Exhibit A
| Exhibit A |
| ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT |
| MISAWA AB, JAPAN |
| REQUEST FOR PROPOSAL No.FA520523R0007 |
| CONTRACT No. |
Offeror (Print Name, Title and Signature) Date Corporate Seal (Han)
Company Name and Address
| Category | ELIN A | Description | Estimated | ||
| Quantity | Unit of Issue | Unit Price | |||
| ¥ | Estimated Amount |
| Survey | 001 | Quantity Survey of Current Condition for Pavement and Construction Area, One Section per extension 10 m. | 200 | LOT | |
| and Test | 002 | Core Drilling and Sampling of AC or Concrete Pavement of Roads, Parking Lots, and Other Surfaces | 20 | EA | |
| 003 | Test Digging of AC Pavement, not to exceed 1m x 1m x 1m includes temporary pavement restoration | 20 | EA | ||
| 004 | Field CBR and Laboratory Tests of Roads, Parking Lots and Other Surfaces | 4 | EA | ||
| General | 005 | Construct Formwork for concrete work | 600 | SM | |
| Construction | 006 | Construct Steel Reinforcement Bar | 2 | MTON | |
| and | 007 | Frost Inhibition Course (RC-40) | 50 | CM | |
| Other Work | 008 | Leveling Basis Crushed stone (RC-40,Average thickness 30mm) | 60 | CM | |
| 009 | Construct Basis Crushed stone (RC-40) | 10 | CM | ||
| 010 | Place Concrete (21-8-25) | 70 | CM | ||
| 011 | Place Concrete (24-8-25) | 200 | CM | ||
| 012 | Placing and Removing Steel Plate, Size 1.5m x 3.0m | 1,000 | EA/DAY | ||
| 013 | Transportation of Removed Concrete, AC and Concrete products from Construction Site to Stock Yard/on Base | 900 | CM | ||
| 014 | Transportation of Removed Miscellaneous Material from Construction Site to Stock Yard/on Base | 400 | CM | ||
| 015 | Traffic Regulator (Flag Man) | 600 | MAN/DAY | ||
| Asphalt | 016 | Construct Subbase Course (RC-40) | 200 | CM | |
| Paving Work | 017 | Leveling Base/Subbase Course | 8,000 | SM | |
| 018 | Leveling Base Course (M-25, Average thickness 30mm) | 300 | CM | ||
| 019 | Construct Base Course (M-25) | 100 | CM | ||
| 020 | Leveling AC Pavement (Recycled AC No.1, Average thickness 40mm) | 100 | MTON | ||
| 021 | 50mm Thick Recycled AC Intermediate Course (AC No.2) | 8,000 | SM | ||
| 022 | Construct Recycled AC Wearing Course (AC No.5) | 700 | MTON | ||
| 023 | Construct AC Surface by Modified Asphalt (AC No.5) | 800 | MTON | ||
| 024 | Prime Coat (PK-3) | 10,000 | SM | ||
| 025 | Tack Coat (PK-4) | 3,000 | SM | ||
| 026 | Tack Coat (Modified PK-4) | 6,000 | SM | ||
| 027 | AC Wearing Course (Labor) | 40 | MTON | ||
| 028 | Base Stabilization for Pavement, Mix 150mm Thick | 8,000 | SM | ||
| 029 | Base Stabilization for Pavement, Mix 200mm Thick | 800 | SM | ||
| Geotextile Wk | 030 | Install Geotextile | 600 | SM | |
| Sidewalk, | 031 | Base Course (RC-40, T=100mm) | 100 | SM | |
| Curbs and | 032 | Base Course Restoration (RC-40, T=100mm) | 180 | SM | |
| Gutters Work | 033 | Frost Inhibition Course (RC-40, T=250mm) | 20 | CM | |
| 034 | Frost Inhibition Course Restoration (RC-40, T=250mm) | 20 | CM | ||
| 035 | Base Course Restoration for Road (M-25) | 30 | CM | ||
| 036 | Leveling Base Course (RC-40, Average thickness 30mm) | 60 | CM | ||
| 037 | Install Joint Filler | 60 | SM | ||
| 038 | Install Sealant (10mm x 5mm) | 600 | LM | ||
| 039 | Contraction Joint Cutter | 300 | LM | ||
| 040 | Install Precast Type A Block | 200 | LM | ||
| Pavement | 041 | Install Reflective Marking, White (W=15cm) | 2,000 | LM | |
| Markings, | 042 | Alphanumeric Concrete Curb Marking | 6 | EA | |
| Traffic Safety | 043 | Install Handicap Symbol Marking, White | 2 | EA | |
| 044 | Relocate Traffic Sign & Post | 4 | EA | ||
