APPROVED DISAPPROV
ED
DIVISION 1
1 Section 01 11 00 30 33 GENERAL CONTRACT REQUIREMENTS
1.7 As-built Drawing 1 within 10 days after on-site
work completion.
2 Section 01 33 00 SUBMITTAL PROCEDURES
SD-01 a. Submittal Register 3
3 Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
SD-01 a. Environmental Protection Plan 3
SD-01 b. Dirt and Dust Control Plan 3
SD-01 c. Employee Training Records 3
SD-01 d. Environmental Manager Qualifications 3
SD-06 a. Laboratory Analysis Inspection 3
SD-06 b. Solid Waste Management Report 3
SD-07 a. Employee Training Records 3
SD-07 b. EMS Certificate Of Completion 3
SD-07 c. Certificate of Competency 3
SD-07 d. Erosion and Sediment Control Inspector Qualifications
SD-11 a. Stormwater Pollution Prevention Plan Compliance Notebook
SD-11 b. Waste Determination Documentation 3
SD-11 c. Solid Waste Management Report 3
SD-11 d. Sales Documentation 3
SD-11 e. Contractor Certification 3
DIVISION 2
4 Section - 02 41 00 DEMOLITION
SD-07 a. Demolition Plan 3 3
DIVISION 3
5 Section - 03 20 01 00 10 CONCRETE REINFORCEMENT
SD-02 a. Reinforcement 3
SD-03 a. Welding 3
SD-07 a. Reinforcing Steel 3
6 Section - 03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORK SD-03 a. Mixture Proportions 3
SD-05 a. Mixture Proportions 3
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER PROJECT TITLE
Airfield/Pavements IDIQ Contract, Misawa Aie Base Japan
SOLICITATION / CONTRACT NO.
FA520517R0006
(To be completed by Project Engineer) (To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
S H
O P
D R
A W
IN
G
S
D E
S
IG
N D
A
TA
S A
M P
LE
S
TE
S
T R
E P
O R
TS
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E R
'S
IN
S
TR
U C
TI
O
N S
P R
O D
U C
T D
A
TA
P R
E C
O N
S
TR
U C
TI
O
N S
U B
M
IT
TA
LS
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
R E
C O
R D
S
M A
N U
FA
C
TU
R
E R
C A
TA
LO
G D
A
TA
O P
E R
A
TI
O N
, M A
IN
TE
N A
N C
E M
A N
U A
LS
S C
H E
D U
LE
IN
S
TR
U
C
TI
O N
M S
D S
H E
E
TS
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
IN
G
R E
TU
R
N S
U S
P E
N S
E D
A
TE
S U
B M
IT
TA
L N
U M
B E
R S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)
Attachment 4 to RFP No. FA520517R0006 Date: 24 Apr 2017
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER PROJECT TITLE
Airfield/Pavements IDIQ Contract, Misawa Aie Base Japan
SOLICITATION / CONTRACT NO.
FA520517R0006
(To be completed by Project Engineer) (To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
S H
O P
D R
A W
IN
G
S
D E
S
IG
N D
A
TA
S A
M P
LE
S
TE
S
T R
E P
O R
TS
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E R
'S
IN
S
TR
U C
TI
O
N S
P R
O D
U C
T D
A
TA
P R
E C
O N
S
TR
U C
TI
O
N S
U B
M
IT
TA
LS
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
R E
C O
R D
S
M A
N U
FA
C
TU
R
E R
C A
TA
LO
G D
A
TA
O P
E R
A
TI
O N
, M A
IN
TE
N A
N C
E M
A N
U A
LS
S C
H E
D U
LE
IN
S
TR
U
C
TI
D S
H E
E
TS
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
IN
G
R E
TU
R
N S
U S
P E
N S
E D
A
TE
S U
B M
IT
TA
L N
U M
B E
R S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
SD-06 a. Testing and Inspection for CQC 3
SD-07 a. Qualifications 3
DIVISION 26
7 Section - 26 00 00 00 20 BASIC ELECTRICAL MATERIALS AND METHODS
SD-02 Wiring Diagrams and Installation Details 3
SD-03 Performance and Characteric Curves 3
DIVISION 31
8 Section - 31 00 00 EARTHWORK
SD-01 a. Shoring 3
SD-01 b. Dewatering Work Plan 3
SD-03 a. Utilization of Excavated materials 3
SD-06 a. Testing 3
SD-06 b. Borrow Site Testing 3
SD-07 a. Testing 3 9 Section - 31 05 19 GEOTEXTILE
SD-03 a. Thread 3
SD-04 a. Quality Assurance Samples and Tests 3
SD-07 a. Geotextile 3
10 Section - 31 11 00 CLEANING AND GRUBBING SD-03 a. Nonsaleable Materials 3
SD-04 a. Tree Wound Paint 3
SD-04 b. Herbicide 3
11 Section - 31 23 00 00 20 EXCAVATION AND FILL SD-01 a. Shoring and Sheeting Plan 3
SD-01 b. Dewatering Work Plan 3
SD-01 c. Blasting Work Plan 3
SD-06 a. Borrow Site Testing 3
SD-06 b. Fill and Backfill Test 3
SD-06 c. Select Material Test 3
SD-06 d. Porous Fill for Capillary Water Barrier 3
SD-06 e. Density Tests 3
DIVISION 32
12 Section - 32 01 11 51 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS
SD-04 a. Rubber and Paint Removal Sample 3
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER PROJECT TITLE
Airfield/Pavements IDIQ Contract, Misawa Aie Base Japan
SOLICITATION / CONTRACT NO.
