Paragraph / Section Question Requested Clarification Response
| 1 PWS General 1.0 | Scope Is | this | a | new | requirement | or | a | follow‐on | requirement? |
| Please | clarify | whether | this | requirement | is | new | or | a | |
| follow‐on | and | identify | any | challenges | with | the | | | |
| incumbent | arrangement. | | | | | | | | |
This is a new requirement.
| 2 Solicitation General 1.0 | Scope Is | there | an | incumbent | contractor | currently | performing |
| IMPS | services | at | Misawa | AB? | | | |
| If | so, | please | identify | the | incumbent | contractor | and |
| contract | number. | | | | | | |
| Since | this | is | a | new | requirement, | there | is | no | incumbemt | contractor. | However, | similar | work | is |
| being | performed | on | a | smaller | scope | under | the | below | contracts: | | | | | |
| FA520525F0123 | ‐ | 1 | each | SSM | | | | | | | | | | |
| FA520525P0071 | ‐ | One | time | CST | service | | | | | | | | | |
3 Solicitation General 1.0 Scope Is a Facility Clearance (FCL) required for this contract?
| If | required, | please | specify | the | clearance | level | | |
| (Secret, | TS, | TS/SCI). | Additionally, | if | a | Facility | | |
| Clearance | is | required | and | the | contractor’s | facility | | |
| is | currently | cleared | at | the | Secret | level, | will | the |
| Government | sponsor | the | contractor | for | the | | | |
| appropriate | Facility | Clearance | upgrade, | if | | | | |
necessary?
| IAW | the | PWS: | | | | | | | | | | | |
| 2.3.2.1 | The | SSM | must | possess | and | maintain | a | US | TOP | SECRET | (TS) | clearance. | |
| 2.3.3 | The | CST | must | possess | and | maintain | a | US | TOP | SECRET | (TS) | clearance. | |
| 2.3.4 | The | CAGs | must | possess | and | maintain | a | minimum | of | a | US | SECRET | clearance. |
| 2.3.5 | The | AE | must | possess | and | maintain | a | US | TOP | SECRET | clearance. | | |
Additionally see 5.4.8 Clearance Requirements in the PWS.
| The | US | Government | will | not | sponsor | new | investigations. | The | Contractor | is | responsible | to | pocess |
| and | maintain | a | TS | facility | clearance | along | with | provide | personnel | with | required | clearances. | |
4 PWS 5–6 2.1.2 What is the anticipated peak staffing level for CSTs and CAGs?
| Please | confirm | expected | staffing | ranges | for | normal |
| and | surge | operations. | | | | |
The anticipated peak staffing levels are as follows:
| SSM | ‐ | TBD | | |
| CST | ‐ | 11 | | |
| CAG | ‐ | 6 | | |
| A/E | ‐ | 1 | (if | requested) |
5 PWS 6 2.1.3 How frequently does the Government anticipate surge requirements?
| Please | clarify | whether | surge | support | is | expected | to |
| be | recurring | or | infrequent. | | | | |
| Surge | support | is | not | anticipated | to | occur | and | if | it | should | occur | it | is | anticipated | to | be | infrequent. |
| The | demand | for | support | is | driven | by | construction | schedule | which | wil | be | provided | to | contractor. | | | |
| What | base | level | of | effort | does | the | Government | |
| anticipate? | Please | clarify | the | context | of | the | annual | firm‐ |
| fixed‐price | structure. | | | | | | | |
| For | example, | the | solicitation | allows | for | task | orders, | |
| overlapping | projects, | surge | staffing, | and | variable | | | |
| construction | schedules | but | does | not | state | what | the | |
| Government | assumes | as | a | baseline | in | terms | of | number |
| of | concurrent | projects, | typical | staffing | levels | (CAGs, | | |
| CSTs, | and | SSMs), | or | expected | duty | hours. | | |
| The | USG | anticipates | awarding | a | FFP | IDIQ | contract. | This | will | allow | for | task | orders | for | support |
| based | on | Construction | schedule. | The | Contruction | will | be | the | baseline | and | is | still | in | development, | |
| but | will | be | shared | with | contractor. | | | | | | | | | | |
| 7 PWS 8–9 2.3.2 Are | Site | Security | Managers | required | to | be | dedicated |
| per | project? | | | | | | |
| Please | clarify | whether | one | SSM | may | oversee |
| multiple | concurrent | projects. | | | | |
| The | verbiage | in | the | PWS | has | been | changed. | | SSM | is | not | currently | expected, | but | may | be | required. | |
| This | will | be | project | dependent. | | However, | the | awardee | will | be | required | to | have | the | ability | to | | |
| hire | an | SSM | if | it | is | deemed | necessary | and | will | provide | the | wage | rates | for | the | SSM | to | determine |
| fair | and | reasonable | pricing | and | avialbility. | | | | | | | | | | | | | |
| If | a | SSM | is | required | the | contractor | will | be | given | reasonale | time | to | source | personnel | and | that | SSM |
| may | be | required | to | work | more | than | one | proejcts. | | | | | | | | | |
8 PWS 18 3.1 Are all inspection and surveillance tools contractor‐ furnished?
| Please | confirm | whether | any | Government‐ |
| furnished | equipment | will | be | provided. |
No Government‐furnished equipment will be provided.