| Earth Work, | 045 | Road Excavation | 800 | CM | |
| Sodding, | 046 | Earthwork (Digging and Grading) | 200 | CM | |
| Planting Work | 047 | Transportation of Excavated Soil to Stock Yard | 1,000 | CM | |
| 048 | Construct Embankment with Excavated Soil | 300 | CM | ||
| 049 | Construct Embankment with New Soil | 100 | CM | ||
| 050 | Backfill Excavated Soil | 150 | CM | ||
| 051 | Backfill New Soil | 200 | CM | ||
| 052 | Place New Top Soil, 100mm Thick | 200 | CM | ||
| 053 | Place Sod (Noshiba) | 2,000 | SM | ||
| 054 | Removal and reinstallation of Sod | 100 | SM | ||
| Sanitary | 055 | Install 200mm VU Rib Pipe | 20 | LM | |
| Sewer, | 056 | Install New Manhole Frame and Cover(T-25) | 4 | EA | |
| Drainage | 057 | Raise/Lower existing Manhole Frame and Cover | 5 | EA | |
| Work | 058 | Install New Concrete Frame and Grating Cover (T-20) of Gutter Inlet | 20 | EA | |
| 059 | Install New Gutter Inlet with Pre-cast Concrete Structures, Inlet Height 1.5m | 5 | EA | ||
| 060 | Raise/Lower existing Concrete Frame and Grating Cover of Gutter Inlet | 10 | EA | ||
| 061 | Install New Frame and Grating Cover (T-25) for Catch Basin, 900 mm square | 3 | EA | ||
| Waterline Wk | 062 | Replace existing Gate Valve Box | 3 | EA | |
| Removal and | 063 | Saw Cutting of Existing AC Pavement, less than 15cm | 2,000 | LM | |
| Disposal Work | 064 | Saw Cutting of Existing AC Pavement, 15cm or more and less than 30cm | 600 | LM | |
| 065 | Saw Cutting of Existing Concrete Pavement, less than 15cm | 200 | LM | ||
| 066 | Cold Milling of AC Pavement, less than 6cm | 1,500 | SM | ||
| 067 | Cold Milling of AC Pavement, 6cm or more and less than 12cm | 500 | SM | ||
| 068 | Removal of AC Pavement, less than 10cm | 10,000 | SM | ||
| 069 | Removal of AC Pavement, 10cm or more and less than 20cm | 800 | SM | ||
| 070 | Removal of Reinforced Concrete by Labor | 5 | CM | ||
| 071 | Removal of Reinforced Concrete by Machine | 10 | CM | ||
| 072 | Removal of Plain Concrete by Labor | 10 | CM | ||
| 073 | Removal of Plain Concrete by Machine | 400 | CM | ||
| 074 | Removal of Existing Manhole Frame and Cover | 4 | EA | ||
| 075 | Removal of Existing Frame and Grating Drainage Product | 20 | EA | ||
| 076 | Removal of Precast Concrete Curb Block | 500 | LM | ||
| 077 | Removal of Existing Tree and Stump, Circumference of tree less than 20cm | 10 | EA | ||
| 078 | Removal of Existing Tree and Stump, Circumference of tree 21~30cm | 5 | EA | ||
| 079 | Removal of Existing Tree and Stump, Circumference of tree 31~60cm | 5 | EA | ||
| 080 | Removal of Existing Tree and Stump, Circumference of tree 61~90cm | 5 | EA | ||
| 081 | Removal of PVC Pipe | 4 | LM | ||
| 082 | Hauling and Disposal of Extra Soils/Gravels to Off Base | 700 | CM | ||
| 083 | Hauling and Disposal of Asphalt Concrete to Off Base | 2,000 | MTON | ||
| 084 | Hauling and Disposal of Cold Milling AC to Off Base | 1,250 | MTON | ||
| 085 | Hauling and Disposal of Plain Concrete to Off Base | 600 | MTON | ||
| 086 | Hauling and Disposal of Reinforced Concrete to Off Base | 100 | MTON | ||
| 087 | Hauling and Disposal of Precast Concrete Product to Off Base | 300 | MTON | ||
| 088 | Hauling and Disposal of Plastics to Off Base | 5 | MTON | ||
| 089 | Hauling and Disposal of Trees and stump to Off Base | 40 | MTON | ||
| 090 | Removal of AC Pavements with Soil Stabilizer | 5,000 | SM | ||
| General | 091 | Leveling Basis Crushed stone (RC-40,Average thickness 30mm) | 50 | CM | |
| Construction | 092 | Construct Basis Crushed stone (RC-40) | 30 | CM | |
| and Other for | 093 | Place Concrete (21-8-25) | 30 | CM | |
| MFH Carport | 094 | Place Concrete (24-8-25) | 100 | CM | |
| Area | 095 | Transportation of Removed Concrete, AC and Concrete products from Construction Site to Stock Yard/on Base | 500 | CM | |
| 096 | Transportation of Removed Miscellaneous Material from Construction Site to Stock Yard/on Base | 120 | CM | ||
| Asphalt | 097 | Construct Subbase Course (RC-40) | 120 | CM | |
| Paving Work | 098 | Leveling Base/Subbase Course | 3,000 | SM | |
| for MFH | 099 | Leveling Base Course (M-25, Average thickness 30mm) | 100 | CM | |
| Carport Area | 100 | Construct Base Course (M-25) | 150 | CM | |
| 101 | 50mm Thick Recycled AC Intermediate Course (AC No.2) | 5,000 | SM | ||
| 102 | Construct Recycled AC Wearing Course (AC No.5) | 600 | MTON | ||
| 103 | Construct AC Surface by Modified Asphalt (AC No.5) | 100 | MTON | ||
| 104 | Prime Coat (PK-3) | 5,000 | SM | ||
| 105 | Tack Coat (PK-4) | 1,000 | SM | ||
| 106 | Tack Coat (Modified PK-4) | 4,000 | SM | ||
| 107 | AC Wearing Course (Labor) | 40 | MTON | ||
| 108 | Install Reflective Marking, White (W=15cm) | 800 | LM | ||
| Sidewalk, | 109 | Base Course (RC-40, T=100mm) | 100 | SM | |
| Curbs and | 110 | Base Course Restoration (RC-40, T=100mm) | 180 | SM | |
| Gutters Work | 111 | Frost Inhibition Course (RC-40, T=250mm) | 20 | CM | |
| for MFH | 112 | Frost Inhibition Course Restoration (RC-40, T=250mm) | 20 | CM | |
| Carport Area | 113 | Base Course Restoration for Road (M-25) | 30 | CM | |
| 114 | Leveling Base Course (RC-40, Average thickness 30mm) | 20 | CM | ||
| 115 | Install Precast Type A Block | 180 | LM | ||
| Earth Work, | 116 | Road Excavation | 100 | CM | |
| Sodding, | 117 | Earthwork (Digging and Grading) | 300 | CM | |
| Paving Work | 118 | Transportation of Excavated Soil to Stock Yard | 500 | CM | |
| for MFH | 119 | Backfill Excavated Soil | 50 | CM | |
| Carport Area | 120 | Backfill New Soil | 50 | CM | |
| Removal and | 121 | Saw Cutting of Existing AC Pavement, less than 15cm | 1,000 | LM | |
| Disposal Wk | 122 | Removal of AC Pavement, less than 10cm | 5,000 | SM | |
| for MFH | 123 | Removal of Plain Concrete by Machine | 300 | CM | |
| Carport Area | 124 | Removal of Precast Concrete Curb Block | 500 | LM | |
| TOTAL ESTIMATED AMOUNT OF ELINs (Yen) | 0 |
&10Exhibit A RFP No. FA520523R0007 &10page &P of &N
Exhibit B
| Exhibit B |
| ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT |
| MISAWA AB, JAPAN |
| REQUEST FOR PROPOSAL No.FA520523R0007 |
| CONTRACT No. |
Offeror (Print Name, Title and Signature) Date Corporate Seal (Han)
Company Name and Address
| Category | ELIN B | Description | Estimated | ||
| Quantity | Unit of Issue | Unit Price | |||
| ¥ | Estimated Amount |
| Survey | 001 | Quantity Survey of Current Condition for Pavement and Construction Area, One Section per extension 10 m. | 200 | LOT | |
| and Test | 002 | Core Drilling and Sampling of AC or Concrete Pavement of Roads, Parking Lots, and Other Surfaces | 20 | EA | |
| 003 | Test Digging of AC Pavement, not to exceed 1m x 1m x 1m includes temporary pavement restoration | 20 | EA | ||
| 004 | Field CBR and Laboratory Tests of Roads, Parking Lots and Other Surfaces | 4 | EA | ||
| General | 005 | Construct Formwork for concrete work | 600 | SM | |
| Construction | 006 | Construct Steel Reinforcement Bar | 2 | MTON | |
| and | 007 | Frost Inhibition Course (RC-40) | 50 | CM | |
| Other Work | 008 | Leveling Basis Crushed stone (RC-40,Average thickness 30mm) | 60 | CM | |
| 009 | Construct Basis Crushed stone (RC-40) | 10 | CM | ||
| 010 | Place Concrete (21-8-25) | 70 | CM | ||
| 011 | Place Concrete (24-8-25) | 200 | CM | ||
| 012 | Placing and Removing Steel Plate, Size 1.5m x 3.0m | 1,000 | EA/DAY | ||
| 013 | Transportation of Removed Concrete, AC and Concrete products from Construction Site to Stock Yard/on Base | 900 | CM | ||
| 014 | Transportation of Removed Miscellaneous Material from Construction Site to Stock Yard/on Base | 400 | CM | ||
| 015 | Traffic Regulator (Flag Man) | 600 | MAN/DAY | ||
| Asphalt | 016 | Construct Subbase Course (RC-40) | 200 | CM | |
| Paving Work | 017 | Leveling Base/Subbase Course | 8,000 | SM | |
| 018 | Leveling Base Course (M-25, Average thickness 30mm) | 300 | CM | ||
| 019 | Construct Base Course (M-25) | 100 | CM | ||
| 020 | Leveling AC Pavement (Recycled AC No.1, Average thickness 40mm) | 100 | MTON | ||
| 021 | 50mm Thick Recycled AC Intermediate Course (AC No.2) | 8,000 | SM | ||
| 022 | Construct Recycled AC Wearing Course (AC No.5) | 700 | MTON | ||
| 023 | Construct AC Surface by Modified Asphalt (AC No.5) | 800 | MTON | ||
| 024 | Prime Coat (PK-3) | 10,000 | SM | ||
| 025 | Tack Coat (PK-4) | 3,000 | SM | ||
| 026 | Tack Coat (Modified PK-4) | 6,000 | SM | ||
| 027 | AC Wearing Course (Labor) | 40 | MTON | ||
| 028 | Base Stabilization for Pavement, Mix 150mm Thick | 8,000 | SM | ||
| 029 | Base Stabilization for Pavement, Mix 200mm Thick | 800 | SM | ||
| Geotextile Wk | 030 | Install Geotextile | 600 | SM | |
| Sidewalk, | 031 | Base Course (RC-40, T=100mm) | 100 | SM | |
| Curbs and | 032 | Base Course Restoration (RC-40, T=100mm) | 180 | SM | |
| Gutters Work | 033 | Frost Inhibition Course (RC-40, T=250mm) | 20 | CM | |
| 034 | Frost Inhibition Course Restoration (RC-40, T=250mm) | 20 | CM | ||
| 035 | Base Course Restoration for Road (M-25) | 30 | CM | ||
| 036 | Leveling Base Course (RC-40, Average thickness 30mm) | 60 | CM | ||
| 037 | Install Joint Filler | 60 | SM | ||
| 038 | Install Sealant (10mm x 5mm) | 600 | LM | ||
| 039 | Contraction Joint Cutter | 300 | LM | ||
| 040 | Install Precast Type A Block | 200 | LM | ||
| Pavement | 041 | Install Reflective Marking, White (W=15cm) | 2,000 | LM | |
| Markings, | 042 | Alphanumeric Concrete Curb Marking | 6 | EA | |
| Traffic Safety | 043 | Install Handicap Symbol Marking, White | 2 | EA | |
| 044 | Relocate Traffic Sign & Post | 4 | EA | ||
| Earth Work, | 045 | Road Excavation | 800 | CM | |
| Sodding, | 046 | Earthwork (Digging and Grading) | 200 | CM | |
| Planting Work | 047 | Transportation of Excavated Soil to Stock Yard | 1,000 | CM | |
| 048 | Construct Embankment with Excavated Soil | 300 | CM | ||
| 049 | Construct Embankment with New Soil | 100 | CM | ||
| 050 | Backfill Excavated Soil | 150 | CM | ||
| 051 | Backfill New Soil | 200 | CM | ||
| 052 | Place New Top Soil, 100mm Thick | 200 | CM | ||
| 053 | Place Sod (Noshiba) | 2,000 | SM | ||
| 054 | Removal and reinstallation of Sod | 100 | SM | ||
| Sanitary | 055 | Install 200mm VU Rib Pipe | 20 | LM | |
| Sewer, | 056 | Install New Manhole Frame and Cover(T-25) | 4 | EA | |
| Drainage | 057 | Raise/Lower existing Manhole Frame and Cover | 5 | EA | |
| Work | 058 | Install New Concrete Frame and Grating Cover (T-20) of Gutter Inlet | 20 | EA | |
| 059 | Install New Gutter Inlet with Pre-cast Concrete Structures, Inlet Height 1.5m | 5 | EA | ||
| 060 | Raise/Lower existing Concrete Frame and Grating Cover of Gutter Inlet | 10 | EA | ||
| 061 | Install New Frame and Grating Cover (T-25) for Catch Basin, 900 mm square | 3 | EA | ||
| Waterline Wk | 062 | Replace existing Gate Valve Box | 3 | EA | |
| Removal and | 063 | Saw Cutting of Existing AC Pavement, less than 15cm | 2,000 | LM | |
| Disposal Work | 064 | Saw Cutting of Existing AC Pavement, 15cm or more and less than 30cm | 600 | LM | |
| 065 | Saw Cutting of Existing Concrete Pavement, less than 15cm | 200 | LM | ||
| 066 | Cold Milling of AC Pavement, less than 6cm | 1,500 | SM | ||
| 067 | Cold Milling of AC Pavement, 6cm or more and less than 12cm | 500 | SM | ||
| 068 | Removal of AC Pavement, less than 10cm | 10,000 | SM | ||
| 069 | Removal of AC Pavement, 10cm or more and less than 20cm | 800 | SM | ||
| 070 | Removal of Reinforced Concrete by Labor | 5 | CM | ||
| 071 | Removal of Reinforced Concrete by Machine | 10 | CM | ||
| 072 | Removal of Plain Concrete by Labor | 10 | CM | ||
| 073 | Removal of Plain Concrete by Machine | 400 | CM | ||
| 074 | Removal of Existing Manhole Frame and Cover | 4 | EA | ||
| 075 | Removal of Existing Frame and Grating Drainage Product | 20 | EA | ||
| 076 | Removal of Precast Concrete Curb Block | 500 | LM | ||
| 077 | Removal of Existing Tree and Stump, Circumference of tree less than 20cm | 10 | EA | ||
| 078 | Removal of Existing Tree and Stump, Circumference of tree 21~30cm | 5 | EA | ||
| 079 | Removal of Existing Tree and Stump, Circumference of tree 31~60cm | 5 | EA | ||
| 080 | Removal of Existing Tree and Stump, Circumference of tree 61~90cm | 5 | EA | ||
| 081 | Removal of PVC Pipe | 4 | LM | ||
| 082 | Hauling and Disposal of Extra Soils/Gravels to Off Base | 700 | CM | ||
| 083 | Hauling and Disposal of Asphalt Concrete to Off Base | 2,000 | MTON | ||
| 084 | Hauling and Disposal of Cold Milling AC to Off Base | 1,250 | MTON | ||
| 085 | Hauling and Disposal of Plain Concrete to Off Base | 600 | MTON | ||
| 086 | Hauling and Disposal of Reinforced Concrete to Off Base | 100 | MTON | ||
| 087 | Hauling and Disposal of Precast Concrete Product to Off Base | 300 | MTON | ||
| 088 | Hauling and Disposal of Plastics to Off Base | 5 | MTON | ||
| 089 | Hauling and Disposal of Trees and stump to Off Base | 40 | MTON | ||
| 090 | Removal of AC Pavements with Soil Stabilizer | 5,000 | SM | ||
| General | 091 | Leveling Basis Crushed stone (RC-40,Average thickness 30mm) | 50 | CM | |
| Construction | 092 | Construct Basis Crushed stone (RC-40) | 30 | CM | |
| and Other for | 093 | Place Concrete (21-8-25) | 30 | CM | |
| MFH Carport | 094 | Place Concrete (24-8-25) | 100 | CM | |
| Area | 095 | Transportation of Removed Concrete, AC and Concrete products from Construction Site to Stock Yard/on Base | 500 | CM | |
| 096 | Transportation of Removed Miscellaneous Material from Construction Site to Stock Yard/on Base | 120 | CM | ||
| Asphalt | 097 | Construct Subbase Course (RC-40) | 120 | CM | |
| Paving Work | 098 | Leveling Base/Subbase Course | 3,000 | SM | |
| for MFH | 099 | Leveling Base Course (M-25, Average thickness 30mm) | 100 | CM | |
| Carport Area | 100 | Construct Base Course (M-25) | 150 | CM | |
| 101 | 50mm Thick Recycled AC Intermediate Course (AC No.2) | 5,000 | SM | ||
| 102 | Construct Recycled AC Wearing Course (AC No.5) | 600 | MTON | ||
| 103 | Construct AC Surface by Modified Asphalt (AC No.5) | 100 | MTON | ||
| 104 | Prime Coat (PK-3) | 5,000 | SM | ||
| 105 | Tack Coat (PK-4) | 1,000 | SM | ||
| 106 | Tack Coat (Modified PK-4) | 4,000 | SM | ||
| 107 | AC Wearing Course (Labor) | 40 | MTON | ||
| 108 | Install Reflective Marking, White (W=15cm) | 800 | LM | ||
| Sidewalk, | 109 | Base Course (RC-40, T=100mm) | 100 | SM | |
| Curbs and | 110 | Base Course Restoration (RC-40, T=100mm) | 180 | SM | |
| Gutters Work | 111 | Frost Inhibition Course (RC-40, T=250mm) | 20 | CM | |
| for MFH | 112 | Frost Inhibition Course Restoration (RC-40, T=250mm) | 20 | CM | |
| Carport Area | 113 | Base Course Restoration for Road (M-25) | 30 | CM | |
| 114 | Leveling Base Course (RC-40, Average thickness 30mm) | 20 | CM | ||
| 115 | Install Precast Type A Block | 180 | LM | ||
| Earth Work, | 116 | Road Excavation | 100 | CM | |
| Sodding, | 117 | Earthwork (Digging and Grading) | 300 | CM | |
| Paving Work | 118 | Transportation of Excavated Soil to Stock Yard | 500 | CM | |
| for MFH | 119 | Backfill Excavated Soil | 50 | CM | |
| Carport Area | 120 | Backfill New Soil | 50 | CM | |
| Removal and | 121 | Saw Cutting of Existing AC Pavement, less than 15cm | 1,000 | LM | |
| Disposal Wk | 122 | Removal of AC Pavement, less than 10cm | 5,000 | SM | |
| for MFH | 123 | Removal of Plain Concrete by Machine | 300 | CM | |
| Carport Area | 124 | Removal of Precast Concrete Curb Block | 500 | LM | |
| TOTAL ESTIMATED AMOUNT OF ELINs (Yen) | 0 |
&10Exhibit B RFP No. FA520523R0007 &10page &P of &N
Exhibit C
| Exhibit C |
| ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT |
| MISAWA AB, JAPAN |
| REQUEST FOR PROPOSAL No.FA520523R0007 |
| CONTRACT No. |
Offeror (Print Name, Title and Signature) Date Corporate Seal (Han)
Company Name and Address
| Category | ELIN C | Description | Estimated | ||
| Quantity | Unit of Issue | Unit Price | |||
| ¥ | Estimated Amount |
| Survey | 001 | Quantity Survey of Current Condition for Pavement and Construction Area, One Section per extension 10 m. | 200 | LOT | |
| and Test | 002 | Core Drilling and Sampling of AC or Concrete Pavement of Roads, Parking Lots, and Other Surfaces | 20 | EA | |
| 003 | Test Digging of AC Pavement, not to exceed 1m x 1m x 1m includes temporary pavement restoration | 20 | EA | ||
| 004 | Field CBR and Laboratory Tests of Roads, Parking Lots and Other Surfaces | 4 | EA | ||
| General | 005 | Construct Formwork for concrete work | 600 | SM | |
| Construction | 006 | Construct Steel Reinforcement Bar | 2 | MTON | |
| and | 007 | Frost Inhibition Course (RC-40) | 50 | CM | |
| Other Work | 008 | Leveling Basis Crushed stone (RC-40,Average thickness 30mm) | 60 | CM | |
| 009 | Construct Basis Crushed stone (RC-40) | 10 | CM | ||
| 010 | Place Concrete (21-8-25) | 70 | CM | ||
| 011 | Place Concrete (24-8-25) | 200 | CM | ||
| 012 | Placing and Removing Steel Plate, Size 1.5m x 3.0m | 1,000 | EA/DAY | ||
| 013 | Transportation of Removed Concrete, AC and Concrete products from Construction Site to Stock Yard/on Base | 900 | CM | ||
| 014 | Transportation of Removed Miscellaneous Material from Construction Site to Stock Yard/on Base | 400 | CM | ||
| 015 | Traffic Regulator (Flag Man) | 600 | MAN/DAY | ||
| Asphalt | 016 | Construct Subbase Course (RC-40) | 200 | CM | |
| Paving Work | 017 | Leveling Base/Subbase Course | 8,000 | SM | |
| 018 | Leveling Base Course (M-25, Average thickness 30mm) | 300 | CM | ||
| 019 | Construct Base Course (M-25) | 100 | CM | ||
| 020 | Leveling AC Pavement (Recycled AC No.1, Average thickness 40mm) | 100 | MTON | ||
| 021 | 50mm Thick Recycled AC Intermediate Course (AC No.2) | 8,000 | SM | ||
| 022 | Construct Recycled AC Wearing Course (AC No.5) | 700 | MTON | ||
| 023 | Construct AC Surface by Modified Asphalt (AC No.5) | 800 | MTON | ||
| 024 | Prime Coat (PK-3) | 10,000 | SM | ||
