APPROVED DISAPPROV

ED

DIVISION 1

1 Section 01 11 00 30 33 GENERAL CONTRACT REQUIREMENTS

1.7 As-built Drawing 1 within 10 days after on-site

work completion.

2 Section 01 33 00 SUBMITTAL PROCEDURES

SD-01 a. Submittal Register 3

3 Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

SD-01 a. Environmental Protection Plan 3

SD-01 b. Dirt and Dust Control Plan 3

SD-01 c. Employee Training Records 3

SD-01 d. Environmental Manager Qualifications 3

SD-06 a. Laboratory Analysis Inspection 3

SD-06 b. Solid Waste Management Report 3

SD-07 a. Employee Training Records 3

SD-07 b. EMS Certificate Of Completion 3

SD-07 c. Certificate of Competency 3

SD-07 d. Erosion and Sediment Control Inspector Qualifications

SD-11 a. Stormwater Pollution Prevention Plan Compliance Notebook

SD-11 b. Waste Determination Documentation 3

SD-11 c. Solid Waste Management Report 3

SD-11 d. Sales Documentation 3

SD-11 e. Contractor Certification 3

DIVISION 2

4 Section - 02 41 00 DEMOLITION

SD-07 a. Demolition Plan 3 3

DIVISION 3

5 Section - 03 20 01 00 10 CONCRETE REINFORCEMENT

SD-02 a. Reinforcement 3

SD-03 a. Welding 3

SD-07 a. Reinforcing Steel 3

6 Section - 03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORK SD-03 a. Mixture Proportions 3

SD-05 a. Mixture Proportions 3

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER PROJECT TITLE

Airfield/Pavements IDIQ Contract, Misawa Aie Base Japan

SOLICITATION / CONTRACT NO.

FA520517R0006

(To be completed by Project Engineer) (To be completed by Contract Administrator)

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

D E

S

IG

N D

A

TA

S A

M P

LE

S

TE

S

T R

E P

O R

TS

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S

IN

S

TR

U C

TI

O

N S

P R

O D

U C

T D

A

TA

P R

E C

O N

S

TR

U C

TI

O

N S

U B

M

IT

TA

LS

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

R E

C O

R D

S

M A

N U

FA

C

TU

R

E R

C A

TA

LO

G D

A

TA

O P

E R

A

TI

O N

, M A

IN

TE

N A

N C

E M

A N

U A

LS

S C

H E

D U

LE

IN

S

TR

U

C

TI

O N

M S

D S

H E

E

TS

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

IN

G

R E

TU

R

N S

U S

P E

N S

E D

A

TE

S U

B M

IT

TA

L N

U M

B E

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)

Attachment 4 to RFP No. FA520517R0006 Date: 24 Apr 2017

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER PROJECT TITLE

Airfield/Pavements IDIQ Contract, Misawa Aie Base Japan

SOLICITATION / CONTRACT NO.

FA520517R0006

(To be completed by Project Engineer) (To be completed by Contract Administrator)

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

D E

S

IG

N D

A

TA

S A

M P

LE

S

TE

S

T R

E P

O R

TS

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S

IN

S

TR

U C

TI

O

N S

P R

O D

U C

T D

A

TA

P R

E C

O N

S

TR

U C

TI

O

N S

U B

M

IT

TA

LS

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

R E

C O

R D

S

M A

N U

FA

C

TU

R

E R

C A

TA

LO

G D

A

TA

O P

E R

A

TI

O N

, M A

IN

TE

N A

N C

E M

A N

U A

LS

S C

H E

D U

LE

IN

S

TR

U

C

TI

D S

H E

E

TS

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

IN

G

R E

TU

R

N S

U S

P E

N S

E D

A

TE

S U

B M

IT

TA

L N

U M

B E

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

SD-06 a. Testing and Inspection for CQC 3

SD-07 a. Qualifications 3

DIVISION 26

7 Section - 26 00 00 00 20 BASIC ELECTRICAL MATERIALS AND METHODS

SD-02 Wiring Diagrams and Installation Details 3

SD-03 Performance and Characteric Curves 3

DIVISION 31

8 Section - 31 00 00 EARTHWORK

SD-01 a. Shoring 3

SD-01 b. Dewatering Work Plan 3

SD-03 a. Utilization of Excavated materials 3

SD-06 a. Testing 3

SD-06 b. Borrow Site Testing 3

SD-07 a. Testing 3 9 Section - 31 05 19 GEOTEXTILE

SD-03 a. Thread 3

SD-04 a. Quality Assurance Samples and Tests 3

SD-07 a. Geotextile 3

10 Section - 31 11 00 CLEANING AND GRUBBING SD-03 a. Nonsaleable Materials 3

SD-04 a. Tree Wound Paint 3

SD-04 b. Herbicide 3

11 Section - 31 23 00 00 20 EXCAVATION AND FILL SD-01 a. Shoring and Sheeting Plan 3

SD-01 b. Dewatering Work Plan 3

SD-01 c. Blasting Work Plan 3

SD-06 a. Borrow Site Testing 3

SD-06 b. Fill and Backfill Test 3

SD-06 c. Select Material Test 3

SD-06 d. Porous Fill for Capillary Water Barrier 3

SD-06 e. Density Tests 3

DIVISION 32

12 Section - 32 01 11 51 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS

SD-04 a. Rubber and Paint Removal Sample 3

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER PROJECT TITLE

Airfield/Pavements IDIQ Contract, Misawa Aie Base Japan

SOLICITATION / CONTRACT NO.

FA520517R0006

(To be completed by Project Engineer) (To be completed by Contract Administrator)

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

D E

S

IG

N D

A

TA

S A

M P

LE

S

TE

S

T R

E P

O R

TS

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S

IN

S

TR

U C

TI

O

N S

P R

O D

U C

T D

A

TA

P R

E C

O N

S

TR

U C

TI

O

N S

U B

M

IT

TA

LS

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

R E

C O

R D

S

M A

N U

FA

C

TU

R

E R

C A

TA

LO

G D

A

TA

O P

E R

A

TI

O N

, M A

IN

TE

N A

N C

E M

A N

U A

LS

S C

H E

D U

LE

IN

S

TR

U

C

TI

D S

H E

E

TS

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

IN

G

R E

TU

R

N S

U S

P E

N S

E D

A

TE

S U

B M

IT

TA

L N

U M

B E

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

SD-07 a. Hogh-pressure Rubber and Paint Removal E 3

13 Section - 32 01 19 61 RESEALING OF JOINTS IN RIGID PAVEMENT SD-03 a. Joint Sealant 3

SD-04 a. Joint Filler 3

SD-04 b. Separating Tape 3

SD-04 c. Joint Backer Rod 3

SD-04 d. Joint Sealant 3 3

SD-06 a. Joint Sealant 3

SD-07 a. Equipment List 3

SD-08 a. Joint Sealant 3

14 Section - 32 01 24 HOT IN-PLACE RECYCLING OF BITUMINOUS PAVEMENTS SD-04 a. Samples 3

SD-06 a. Field Testing and Sampling 3

15 Section - 32 01 29 61 PARTIAL DEPTH PATCHING OF RIGID PAVING SD-02 a. Shop Drawings 3

SD-03 Mix Design 3

SD-03 b. Proprietary 3

SD-03 c. Pigmented Liquid Membrane-forming Compound 3

SD-04 a. Absorbent curing material 3

SD-04 b. Joint filler 3

SD-04 c. Joint sealant 3

SD-05 a. Concrete Mix Design 3

SD-06 a. Laboratory Test Results 3

SD-06 b. Aggregates gradation 3

SD-06 c. Cement 3

SD-06 d. Concrete slump 3

SD-06 e. Concrete air content 3

SD-06 f. Concrete strength (cylinder) 3

SD-06 g. Mixer calibration and efficiency 3

SD-07 a. Cement 3

SD-07 b. Aggregate 3

SD-07 c. Admixtures 3

SD-07 d. Absorbent curing material 3

SD-07 e. Pigmented liquid membrane-forming compou 3

SD-07 f. Waterproof Sheet 3

SD-07 g. Joint filler 3

SD-07 h. Joint sealant 3

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER PROJECT TITLE

Airfield/Pavements IDIQ Contract, Misawa Aie Base Japan

SOLICITATION / CONTRACT NO.

FA520517R0006

(To be completed by Project Engineer) (To be completed by Contract Administrator)

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

D E

S

IG

N D

A

TA

S A

M P

LE

S

TE

S

T R

E P

O R

TS

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S

IN

S

TR

U C

TI

O

N S

P R

O D

U C

T D

A

TA

P R

E C

O N

S

TR

U C

TI

O

N S

U B

M

IT

TA

LS

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

R E

C O

R D

S

M A

N U

FA

C

TU

R

E R

C A

TA

LO

G D

A

TA

O P

E R

A

TI

O N

, M A

IN

TE

N A

N C

E M

A N

U A

LS

S C

H E

D U

LE

IN

S

TR

U

C

TI

D S

H E

E

TS

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

IN

G

R E

TU

R

N S

U S

P E

N S

E D

A

TE

S U

B M

IT

TA

L N

U M

B E

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

16 Section - 32 11 16 BASE COURSE FOR RIGID AND SUBBASES COURSES FOR FLEXIBLE PAVING SD-03 a. Equipment 3

SD-06 a. Sampling and Testing 3

SD-06 b. Field Density Tests 3

17 Section - 32 11 23 AGGREGATE BASE COURSE SD-03 a. Plant, Equipment, and Tools 3

SD-06 a. Sampling and Testing 3

SD-06 b. Field Density Tests 3

18 Section - 32 12 10 BITUMINOUS TACK AND PRIME COATS SD-03 a. Waybills and Delivery Tickets 3

SD-03 b. Local/Regional Materials 3

SD-06 a. Sampling and Testing 3

19 Section - 32 12 15 HOT-MIX ASPHALT (HMA) FOR AIRFIELDS SD-02 a. Placement Plan 3

SD-03 a. Mix Design 3

SD-03 b. Contractor Quanlity Control 3

SD-04 a. Asphalt Cemnet Binder 3

SD-04 b. Agregates 3

SD-06 a. Agregates 3

SD-06 b. QC Monitoring 3

SD-07 a. Asphalt Cement Binder 3

SD-07 b. Test Laboratory 3

20 Section - 32 13 13 03 AIRFIELDS AND HEAVY-DUTY CONCRETE PAVEMENT LESS THAN 10000 CUBIC YARDS SD-03a. Equipment 3

SD-03b. Proposed Techniques 3

SD-05 a. Proportioning Studies 3

SD-06 a. Sampling and Testing 3

SD-06 b. Concrete Slump 3

SD-06 c. Air Content 3

SD-06 d. Pavement Thickness 3

SD-06 e. Flexural Strength 3

SD-06 f. Control Charts 3

SD-07 a. Contractor Quality Control Staff 3

SD-07 b. Laboratory Accreditation 3

21 Section - 32 17 24 00 10 PAVEMENT MARKINGS SD-03 a. Equipment 3

SD-03 b. Composition Requirements 3 3

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER PROJECT TITLE

Airfield/Pavements IDIQ Contract, Misawa Aie Base Japan

SOLICITATION / CONTRACT NO.

FA520517R0006

(To be completed by Project Engineer) (To be completed by Contract Administrator)

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

D E

S

IG

N D

A

TA

S A

M P

LE

S

TE

S

T R

E P

O R

TS

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S

IN

S

TR

U C

TI

O

N S

P R

O D

U C

T D

A

TA

P R

E C

O N

S

TR

U C

TI

O

N S

U B

M

IT

TA

LS

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

R E

C O

R D

S

M A

N U

FA

C

TU

R

E R

C A

TA

LO

G D

A

TA

O P

E R

A

TI

O N

, M A

IN

TE

N A

N C

E M

A N

U A

LS

S C

H E

D U

LE

IN

S

TR

U

C

TI

D S

H E

E

TS

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

IN

G

R E

TU

R

N S

U S

P E

N S

E D

A

TE

S U

B M

IT

TA

L N

U M

B E

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

SD-03 c. Qualifications 3

SD-06 a. Sampling and Testing 3

SD-07 a. Volatile Organic Compund (VOC) 3 22 Section - 32 92 19 SEEDING

SD-03 a. Wood Cellulose Fiber Mulch 3

SD-03 b. Fertilizer 3

SD-06 a. Topsoil Composition Tests 3

SD-07 a. State Certification and Approval for Seed 3

SD-08 a. Erosion Control Materials 3

23 Section - 32 92 23 SODDING SD-03 a. Fertilizer 3

SD-06 a. Topsoil Composition Tests 3

SD-07 a. Sod farm certification for sods 3 24 Section - 33 40 00 STORM DRAINAGE UTILITIES

SD-03 a. Placing Pipe 3

SD-04 a. Pipe for Culverts and Stirm Drains 3

SD-07 a. Resin Certification 3

SD-07 b. Pipeline Testing 3

SD-07 c. Hydrostic Test on Westertight Joints 3

SD-07 d. Determination of Density 3

SD-07 e. Frame and Cover for Gratings 3 25 Section - 33 43 00 00 20 AIRFIELD LIGHTING

SD-02 a. Landing signal officer (LSO) control panel 3

SD-02 b. Approach lighting frangible tower 3

SD-02 c. Each type of airfield lighting fixture installation 3

SD-02 d. Wind cone indicator assembly connection 3

SD-02 e. Wave-Off system 3

SD-03 a. Control cable 3

SD-03 b. Series airfield lighting cable 3

SD-03 c. Isolating transformers 3

SD-03 d. Constant current regulators 3

SD-03 e. Each type of runway and taxiway lighting fixture 3

SD-03 f. Each type of light bases 3

SD-03 g. Frangible couplings 3

SD-03 h. FAA Type P-606 sealant 3

SD-03 i. FAA Type L-823 connectors 3

SD-03 j. Circuit selector cabinets 3

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER PROJECT TITLE

Airfield/Pavements IDIQ Contract, Misawa Aie Base Japan

SOLICITATION / CONTRACT NO.

FA520517R0006

(To be completed by Project Engineer) (To be completed by Contract Administrator)

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

D E

S

IG

N D

A

TA

S A

M P

LE

S

TE

S

T R

E P

O R

TS

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S

IN

S

TR

U C

TI

O

N S

P R

O D

U C

T D

A

TA

P R

E C

O N

S

TR

U C

TI

O

N S

U B

M

IT

TA

LS

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

R E

C O

R D

S

M A

N U

FA

C

TU

R

E R

C A

TA

LO

G D

A

TA

O P

E R

A

TI

O N

, M A

IN

TE

N A

N C

E M

A N

U A

LS

S C

H E

D U

LE

IN

S

TR

U

C

TI

D S

H E

E

TS

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

IN

G

R E

TU

R

N S

U S

P E

N S

E D

A

TE

S U

B M

IT

TA

L N

U M

B E

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

SD-03 k. Pilot relay panel 3

SD-03 l. Control transfer panel 3

SD-03 m. Control panel 3

SD-03 n. Sequenced flashing light system components 3

SD-03 o. Wave-Off system components complete 3

SD-06 a. Counterpoise system test 3

SD-07 a. Installer Qualifications 3

SD-07 b. Construction Outage Plan 3

SD-10 a. Constant current regulators, Data Package 5 3

SD-10 b. Rotating light beacon assembly, Data Package 3 3

SD-10 c. Sequenced flashing light system, Data Package 5 3

SD-10 d. Wave-Off system, Data Package 5 3