Attachment A2.1.
Text of this file
Equipment List
| A2.1. Plant Equipments | ||
| Gas Engine | ||
| No. of Equipment | 2 ea | |
| Type | Water cooled, 4 cycle, Plug ignition type | |
| Model | 12NHLG-ST | |
| Rating of the out-put power | 647 kw | |
| Rating of the revolutions per minute | 1500 min⁻ˡ | |
| No. of cylinders, locations | 12 cylinders, "V" locate | |
| Cylinder dia x stroke | 165 x 185 mm | |
| Stroke capacity | 47.47 liter | |
| Averaged effectively pressure | 1.09 Mpa | |
| Averaged piston speed | 9.25 m/s | |
| Direction of the revolution | Left revolution, view from the generator | |
| Lubricant oil | GM40 | |
| Stored capacity of lubricant oil | Max.487 liter, Min.291 liter | |
| Stored capacity of cooling water | 90 liter | |
| Engine Start | Automatically or remote controlled cell-motor | |
| Engine Stop | Automatically or remote manually controlled fuel stop | |
| Lubricant oil circulation system | Powered circulation by the gear pump | |
| Engine cooling system | Powered circulation by the cooling pump | |
| Supercharger | Exhaust gas turbine | |
| Vibration Protection | Air spring type protector | |
| Gas consumption | 128.7 +5% m³N/Hr | |
| Lubricant oil consumption | 1.08 g/kW·Hr | |
| An overload proof stress | 110% within 30minutes | |
| An overspeed proof stress | 110% within 1minute | |
| Manufacture Date | ||
| Maker | YANMAR | |
| Alternating Current Generator | ||
| No. of Equipment | 2 ea | |
| Model | GFC1355E-4 | |
| Capacity | 625 kVA | |
| Voltage | 6,600 V | |
| Rotary Speed | 1,500 min¯¹ | |
| Phase ·Frequency | 3Ø, 50Hz | |
| Power Factor | 0.8 | |
| Excitation Type | Brush-less | |
| Weight | 1,870 kg | |
| Maker | JM&G | |
| Exhaust Gas Boiler (Hot Water) | ||
| No. of Equipment | 2 ea | |
| Model | ECW-G29-8-11 | |
| Operating Pressure | 98 kPa | |
| Max Capacity | 294 kW | |
| Max Temperature | 120ºC | |
| Heating Surface | 7.89 M² | |
| Manufacture Date | Oct 2003 | |
| Maker | MIURA Boiler | |
| Panel Type Heat Exchanger (HE-2) | ||
| No. of Equipment | 2 ea | |
| Model | LX-125A-TNHJ-15 | |
| Max Usable Pressure | 1.00 MPaG (Both A&B sides) | |
| Max Usable Temperature | 99.00ºC (Both A&B sides) | |
| Holding Capacity | 7.8 liters | |
| Heating Surface | 2.6 M² | |
| Weight | 320 kg | |
| Manufacture Date | Oct 2003 | |
| Maker | HISAKA Seisakusho | |
| Panel Type Heat Exchanger (HE-3) | ||
| No. of Equipment | 2 ea | |
| Model | LX-115A-TNHJ-29 | |
| Max Usable Pressure | 1.00 MPaG (Both A&B sides) | |
| Max Usable Temperature | 99.00ºC (Both A&B sides) | |
| Holding Capacity | 15.6 liters | |
| Heating Surface | 5.4 M² | |
| Weight | 340 kg | |
| Manufacture Date | Oct 2003 | |
| Maker | HISAKA Seisakusho | |
| Cooling Water Circulation Pump (PCD-1-1) | ||
| No. of Equipment | 2 ea | |
| Model | 65LPD 55.5A | |
| Capacity | 583 liter/min | |
| Head | 26 M | |
| Motor | 200V, 20.8A, 5.5 kw, 50Hz | |
| Manufacture Date | Dec 2003 | |
| Maker | EBARA | |
| Jacket Hot Water Circulation Pump (PH-1-1) | ||
| No. of Equipment | 2 ea | |
| Model | 80LPD 57.5A | |
| Capacity | 750 liter/min | |
| Head | 31 M | |
| Motor | 200V, 29.6A, 12 kw, 50Hz | |
| Manufacture Date | Dec 2003 | |
| Maker | EBARA | |
| WAX Type Temperature Control Valve | ||
| No. of Equipment | 2 ea | |
| Model & Type | L1 | |
| Size | 80A | |
| Temperature | 25 / 35 ºC | |
| Manufacture Date | Sep 2003 | |
| Maker | TEIPI Thermal Engineering | |
| 3 - Way Modutrol Valve | ||
| No. of Equipment | 4 ea | |
| Type | M904F1076 | |
| Volts | DC 24V | |
| Hz | 50 - 60 | |
| Watts | 17 | |
| DEG. | 160 | |
| SEC | 60 | |
| Maker | YAMATAKE |
&CA2.1-&P
Sheet2
Sheet3
Other files
| File | Type | Posted |
|---|---|---|
| A2-2 SFHA Co-Gene Plant.pdf | ||
| Appendix A-4, A-5 Final.xls | XLS spreadsheet | |
| Notice to Offerors.pdf | ||
| B1 Maintenance Report | — | |
| Solicitation 09-T0045.pdf | ||
| A1-D-Maint | — | |
| Government Policy Letter signed by Lt Col Debreczeni.pdf | ||
| A3-D-(Maintenance Schedule) | — | |
| PWS Final 09-T0045.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .