Atch4 Schedule of Material Submittals.pdf
PDF 388 KB Posted
- Solicitation number
- FA520523R0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (Identifiable Offeror Name)_RoadIDIQMisawa_ExhibitA-C.xlsx | XLSX spreadsheet | |
| Atch5 Historical Data.pdf | ||
| Atch6 Past Performance Questionnaire.pdf | ||
| Atch1 Other Contract Requirements.pdf | ||
| Solicitation - FA520523R0007.pdf | ||
| Atch2 Specifications.pdf | ||
| Atch3 Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPROVED DISAPPROV
ED
DIVISION 1 - GENERAL REQUIREMENTS
1. Section - 01 11 00, Special Contract Requirements
1.1.1.4 Soil sumpling and testing 3
1.1.1.4 Cementitious Materials and Bituminous 3 3 3
1.1.1.4 Field testing 3
2.15.1 As-Built Drawings (CD Auto CAD) 3 within 10 days after on-site work completion.
2. Section - 01 33 00, Submittals SD-01 a. Submittal Register 3
3. Section - 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS SD-01 a. Environmental Protection Plan 3 SD-01 b. Dirt and Dust Control Plan 3 SD-01 c. Employee Training Records 3 SD-01 d. Environmental Manager Qualifications 3 SD-06 a. Laboratory Analysis Inspection 3 SD-06 b. Solid Waste Management Report 3 SD-07 a. Employee Training Records 3 SD-07 b. EMS Certificate Of Completion 3 SD-07 c. Certificate of Competency 3 SD-07 d. Erosion and Sediment Control Inspector Qu 3 SD-11 a. Stormwater Pollution Prevention Plan Complianc 3 SD-11 b. Waste Determination Documentation 3 SD-11 c. Solid Waste Management Report 3 SD-11 d. Contractor Certification 3
DIVISION 2 - EXISTING CONDITIONS
4. Section - 02 41 00, Demolition
SD-07 a. Demolition Plan 3 3
DIVISION 3 - CONCRETE
5. Section - 03 20 00 00 10, CONCRETE REINFORCEMENT
SD-02 a. Reinforcement 3 SD-03 a. Welding 3 SD-07 a. Reinforcing Steel 3
6. Section - 03 31 01 00 10, CCAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORK SD-03 a. Concrete Mix Designs 3 SD-06 a. Testing and Inspections 3 SD-07 a. Cementitious Materials 3
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
ES
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
IN
ST
R U
C
TI
O N
M
SD
S H
EE
TS
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
PR
EC
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
R
EC
O R
D S
M
AN
U
FA
C
TU
R
ER
C
AT
AL
O
G D
AT
A
O
PE
R
AT
IO
N
, M
AI
N
TE
N
AN
C E
M
AN
U
AL
S
SC
H
ED
U
LE
(To be completed by Project Engineer) (To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
BE
R
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
D
ES
IG
N
D
AT
A
SA
M
PL
ESITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER PROJECT TITLE
Roads/Pavements & Misc. Civil Work IDIQ contract, Misawa Aie Base Japan
TE
ST
R
EP
O R
TS
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
IN
ST
R
U C
TI
O
N S
PR
O
D U
C T
D
AT
A
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) Page 1 of 4
SOLICITATION / CONTRACT NO.
FA520523R0007
Attachment 4 of RFP No. FA520523R0007
1594581730U Line
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
ES
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
IN
ST
R U
C
TI
S H
EE
TS
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
PR
EC
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
R
EC
O R
D S
M
AN
U
FA
C
TU
R
ER
C
AT
AL
O
G D
AT
A
O
PE
R
AT
IO
N
, M
AI
N
TE
N
AN
C E
M
AN
U
AL
S
SC
H
ED
U
LE
SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer) (To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
BE
R
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
D
ES
IG
N
D
AT
A
SA
M
PL
ESITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER PROJECT TITLE
Roads/Pavements & Misc. Civil Work IDIQ contract, Misawa Aie Base Japan
TE
ST
R
EP
O R
TS
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
IN
ST
R
U C
TI
O
N S
PR
O
D U
C T
D
AT
A
SD-08 a. Curing Compound 3
DIVISION 31 - EXTERIOR IMPROVEMENTS
7. Section - 31 00 00, EARTHWORK
SD-01 a. Shoring 3 SD-01 b. Dewatering Work Plan 3 SD-03 a. Utilization of Excavated materials 3 SD-06 a. Testing 3 SD-06 b. Borrow Site Testing 3 SD-07 a. Testing 3
8. Section - 31 05 19, GEOTEXTILE SD-03 a. Thread 3 SD-04 a. Quality Assurance Samples and Tests 3 SD-07 a. Geotextile 3
9. Section - 31 23 00 00 20, EXCAVATION AND FILL SD-01 a. Shoring and Sheeting Plan 3 SD-01 b. Dewatering Work Plan 3 SD-01 c. Blasting Work Plan 3 SD-06 a. Borrow Site Testing 3 SD-06 b. Fill and Backfill Test 3 SD-06 c. Select Material Test 3 SD-06 d. Porous Fill for Capillary Water Barrier 3 SD-06 e. Density Tests 3
