||
| 30 | 5001BF | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2 | EA | 20 | ||
| 31 | 5001BG | DEMO, ACM PIPE INSULATION, UP TO 100mm | LM | 40 | ||
| 32 | 5001BH | DEMO, ACM PIPE INSULATION, 101 TO 200 mm | LM | 40 | ||
| 33 | 5001BJ | DEMO, ACM PIPE INSULATION, 201 TO 300 mm | LM | 40 | ||
| 34 | 5001BK | DEMO, ACM PIPE INSULATION, 301 TO 400 mm | LM | 40 | ||
| 35 | 5001BL | DEMO, ACM PIPE INSULATION, >400 mm | LM | 40 | ||
| 36 | 5001BM | DEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mm | LM | 20 | ||
| 37 | 5001BN | DEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mm | LM | 20 | ||
| 38 | 5001BP | DEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mm | LM | 20 | ||
| 39 | 5001BQ | DEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mm | LM | 20 | ||
| 40 | 5001BR | DEMO, ACM PIPE INSULATION W/ PIPE, >400 mm | LM | 20 | ||
| 41 | 5001BS | DEMO, ACM PIPE FITTING INSULATION, UP TO 100 mm | EA | 20 | ||
| 42 | 5001BT | DEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mm | EA | 20 | ||
| 43 | 5001BU | DEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mm | EA | 20 | ||
| 44 | 5001BV | DEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mm | EA | 20 | ||
| 45 | 5001BW | DEMO, ACM PIPE FITTING INSULATION, >400 mm | EA | 20 | ||
| 46 | 5001BX | DEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mm | EA | 10 | ||
| 47 | 5001BY | DEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mm | EA | 10 | ||
| 48 | 5001BZ | DEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mm | EA | 10 | ||
| 49 | 5001CA | DEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mm | EA | 10 | ||
| 50 | 5001CB | DEMO, ACM PIPE FITTING W/ INSULATION, >400 mm | EA | 10 | ||
| 51 | 5001CC | DEMO, ACM PIPE/FITTING INSULATION, GLOVE BAG | EA | 60 | ||
| 52 | 5001CD | DEMO, ACM CEMENTITIOUS MATL, FLAT SURFACE | SM | 30 | ||
| 53 | 5001CE | DEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACE | SM | 30 | ||
| 54 | 5001CF | DEMO, ACM CEILING SYSTEM, SOLID | SM | 240 | ||
| 55 | 5001CG | DEMO, ACM CEILING SYSTEM, LAY-IN | SM | 240 | ||
| 56 | 5001CH | DEMO, ACM FLOOR TILE/MASTIC | SM | 200 | ||
| 57 | 5001CJ | DEMO, ACM WALL TILE/MASTIC | SM | 150 | ||
| 58 | 5001CK | DEMO, ACM CARPET/MASTIC | SM | 120 | ||
| 59 | 5001CL | DEMO, ACM COVE BASE/MASTIC | LM | 160 | ||
| 60 | 5001CM | DEMO, ACM BASE BOARD & MASTIC, GLOVE BAG | EA | 30 | ||
| 61 | 5001CN | DEMO, ACM WALL TILE & MASTIC, GLOVE BAG | EA | 30 | ||
| 62 | 5001CP | DEMO, ACM FLOOR TILE & MASTIC, GLOVE BAG | EA | 30 | ||
| 63 | 5001CQ | DEMO, ACM WALL BOARD/TRANSITE/FINISH | SM | 40 | ||
| 64 | 5001CR | DEMO, ACM SOIL | CM | 2 | ||
| 65 | 5001CS | DISPOSAL, ACM COLLECT/BAG/TRANSPORT | CM | 20 | ||
| 66 | 5001CT | DISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREA | CM | 100 | ||
| 67 | 5001CU | DISPOSAL, NON-ACM COLLECT/TRANSPORT | CM | 6 | ||
| 68 | 5001CV | DISPOSAL, NON-ACM GWB COLLECT/TRANSPORT | CM | 6 | ||
| 69 | 5001CW | ENCAPSULATE, WALLS/CEILINGS/FLOOR | SM | 1,000 | ||
| 70 | 5001CX | ENCAPSULATE, BEAMS/COLUMNS/STRUCTURE | SM | 300 | ||
| 71 | 5001CY | ENCAPSULATE, PIPES, UP TO 300 mm | LM | 20 | ||
| 72 | 5001CZ | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM, | EA | 400 | ||
| 73 | 5001DA | Sample/Analyze, Clearance Sample, Aggressive, TEM, | EA | 400 | ||
| 74 | 5001DB | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | EA | 300 | ||
| 75 | 5001DC | Sample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCM | EA | 300 | ||
| 76 | 5001DD | Demo, ACM Mortar (up to 30mm thickness) | SM | 20 | ||
| 77 | 5001DE | DEMO, ACM CONCREAT CORE DRILL < 200mm BREADTH | EA | 6 | ||
| 78 | 5001DF | DEMO, OTHER ACM CORE DRILL < 200mm BREADTH | EA | 10 | ||
| 79 | 5001DG | Electric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 days | EA | 10 | ||
| 80 | 5001DH | Electric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14days | EA | 10 | ||
| TOTAL AMOUNT FOR OPTION 5 PERIOD: | ||||||
| ABBREVIATIONS: | ||||||
| MH-MAN HOUR LF- LINEAR FOOT | ||||||
| SY-SQUARE YARD EA-EACH |
&"Arial,Bold"&14EXHIBIT F PRICING SCHEDULE &"Times New Roman,Regular"RFP No. FA5209-15-R-0013
Page &P
Total Amount
| CLIN | BASIC | OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | TOTAL |
| 0001AA | ¥0 | ¥0 | ||||
| 0001AB | ¥0 | ¥0 | ||||
| 0001AC | ¥0 | ¥0 | ||||
| 0001AD | ¥0 | ¥0 | ||||
| 0001AE | ¥0 | ¥0 | ||||
| 0001AF | ¥0 | ¥0 | ||||
| 0001AG | ¥0 | ¥0 | ||||
| 0001AH | ¥0 | ¥0 | ||||
| 0001AJ | ¥0 | ¥0 | ||||
| 0001AK | ¥0 | ¥0 | ||||
| 0001AL | ¥0 | ¥0 | ||||
| 0001AM | ¥0 | ¥0 | ||||
| 0001AN | ¥0 | ¥0 | ||||
| 0001AP | ¥0 | ¥0 | ||||
| 0001AQ | ¥0 | ¥0 | ||||
| 0001AR | ¥0 | ¥0 | ||||
| 0001AS | ¥0 | ¥0 | ||||
| 0001AT | ¥0 | ¥0 | ||||
| 0001AU | ¥0 | ¥0 | ||||
| 0001AV | ¥0 | ¥0 | ||||
| 0001AW | ¥0 | ¥0 | ||||
| 0001AX | ¥0 | ¥0 | ||||
| 0001AY | ¥0 | ¥0 | ||||
| 0001AZ | ¥0 | ¥0 | ||||
| 0001BA | ¥0 | ¥0 | ||||
| 0001BB | ¥0 | ¥0 | ||||
| 0001BC | ¥0 | ¥0 | ||||
| 0001BD | ¥0 | ¥0 | ||||
| 0001BE | ¥0 | ¥0 | ||||
| 0001BF | ¥0 | ¥0 | ||||
| 0001BG | ¥0 | ¥0 | ||||
| 0001BH | ¥0 | ¥0 | ||||
| 0001BJ | ¥0 | ¥0 | ||||
| 0001BK | ¥0 | ¥0 | ||||
| 0001BL | ¥0 | ¥0 | ||||
| 0001BM | ¥0 | ¥0 | ||||
| 0001BN | ¥0 | ¥0 | ||||
| 0001BP | ¥0 | ¥0 | ||||
| 0001BQ | ¥0 | ¥0 | ||||
| 0001BR | ¥0 | ¥0 | ||||
| 0001BS | ¥0 | ¥0 | ||||
| 0001BT | ¥0 | ¥0 | ||||
| 0001BU | ¥0 | ¥0 | ||||
| 0001BV | ¥0 | ¥0 | ||||
| 0001BW | ¥0 | ¥0 | ||||
| 0001BX | ¥0 | ¥0 | ||||
| 0001BY | ¥0 | ¥0 | ||||
| 0001BZ | ¥0 | ¥0 | ||||
| 0001CA | ¥0 | ¥0 | ||||
| 0001CB | ¥0 | ¥0 | ||||
| 0001CC | ¥0 | ¥0 | ||||
| 0001CD | ¥0 | ¥0 | ||||
| 0001CE | ¥0 | ¥0 | ||||
| 0001CF | ¥0 | ¥0 | ||||
| 0001CG | ¥0 | ¥0 | ||||
| 0001CH | ¥0 | ¥0 | ||||
| 0001CJ | ¥0 | ¥0 | ||||
| 0001CK | ¥0 | ¥0 | ||||
| 0001CL | ¥0 | ¥0 | ||||
| 0001CM | ¥0 | ¥0 | ||||
| 0001CN | ¥0 | ¥0 | ||||
| 0001CP | ¥0 | ¥0 | ||||
| 0001CQ | ¥0 | ¥0 | ||||
| 0001CR | ¥0 | ¥0 | ||||
| 0001CS | ¥0 | ¥0 | ||||
| 0001CT | ¥0 | ¥0 | ||||
| 0001CU | ¥0 | ¥0 | ||||
| 0001CV | ¥0 | ¥0 | ||||
| 0001CW | ¥0 | ¥0 | ||||
| 0001CX | ¥0 | ¥0 | ||||
| 0001CY | ¥0 | ¥0 | ||||
| 0001CZ | ¥0 | ¥0 | ||||
| 0001DA | ¥0 | ¥0 | ||||
| 0001DB | ¥0 | ¥0 | ||||
| 0001DC | ¥0 | ¥0 | ||||
| 0001DD | ¥0 | ¥0 | ||||
| 0001DE | ¥0 | ¥0 | ||||
| 0001DF | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 0001DG | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 0001DH | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 |
&"-,Bold"&14SUMMARY
OF
Asbestos Surveys, Sampling and Abatement
YOKOTA AIR BASE&16