| 025 | Tack Coat (PK-4) | 3,000 | SM | ||
| 026 | Tack Coat (Modified PK-4) | 6,000 | SM | ||
| 027 | AC Wearing Course (Labor) | 40 | MTON | ||
| 028 | Base Stabilization for Pavement, Mix 150mm Thick | 8,000 | SM | ||
| 029 | Base Stabilization for Pavement, Mix 200mm Thick | 800 | SM | ||
| Geotextile Wk | 030 | Install Geotextile | 600 | SM | |
| Sidewalk, | 031 | Base Course (RC-40, T=100mm) | 100 | SM | |
| Curbs and | 032 | Base Course Restoration (RC-40, T=100mm) | 180 | SM | |
| Gutters Work | 033 | Frost Inhibition Course (RC-40, T=250mm) | 20 | CM | |
| 034 | Frost Inhibition Course Restoration (RC-40, T=250mm) | 20 | CM | ||
| 035 | Base Course Restoration for Road (M-25) | 30 | CM | ||
| 036 | Leveling Base Course (RC-40, Average thickness 30mm) | 60 | CM | ||
| 037 | Install Joint Filler | 60 | SM | ||
| 038 | Install Sealant (10mm x 5mm) | 600 | LM | ||
| 039 | Contraction Joint Cutter | 300 | LM | ||
| 040 | Install Precast Type A Block | 200 | LM | ||
| Pavement | 041 | Install Reflective Marking, White (W=15cm) | 2,000 | LM | |
| Markings, | 042 | Alphanumeric Concrete Curb Marking | 6 | EA | |
| Traffic Safety | 043 | Install Handicap Symbol Marking, White | 2 | EA | |
| 044 | Relocate Traffic Sign & Post | 4 | EA | ||
| Earth Work, | 045 | Road Excavation | 800 | CM | |
| Sodding, | 046 | Earthwork (Digging and Grading) | 200 | CM | |
| Planting Work | 047 | Transportation of Excavated Soil to Stock Yard | 1,000 | CM | |
| 048 | Construct Embankment with Excavated Soil | 300 | CM | ||
| 049 | Construct Embankment with New Soil | 100 | CM | ||
| 050 | Backfill Excavated Soil | 150 | CM | ||
| 051 | Backfill New Soil | 200 | CM | ||
| 052 | Place New Top Soil, 100mm Thick | 200 | CM | ||
| 053 | Place Sod (Noshiba) | 2,000 | SM | ||
| 054 | Removal and reinstallation of Sod | 100 | SM | ||
| Sanitary | 055 | Install 200mm VU Rib Pipe | 20 | LM | |
| Sewer, | 056 | Install New Manhole Frame and Cover(T-25) | 4 | EA | |
| Drainage | 057 | Raise/Lower existing Manhole Frame and Cover | 5 | EA | |
| Work | 058 | Install New Concrete Frame and Grating Cover (T-20) of Gutter Inlet | 20 | EA | |
| 059 | Install New Gutter Inlet with Pre-cast Concrete Structures, Inlet Height 1.5m | 5 | EA | ||
| 060 | Raise/Lower existing Concrete Frame and Grating Cover of Gutter Inlet | 10 | EA | ||
| 061 | Install New Frame and Grating Cover (T-25) for Catch Basin, 900 mm square | 3 | EA | ||
| Waterline Wk | 062 | Replace existing Gate Valve Box | 3 | EA | |
| Removal and | 063 | Saw Cutting of Existing AC Pavement, less than 15cm | 2,000 | LM | |
| Disposal Work | 064 | Saw Cutting of Existing AC Pavement, 15cm or more and less than 30cm | 600 | LM | |
| 065 | Saw Cutting of Existing Concrete Pavement, less than 15cm | 200 | LM | ||
| 066 | Cold Milling of AC Pavement, less than 6cm | 1,500 | SM | ||
| 067 | Cold Milling of AC Pavement, 6cm or more and less than 12cm | 500 | SM | ||
| 068 | Removal of AC Pavement, less than 10cm | 10,000 | SM | ||
| 069 | Removal of AC Pavement, 10cm or more and less than 20cm | 800 | SM | ||
| 070 | Removal of Reinforced Concrete by Labor | 5 | CM | ||
| 071 | Removal of Reinforced Concrete by Machine | 10 | CM | ||
| 072 | Removal of Plain Concrete by Labor | 10 | CM | ||
| 073 | Removal of Plain Concrete by Machine | 400 | CM | ||
| 074 | Removal of Existing Manhole Frame and Cover | 4 | EA | ||
| 075 | Removal of Existing Frame and Grating Drainage Product | 20 | EA | ||
| 076 | Removal of Precast Concrete Curb Block | 500 | LM | ||
