Attachment 5 Sample of Work Order Form

View the file

Other files

File Type Posted
Exhibits —
Amendment 0001 for FA5209-12-R-0002.pdf PDF
Addendum No. 1 for Spec._FA5209-12-R-0002.pdf PDF
Q A with SF 25.pdf PDF
Pre-Proposal Conference Minutes.pdf PDF
RFP FA5209-12-R-0002.pdf PDF
Contract Specification_Attachment 1.docx DOCX document
Past Performance Questionnaire_Attachment 4.doc DOC document
Cover Ltr for Questinnaire —
OF17.doc DOC document
Schedule of Material Submittals_Attachment 3.xlsx XLSX spreadsheet
Exhibits to RFP No. FA5209-12-R-0002.xlsx XLSX spreadsheet
List of GFM_Attachment 2.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Whole House Maintenance Work Order
Work Order NO:Page 1 of 2
Contractor:CONTRACT NO:
TASK ORDER NO:
Under the terms of the above contract, joint site survey was conducted for
Quarter No. ____________________ at __________________________ on _________________.
JOINT SURVEY: PRINT NAMESIGNATUREDATE
COR: _______________________________________________________________________________
CONTRACTOR: _______________________________________________________________________________
Based on the above joint site survey, the contractor hereby submits a price proposal for COR's review.
PRINT NAME SIGNATURE DATE

CONTRACTOR: ________________________ ___________________________________ _____________________

a. Itemb. Descriptionc. Quantityd. Unite. Unit Pricef. Amount
Interior Work
Interior Work Total
Exterior Work
Exterior Work Total
G/TOTAL:
Whole House Maintenance Work Order
Page 2 of 2
COR's Proposal Review: □ Approved □ Disapproved

PRINT NAME SIGNATURE DATE

COR:_________________________ _________________________________ ____________________

Under the terms of above contract, you are requested to perform the above items of work according to the contract specifications where quantities are shown in column c above.

The Interior work perforemance period will be from _____________ through _____________.

The Exterior work performance period will be from _____________ through _____________.

Inspection and Acceptance
Interior Work:
Final Inspection was requested on : ___________________
Final Inspection was conducted on : ___________________
□ Accepted □ Rejected
Exterior Work:
Final Inspection was requested on : ___________________
Final Inspection was conducted on : ___________________
□ Accepted □ Rejected
PRINT NAME SIGNATURE DATE
COR: _______________________________ _________________________________________ ______________
Remarks:
Contractor shall complete the punch list item(s) in the above "Remarks" block by ____________________.
Interior Work:
Inspection for re-performance was requested on: _____________________
Inspection for re-performance was requested on: _____________________
□ Accepted □ Rejected
Exterior Work:
Inspection for re-performance was requested on: _____________________
Inspection for re-performance was requested on: _____________________
□ Accepted □ Rejected
PRINT NAME SIGNATURE DATE
COR: _______________________________ _________________________________________ ______________
Remarks: