Schedule of Material Submittals

View the file

Other files

File Type Posted
Amendment 0001_FA5209-110R-0013.pdf PDF
Project X-11-800_Question Answer2.xls XLS spreadsheet
Project X-11-800_Question Answer dated 9 Jun 11.xls XLS spreadsheet
Question and Answer.pdf PDF
e. Cover Ltr for Questionnair.pdf PDF
a-3. Solicitation_SF1442.pdf PDF
b. Spec X-11-800.pdf PDF
a-2. Policies and Procedures for Doing Business with U.S. Government.pdf PDF
a-1. DD Form 1707.pdf PDF
d. Questionnaire X-11-800.doc DOC document
f. OF17.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

submittal

MACC-D TECHNICAL PROPOSAL SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NO.
X-11-800Renovate Building S-1275FA5209-11-R-0013
TO BE COMPLETED BY PROJECT ENGINNERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
WORK PROCEDUREPLANSCATALOG DATASHOP DRAWINGSSAMPLES /COLOR SELECTIONSINSTALLATIONINSTRUCTIONSOPERAT. / MAINT.INSTRUCTIONSCERTIFICATIONS /LICENSESCALCULATON SHEETSTEST REPORTSOTHERSDATECONTRAC-
ITEM OR DESCRIPTIONREQUIREDDATEDATE TORETURNFOLLOW-UPCONTRACTORTOR RE-FINALREMARKS
OF ITEM, CONTRACTSUBMISSIONRECEIVEDCIVILSUSPENSENOTIFIEDSUBMIT-APPROVAL
REFERENCE, TYPE OFDATEIN CONT-ENGINEER-DATETAL
SUBMITTALRACTINGINGDIS-
APPROVEDAPPROVED
1SECTION 01 11 00XA or E
1.9.2 Safety *
2SECTION 01 11 00XA or E
1.9.3 Environmental **
3SECTION 01 11 00XA
1.9.4 SSHO
4SECTION 01 11 00XA
2.1 Memo for HM Usage
5SECTION 01 11 00XA
1.9.5 Site Manager
6SECTION 01 11 00XD
1.16.1 As Built Drawing
7SECTION 01 74 19XA
1.6 Waste Managt Plan**
8SECTION 01 74 19XD
1.7 Manifest
9SECTION 02 41 00XA or E
1.8 Dem / Deconst Plan
10SECTION 02 82 14XA or E
1.6 Accident Prevent Plan
11SECTION 02 82 14XA or E
1.10 Training Program
12SECTION 02 82 14XA or E
1.3 Detailed Drawings
13SECTION 02 82 14XA
1.13 Personal Protec Equip
14SECTION 02 82 14XA
1.19 Expendable Supplies
15SECTION 02 82 14XA
1.4 Qualifications
16SECTION 02 82 14XD
3.10.3 WgtBill&DelivTicket
17SECTION 02 82 14XD
3.10.4.1 Shipment Records
18Section 02 82 33XA or E
1.6.2.2 LBP Removal/Control Plan
19Section 02 82 33XA or E
1.4 Occupant Protection Plan
20Section 02 82 33XA
1.7 Materials and Equipment
21Section 02 82 33XC
1.6.2.3 Occup&Env Sample
22Section 02 82 33XD
3.4.1 Test
23Section 02 82 33XA
1.6.1.1 Qualifications of CP
24Section 02 82 33XA
1.6.1.2 Testing Laboratory
25Section 02 82 33XA
3.5.1.1 Clearance Certificate
26Section 02 82 33D
3.5.2.1 Haz Waste Manifest
27Section 02 82 33D
3.6 Abatement Report
28SECTION 03 30 00XA or E
1.4.1 Reinforcing Steel
29SECTION 03 30 00XA
2.1.1 Mix Design
30SECTION 03 30 00XA
2.2.1 Cement
31SECTION 03 30 00XA
2.2.4 Admixtures
32SECTION 03 30 00XA
2.3 Reinforcement
33SECTION 03 30 00XA
2.4 Joint Filler
34SECTION 03 30 00XA
2.2.3 Aggregates
35SECTION 03 30 00XC
3.9.1.1 Slump Tests
36SECTION 03 30 00XC
3.9.1.2 Comp Strength Tests
37SECTION 03 30 00XC
3.9.1.3 Air Content
38SECTION 03 30 00XC
3.9.1.4 Ion Concentration
39SECTION 05 40 00XA or E
1.4.1 Framing Components
40SECTION 05 40 00XA
2.1 Framing Component
41SECTION 06 10 00XA
2.2 Certificates of Grade
42SECTION 06 20 00XA
1.3 Certificates of Grade
43SECTION 06 41 16XA or E
1.4.2 Shop Drawings
44SECTION 06 41 16XA or E
3.1 Installation
45SECTION 06 41 16XA
2.1 Wood Materials
46SECTION 06 41 16XA
2.9 Wood Finishes
47SECTION 06 41 16XA
2.10.8.3 Finish Schedule
48SECTION 06 41 16XA
2.2 Plastic Laminates
49SECTION 07 21 16XA
2.1 Blanket Insulation
50SECTION 07 21 16XA
2.2 Pressure Sensitive Tape
51SECTION 07 21 16XA
2.3 Accessories
52SECTION 07 42 13XA
2.2 Wall Panels
53SECTION 07 42 13XA
2.3 Accessories
54SECTION 07 42 13XA
2.4 Fasteners
55SECTION 07 42 13XA
1.5.1 Qual of Manufacturer
56SECTION 07 42 13XA
1.5.2 Qual of Contractor
57SECTION 07 42 13XD
1.8 Warranties
58SECTION 07 60 00XA
2.1 Flashing
59SECTION 08 11 13XA or E
2.1 Doors
60SECTION 08 11 13XA or E
2.3 Frames
61SECTION 08 11 13XA
2.5 Finishes
62SECTION 08 11 16XA or E
1.4.1 Doors
63SECTION 08 11 16XA or E
1.4.1 Frames
64SECTION 08 11 16XA
1.4.2.1 Finish
65SECTION 08 14 00XA or E
2.1 Doors
66SECTION 08 51 13XA or E
1.7 Fabrication Drawings
67SECTION 08 51 13XA
2.1 Blast Resistant Window
68SECTION 08 51 13XC
2.1 Structural Blast Calc
69SECTION 08 51 13XA
1.8 QualofWelders&Weld Op
70SECTION 08 71 00XA
2.2 Hardware Items
71SECTION 08 71 00XA
3.1 Installation
72SECTION 09 22 00XA
2.1 Metal Support Systems
73SECTION 09 29 00XA
2.1.1 Gypsum Board
74SECTION 09 29 00XA
2.1.2 Joint Treatment Mat
75SECTION 09 29 00XA
2.2 Access Panels
76SECTION 09 29 00XA
2.1.4 MSDS
77SECTION 09 30 00XA or E
1.4 Detail Drawings
78SECTION 09 30 00XA
2.1 Prcelain Tile
79SECTION 09 30 00XA
1.8 Samples
80SECTION 09 65 00XA
2.1 Vinyl Composition Tile
81SECTION 09 65 00XA
2.2 Wall Base
82SECTION 09 65 00XA
2.3 Adhesives
83SECTION 09 65 00XA
1.7 Samples
84SECTION 09 90 00XA
2.1 Coating
85SECTION 09 90 00XA
1.8 Color and Texture
86SECTION 09 90 00XA
1.4 MSDS
87SECTION 10 21 13XA or E
1.2 Fabrication Drawings
88SECTION 10 21 13XA or E
3.2 Installation Drawings
89SECTION 10 21 13XA
2.2.1 Enclosures and Doors
90SECTION 10 21 13XA
2.2.2 Sliding Door
91SECTION 10 21 13XA
2.4 Colors and Finishes
92SECTION 10 28 13XA
2.1 Accessory Items
93SECTION 22 00 00XA
2.1.1 Pipe Materials
94SECTION 22 00 00XA
2.1.2 Pipe Joints
95SECTION 22 00 00XA
2.1.4 Miscellaneous Materials
96SECTION 22 00 00XA
2.1.5 Pressure Gauge
97SECTION 22 00 00XA
2.1.6 Measuring Devices
98SECTION 22 00 00XA
2.2 Valves
99SECTION 22 00 00XA
2.3 Fixtures and Faucets
100SECTION 22 00 00XA
2.4 Traps
101SECTION 22 00 00XA
2.5 Water Heaters
102SECTION 22 00 00XA
2.6 Septic Tank
103SECTION 22 00 00XA
2.7 Pumps
104SECTION 22 00 00XA
2.8.3 Valve Boxes
105SECTION 22 00 00XA
2.8.4 Valve Pits / Manhole
106SECTION 22 00 00XA
2.8.5 Manhole Cover
107SECTION 22 00 00XA
2.8.7 Marker
108SECTION 22 00 00XA
2.8.8 Faucet & Faucet Stand
109SECTION 22 00 00XD
3.9 Field Test
110SECTION 23 00 00XA or E
1.2.1 Diagrams
111SECTION 23 00 00XA or E
1.4.2 Detail Drawings
112SECTION 23 00 00XA
2.6 Duct Systems
113SECTION 23 00 00XA
2.7.1.1 Centrifugal Fans
114SECTION 23 00 00XA
2.8 Energy Recovery Devices
115SECTION 23 00 00XD
3.8 Performance Tests
116SECTION 23 00 00XA
3.2 Installation Instructions
117SECTION 23 00 00XD
3.10 O&M Manuals
118SECTION 23 07 00XA
2.1.1 Supports
119SECTION 23 07 00XA
2.1.2 Sealants
120SECTION 23 07 00XA
2.2 Pipe Insulation
121SECTION 23 81 43XA or E
1.2 Control Diagrams
122SECTION 23 81 43XA
1.4 Equip Performance Data
123SECTION 23 81 43XA
2.1 System Unit
124SECTION 23 81 43XA
2.2 Filters
125SECTION 23 81 43XA
2.3.1 Pipe
126SECTION 23 81 43XA
2.4 Vibration Isolation
127SECTION 23 81 43XA
2.5 Controls and Instrument
128SECTION 23 81 43XD
3.3 Pressure Tests
129SECTION 23 81 43XD
3.3 System Tests
130SECTION 23 81 43XD
3.3 Operating Tests
131SECTION 23 81 43XA
3.3 Instructions
132SECTION 23 81 43XD
3.4 O&M Manuals
133SECTION 26 20 00XA or E
1.5 Fabrication Drawings
134SECTION 26 20 00XA or E
2.8 Panelboards
135SECTION 26 20 00XA or E
2.9 Cubicle
136SECTION 26 20 00XA
2.2 Conduit
137SECTION 26 20 00XA
2.4 Boxes and Fittings
138SECTION 26 20 00XA
2.5 Wire and Cable
139SECTION 26 20 00XA
2.6 Sensors and Switches
140SECTION 26 20 00XA
2.7 Receptacles
141SECTION 26 20 00XA
2.8.3 Circuit Breakers
142SECTION 26 20 00XA
2.8.4 Step-Down Trans
143SECTION 26 20 00XA
2.8.5 Multi-Digital Meter
144SECTION 26 20 00XA
2.10 Transformers
145SECTION 26 20 00XA
2.11 Manhole and Handhole
146SECTION 26 20 00XD
3.3.2 600-volt Wiring Test
147SECTION 26 20 00XD
3.3.3 Grounding System Test
148SECTION 26 51 00XA
1.4.1 Electronic Ballasts
149SECTION 26 51 00XA
2.1 Lighting Fixtures
150SECTION 26 51 00XA
2.1.1 Fluorescent Lamps
151SECTION 26 51 00XA
2.2 LED Lighting Fixtures
152SECTION 26 51 00XA
2.4.1 Photocell Switches
153SECTION 26 51 00XA
2.4.2 Motion Sensors
154SECTION 26 51 00XD
3.2 Operating Test
155SECTION 28 31 00XA or E
2.1 Control Panel
156SECTION 28 31 00XA
2.2 Storage Batteries
157SECTION 28 31 00XA
2.4.1 Manual Stations
158SECTION 28 31 00XA
2.4.2 Notification Appliances
159SECTION 28 31 00XA
2.5.1 Heat Detectors
160SECTION 28 31 00XA
2.5.2 Smoke Detectors
161SECTION 28 31 00XD
3.3 Testing
162SECTION 28 31 00XA
1.2.3 Qualifications
163SECTION 31 23 00XA or E
1.5.1 Shoring &Sheeting Plan
164SECTION 31 23 00XD
3.9.1.1 Density Tests
165SECTION 32 11 23XA
1.6 Plant, Equip, and Tools
166SECTION 32 11 23XA
1.4.1.1 Sieve Analysis
167SECTION 32 11 23XA
1.4.1.2 Lqd Lim & Plast Index
168SECTION 32 11 23XA
1.4.1.3 Wear Test
169SECTION 32 11 23XD
1.4.1.4 Compaction Test
170SECTION 32 11 23XD
1.4.1.5 Thickness Test
171SECTION 32 12 16XA
2.4 Mix Design
172SECTION 32 12 16XA
1.6 Calibration
173SECTION 32 12 16XA
2.1 Aggregates
174SECTION 32 12 16XA
2.2 Asphalt Cement Binder
175SECTION 32 12 16XA
2.3 Prime Coat & Tack Coat
176
177
178
179
180

&LSUBMISSION DATE:

A. W/in 15days after AWD / NTP whichever later B. Prior to commencement of applicable work C. W/in 5days after commencement of appl. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

* Safety Office Only ** Env. Div Only&R