Atch5_List_of_Contractor-Furnished_U.S._Material.pdf

PDF 34 KB Posted

Attached to
Airfield/Pavements IDIQ Contract, Misawa AB, Japan
Solicitation number
FA520517R0006
Issued by

About this file

Atch5_List of Contractor-Furnished U.S. Material

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 24 Apr 2017

Attachment 5 to RFP No. FA520517R0006

LIST OF CONTRACTOR – FURNISHED U.S. MATERILA (CFUSM)

Airfield/Pavements IDIQ Contract, Misawa AB, Japan

Item No. Nomenclature

Unit of Issue

Airfield Eliminated Sign under ELIN A/B/C/D/E067, Install Airfield Eliminated Sign with Concrete Foundation

EA

NOTE:

a. Transportation of these items shall be in accordance with Section I, Contract Clause DFARS

252.247-7023, Transportation of Supplies by Sea (APR 2014).

b. Disposition of Surplus U.S. Materials, Supplies or Equipment:

In the event the U.S. Government and contractor agree that title to any surplus contractor-furnished U.S. Materials, supplies or equipments which have been exempted from Japanese Custom Duties or Taxes pursuant to Article XI of the Status of Forces Agreement will remain with the contractor, the disposition of such property accruing from the performance of this contract shall be the responsibility of the contractor. The contractor further agrees to make a full disclosure of such settlement to the local Government customs authorities for the payment of applicable duties and taxes.

REFERENCE PUBLICATIONS

• AFI 32-1043 MANAGING, OPERATING, AND MAINTAINING AIRCRAFT ARRESTING

SYSTEMS

• UFC 3-535-01 VISUAL AIR NAVIGATION FACILITIES

File details come from the government source that posted it. Updated .