| 2.1.1.2 | | The | mobilization | consists | of | providing | all | equipment, | and | materials | needed | for |
| performance, | to | include | the | Access | Control | Facility | (ACF) | and | Secure | Storage | Area | (SSA). |
| 9 PWS 10 2.3.5 How | will | Acoustical | Engineer | services | be | exercised? Please | clarify | whether | AE | support | will | be | task‐ |
| order | specific | and | estimate | annual | usage. | | | | | | | | |
| AE | will | be | exercised | on | a | task | order | basis. | Currently, | we | estimate | that | the | AE | may | only | be |
| needed | for | about | three | (3) | months | toward | the | end | of | the | overall | project. | | | | | |
10 Solicitation When is the anticipated RFP release Anticipated solicitation date is on or before 01 Mar 2026.
11 Solicitation 7 Delivery Schedule What is the anticipated contract award date? Please provide an estimated award and Notice to
Proceed timeline. Anticipated award date is 01 Aug 2026. Anticipated Work start date is 01 Sep 2026.
12 Solicitation N/A Post‐Award Will debriefings be provided upon request? Please confirm availability of post‐award debriefings.
| Debriefings | will | be | provided | upon | request | IAW | FAR | 15.506 | Postaward | debriefing | of | offerors. | | | | | |
| (a) | (1) | An | offeror, | upon | its | written | request | received | by | the | agency | within | 3 | days | after | the | date |
| on | which | that | offeror | has | received | notification | of | contract | award | in | accordance | with | 15.503(b), | | | | |
| shall | be | debriefed | and | furnished | the | basis | for | the | selection | decision | and | contract | award. | | | | |
| Housing | Responsibility: | Can | the | Government | confirm | | |
| whether | the | contractor | is | responsible | for | housing | |
| contractor | personnel, | or | if | housing | will | be | Government‐ |
furnished?
The contractor will be responsible for housing
| Availability | of | On‐Base | Housing: | If | Government‐ | | |
| furnished | housing | is | available, | will | on‐base | housing | at |
| Misawa | Air | Base | be | made | available | to | contractor |
personnel?
Government‐furnished housing is not available
| Pricing | of | Housing | Costs: | If | contractor‐provided | | | | |
| housing | is | required, | can | the | Government | clarify | where | | |
| housing‐related | costs | should | be | reflected | within | the | | | |
| two | pricing | worksheets, | including | whether | such | costs | | | |
| should | be | embedded | in | labor | rates | or | priced | as | a |
| separate | cost | element? | | | | | | | |
Housing‐related costs should be embedded in labor rates
16 Solicitation
| Under | “Past | Performance”, | the | draft | solicitation | | | | |
| document | currently | states | the | following | “Offeror | shall | | | |
| provide | a | listing | of | any | recent | and | relevant | contracts | of |
| similar | scope. | List | shall | consist | of | the | following | format | |
| project | title, | contract | number, | contract | dollar | value, | | | |
| location, | if | work | was | done | with | a | certified | Kardex | |
| installer | and | if | any | quality | issues. | This | is | the | minimum |
requirement.
| It | is | unclear, | based | on | the | current | wording, | if | Offerors |
| are | required | to | have | experience | with | a | certified | | |
| Kardex | installer | in | order | to | qualify | under | the | bid | |
| evaluation | criteria. | As | this | is | a | very | specific | | |
| requirement | that | many | otherwise | qualified | Offerors | | | | |
| might | not | have, | we | respectfully | ask | that | you | remove | |
| this | language | from | the | final | RFP. | | | | |
Is the verbiage in red necessary for evaluation?
If yes, why?
If no, the verbiage should be deleted.