| 077 | Removal of Existing Tree and Stump, Circumference of tree less than 20cm | 10 | EA | ||
| 078 | Removal of Existing Tree and Stump, Circumference of tree 21~30cm | 5 | EA | ||
| 079 | Removal of Existing Tree and Stump, Circumference of tree 31~60cm | 5 | EA | ||
| 080 | Removal of Existing Tree and Stump, Circumference of tree 61~90cm | 5 | EA | ||
| 081 | Removal of PVC Pipe | 4 | LM | ||
| 082 | Hauling and Disposal of Extra Soils/Gravels to Off Base | 700 | CM | ||
| 083 | Hauling and Disposal of Asphalt Concrete to Off Base | 2,000 | MTON | ||
| 084 | Hauling and Disposal of Cold Milling AC to Off Base | 1,250 | MTON | ||
| 085 | Hauling and Disposal of Plain Concrete to Off Base | 600 | MTON | ||
| 086 | Hauling and Disposal of Reinforced Concrete to Off Base | 100 | MTON | ||
| 087 | Hauling and Disposal of Precast Concrete Product to Off Base | 300 | MTON | ||
| 088 | Hauling and Disposal of Plastics to Off Base | 5 | MTON | ||
| 089 | Hauling and Disposal of Trees and stump to Off Base | 40 | MTON | ||
| 090 | Removal of AC Pavements with Soil Stabilizer | 5,000 | SM | ||
| General | 091 | Leveling Basis Crushed stone (RC-40,Average thickness 30mm) | 50 | CM | |
| Construction | 092 | Construct Basis Crushed stone (RC-40) | 30 | CM | |
| and Other for | 093 | Place Concrete (21-8-25) | 30 | CM | |
| MFH Carport | 094 | Place Concrete (24-8-25) | 100 | CM | |
| Area | 095 | Transportation of Removed Concrete, AC and Concrete products from Construction Site to Stock Yard/on Base | 500 | CM | |
| 096 | Transportation of Removed Miscellaneous Material from Construction Site to Stock Yard/on Base | 120 | CM | ||
| Asphalt | 097 | Construct Subbase Course (RC-40) | 120 | CM | |
| Paving Work | 098 | Leveling Base/Subbase Course | 3,000 | SM | |
| for MFH | 099 | Leveling Base Course (M-25, Average thickness 30mm) | 100 | CM | |
| Carport Area | 100 | Construct Base Course (M-25) | 150 | CM | |
| 101 | 50mm Thick Recycled AC Intermediate Course (AC No.2) | 5,000 | SM | ||
| 102 | Construct Recycled AC Wearing Course (AC No.5) | 600 | MTON | ||
| 103 | Construct AC Surface by Modified Asphalt (AC No.5) | 100 | MTON | ||
| 104 | Prime Coat (PK-3) | 5,000 | SM | ||
| 105 | Tack Coat (PK-4) | 1,000 | SM | ||
| 106 | Tack Coat (Modified PK-4) | 4,000 | SM | ||
| 107 | AC Wearing Course (Labor) | 40 | MTON | ||
| 108 | Install Reflective Marking, White (W=15cm) | 800 | LM | ||
| Sidewalk, | 109 | Base Course (RC-40, T=100mm) | 100 | SM | |
| Curbs and | 110 | Base Course Restoration (RC-40, T=100mm) | 180 | SM | |
| Gutters Work | 111 | Frost Inhibition Course (RC-40, T=250mm) | 20 | CM | |
| for MFH | 112 | Frost Inhibition Course Restoration (RC-40, T=250mm) | 20 | CM | |
| Carport Area | 113 | Base Course Restoration for Road (M-25) | 30 | CM | |
| 114 | Leveling Base Course (RC-40, Average thickness 30mm) | 20 | CM | ||
| 115 | Install Precast Type A Block | 180 | LM | ||
| Earth Work, | 116 | Road Excavation | 100 | CM | |
| Sodding, | 117 | Earthwork (Digging and Grading) | 300 | CM | |
| Paving Work | 118 | Transportation of Excavated Soil to Stock Yard | 500 | CM | |
| for MFH | 119 | Backfill Excavated Soil | 50 | CM | |
| Carport Area | 120 | Backfill New Soil | 50 | CM | |
| Removal and | 121 | Saw Cutting of Existing AC Pavement, less than 15cm | 1,000 | LM | |
| Disposal Wk | 122 | Removal of AC Pavement, less than 10cm | 5,000 | SM | |
| for MFH | 123 | Removal of Plain Concrete by Machine | 300 | CM | |
| Carport Area | 124 | Removal of Precast Concrete Curb Block | 500 | LM | |
| TOTAL ESTIMATED AMOUNT OF ELINs (Yen) | 0 |