DIVISION 32 - EXTERIOR IMPROVEMENTS
10. Section - 32 01 24 HOT IN-PLACE RECYCLING OF BITUMINOUS PAVEMENTS
SD-04 a. Samples 3 SD-06 a. Field Testing and Sampling 3
11. Section - 32 11 20 BASE COURSE FOR RIGID AND SUBBASES COURSES FOR FLEXIBLE PAVING SD-03 a. Equipment 3 SD-06 a. Sampling and Testing 3 SD-06 b. Field Density Tests 3
12. Section - 32 11 23 AGGREGATE BASE COURSE SD-03 a. Plant, Equipment, and Tools 3 SD-06 a. Sampling and Testing 3 SD-06 b. Field Density Tests 3
13. Section - 32 12 10 BITUMINOUS TACK AND PRIME COATS SD-03 a. Waybills and Delivery Tickets 3
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) Page 2 of 4
FA520523R0007
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
ES
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
IN
ST
R U
C
TI
S H
EE
TS
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
PR
EC
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
R
EC
O R
D S
M
AN
U
FA
C
TU
R
ER
C
AT
AL
O
G D
AT
A
O
PE
R
AT
IO
N
, M
AI
N
TE
N
AN
C E
M
AN
U
AL
S
SC
H
ED
U
LE
SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer) (To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
BE
R
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
D
ES
IG
N
D
AT
A
SA
M
PL
ESITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER PROJECT TITLE
Roads/Pavements & Misc. Civil Work IDIQ contract, Misawa Aie Base Japan
TE
ST
R
EP
O R
TS
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
IN
ST
R
U C
TI
O
N S
PR
O
D U
C T
D
AT
A
SD-03 b. Local/Regional Materials 3 SD-06 a. Sampling and Testing 3
14. Section - 32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS SD-03 a. Mix Design 3 SD-03 b. Quality Control 3 SD-03 c. Material Acceptance 3 SD-04 a. Asphalt Cement Binder 3 SD-04 b. Aggregates 3 SD-06 a. Aggregates 3 SD-06 b. QC Monitoring 3 SD-07 a. Asphalt Cement Binder 3 SD-07 b. Testing Laboratory 3
15. Section - 32 16 13 CONCRETE SIDEWALKS, CURBS AND GUTTERS 1.2.1.a Construction Equipment 3 1.2.1.b Course and Fine Aggregate 3 1.2.1.c Job Mix Formula 3 1.2.1.d Expansion Joint Filler 3 1.2.1.e Joint Sealant 3 1.2.1.f Epoxy-Resin 3 1.2.2.a Precast Concrete Curb and Gutter 3 1.2.2.b Concrete Stairs with Steel Handrails 3 1.2.2.c Traffic Sign Post w/Concrete Footing 3 1.2.2.d Precast Concrete Wheel Stop 3 1.2.2.e Sidewalk Ramp Type A, B, & C 3 1.2.3.a Pavement Inspection 3 1.2.3.b Sieve Analysis of Aggregates 3 1.2.3.c Compressive Strength 3 1.2.3.d Liquid Limit of Aggregate 3 1.2.3.e Plasticity Index of Aggregates 3 1.2.3.f Sieve Analysis of Combined Material 3 1.2.3.g Portland Cement 3 1.2.4.a Location of Aggregate Source 3 1.2.5.a Construction Equipment List / Mixing Plant 3
16. Section - 32 17 23 PAVEMENT MARKINGS SD-03 a. Equipment 3 SD-03 b. Composition Requirements 3 SD-03 c. Qualifications 3 SD-06 a. Sampling and Testing 3
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) Page 3 of 4
FA520523R0007
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
ES
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
IN
ST
R U
C
TI
S H
EE
TS
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
PR
EC
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
R
EC
O R
D S
M
AN
U
FA
C
TU
R
ER
C
AT
AL
O
G D
AT
A
O
PE
R
AT
IO
N
, M
AI
N
TE
N
AN
C E
M
AN
U
AL
S
SC
H
ED
U
LE
SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer) (To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
BE
R
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
D
ES
IG
N
D
AT
A
SA
M
PL
ESITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER PROJECT TITLE
Roads/Pavements & Misc. Civil Work IDIQ contract, Misawa Aie Base Japan
TE
ST
R
EP
O R
TS
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
IN
ST
R
U C
TI
O
N S
PR
O
D U
C T
D
AT
A
17. Section - 32 92 23 SODDING SD-03 a. Fertilizer 3 SD-06 a. Topsoil Composition Tests 3 SD-07 a. Sod farm certification for sods 3
DIVISION 33 - UTILITIES
18. Section - 33 11 00 WATER UTILITY DISTRIBUTION PIPING
SD-02 Pre-cast Valve Box (Water) 3 SD-04 Pre-cast Valve Box (Water) 3
19. Section - 33 40 00 STORM DRAINAGE UTILITIES SD-03 a. Placing Pipe 3 SD-04 a. Pipe for Culverts and Storm Drains 3 SD-07 a. Frame and Cover for Gratings 3
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) Page 4 of 4
FA520523R0007