This verbiage was not necessary and has been removed.
| 17 Solicitation Are | there | any | additional | details | on | surveillance |
| requirements | under | ICD‐705? No | additional | details | on | survelliance |
18 Solicitation Whether further industry engagement is planned. At this time, additional industry engagement is not planned unless requested by interested parties.
| Are | task | orders | intended | to | stay | strictly | within | the |
| IMPS | scope | described | in | the | Draft | PWS? | Or | will |
| additional | facilities, | expanded | technical | security | | | | |
| functions, | or | added | construction/infrastructure | | | | | |
| requirements | be | introduced | without | contract | | | | |
| modifications? | The | task | order | scope | boundaries | may | | |
| benefit | from | additional | clarity. | | | | | |
| Task | orders | are | expected | to | stay | within | the | scope | of | this | requirement. | The | type | of | work |
| required | will | remain | the | same. | However, | IMPS | service | may | be | requested | for | other | facilities | | |
| based | on | the | construction | schedule | of | performance. | | | | | | | | | |
| The | Draft | PWS | references | acoustic | engineering, | | |
| TEMPEST, | and | TSCM | activities, | but | it | is | unclear |
| whether | contractor | responsibility | is | limited | to | testing | |
| and | reporting | or | if | remediation | support, | coordination | |
| with | construction | teams, | or | retesting | is | expected | when |
| issues | are | identified. | The | depth | of | technical | security |
| responsibility | may | benefit | from | further | definition. | | |
| AE's | responsibilities | have | been | updated | throughout | PWS: | | | | | | | | |
| • | Testing | and | reporting. | If | remediation | support | is | necessary, | coordinate | with | SSM | to | correct | any |
| found | discrepancies. | Retesting | is | required | until | the | discrepancies | are | resolved | and | is | in | full | |
| compliance | with | ICD‐705. | | | | | | | | | | | | |
| • | Report | any | discrepancies | within | their | areas | of | responsibility | to | the | SSM. | | | |
| • | Retesting | is | expected | to | be | performed | when | issues | are | identiϐied | until | they | are | resolved. |
| Please | confirm | whether | the | SSM | has | stop‐work | | |
| authority | for | security | violations | or | reporting | authority | | |
| only, | with | direction | coming | from | the | COR | or | other |
| Government | officials. | The | Site | Security | Manager’s | | | |
| authority | may | benefit | from | further | clarity. | | | |
| SSM | has | authority | to | immediately | intervene | to | prevent | an | incident | or | security | violations. | They |
| also | have | reporting | authority | and | must | notify | appoint | USG | reps | immediately. | | | |
22 SOLICITATI
ON page 39
| Evaluation | criteria | stats | "The | Government | will | award | a |
| contract | resulting | from | this | solicitation | to | the | |
| responsible | offeror | whose | offer | conforming | to | the | |
| solicitation, | will | be | the | most | advantageous | to | the |
| Government | and | represents | the | best | value | to | the |
| Government | in | terms | of | technical | capability, | past | |
| performance | and | price.” | | | | | |
| However, | all | evaluations | will | be | either | acceptable | or |
| unacceptable, | which | is | used | for | Lowest | Price | |
| Technically | Acceptable | (LPTA). | FAR | 12.602 | states | | |
| "Fully | document | the | rationale | for | selection | of | the |
| successful | offeror | including | discussion | of | any | trade‐ | |
offs considered.”
| Will | the | government | please | confirm | is | this | is | a | best |
| valuation | or | LPTA | evaluation? | | | | | | |
| If | best | value, | will | the | government | please | identify |
| how | the | government | will | select | the | successful | |
| offeror | including | discussion | of | any | trade‐offs | | |
considered?
| This | is | not | an | LPTA | evaluation. | Evaluation | will | be | based | on | best | value | as | stated | in | FA | 52.212‐2. | The | USG |
| does | not | anticipate | conducting | discussions | at | this | time. | | | | | | | | | | | | |
| The | Draft | Solicitation | states, | “Technical | Capability | and | | |
| Past | Performance | have | been | determined | to | be | of | equal |
| importance | to | price. | The | Government | will | award | a | |
| contract | resulting | from | this | solicitation | to | the | | |
| responsible | offeror | whose | offer | conforming | to | the | | |
| solicitation, | will | be | the | most | advantageous | to | the | |
| Government | and | represents | the | best | value | to | the | |
| Government | in | terms | of | technical | capability, | past | | |
| performance | and | price.” | | | | | | |
| How | will | the | Government | rank | price | specifically? | |
| For | example, | will | the | Government | rank | all | |
| technically | acceptable | proposals | in | order | of | price | |
| and | choose | the | lowest | price | that | is | technically |
acceptable?
| The | USG | will | rank | all | technically | acceptable | offers | by | price | and | evaluate | for | fair | and | reasonabless. | |
| Award | can | be | anticipated | to | a | proposal | that | conforms | to | and | meets | all | the | technical | and | past |
| performance | requirements | at | the | lowest | fair | and | resonable | price | that | provides | the | USG | the | best | value. | |