FA520517R0006
(To be completed by Project Engineer) (To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
S H
O P
D R
A W
IN
G
S
D E
S
IG
N D
A
TA
S A
M P
LE
S
TE
S
T R
E P
O R
TS
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E R
'S
IN
S
TR
U C
TI
O
N S
P R
O D
U C
T D
A
TA
P R
E C
O N
S
TR
U C
TI
O
N S
U B
M
IT
TA
LS
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
R E
C O
R D
S
M A
N U
FA
C
TU
R
E R
C A
TA
LO
G D
A
TA
O P
E R
A
TI
O N
, M A
IN
TE
N A
N C
E M
A N
U A
LS
S C
H E
D U
LE
IN
S
TR
U
C
TI
D S
H E
E
TS
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
IN
G
R E
TU
R
N S
U S
P E
N S
E D
A
TE
S U
B M
IT
TA
L N
U M
B E
R S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
SD-07 a. Hogh-pressure Rubber and Paint Removal E 3
13 Section - 32 01 19 61 RESEALING OF JOINTS IN RIGID PAVEMENT SD-03 a. Joint Sealant 3
SD-04 a. Joint Filler 3
SD-04 b. Separating Tape 3
SD-04 c. Joint Backer Rod 3
SD-04 d. Joint Sealant 3 3
SD-06 a. Joint Sealant 3
SD-07 a. Equipment List 3
SD-08 a. Joint Sealant 3
14 Section - 32 01 24 HOT IN-PLACE RECYCLING OF BITUMINOUS PAVEMENTS SD-04 a. Samples 3
SD-06 a. Field Testing and Sampling 3
15 Section - 32 01 29 61 PARTIAL DEPTH PATCHING OF RIGID PAVING SD-02 a. Shop Drawings 3
SD-03 Mix Design 3
SD-03 b. Proprietary 3
SD-03 c. Pigmented Liquid Membrane-forming Compound 3
SD-04 a. Absorbent curing material 3
SD-04 b. Joint filler 3
SD-04 c. Joint sealant 3
SD-05 a. Concrete Mix Design 3
SD-06 a. Laboratory Test Results 3
SD-06 b. Aggregates gradation 3
SD-06 c. Cement 3
SD-06 d. Concrete slump 3
SD-06 e. Concrete air content 3
SD-06 f. Concrete strength (cylinder) 3
SD-06 g. Mixer calibration and efficiency 3
SD-07 a. Cement 3
SD-07 b. Aggregate 3
SD-07 c. Admixtures 3
SD-07 d. Absorbent curing material 3
SD-07 e. Pigmented liquid membrane-forming compou 3
SD-07 f. Waterproof Sheet 3
SD-07 g. Joint filler 3
SD-07 h. Joint sealant 3
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER PROJECT TITLE
Airfield/Pavements IDIQ Contract, Misawa Aie Base Japan
SOLICITATION / CONTRACT NO.
FA520517R0006
(To be completed by Project Engineer) (To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
S H
O P
D R
A W
IN
G
S
D E
S
IG
N D
A
TA
S A
M P
LE
S
TE
S
T R
E P
O R
TS
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E R
'S
IN
S
TR
U C
TI
O
N S
P R
O D
U C
T D
A
TA
P R
E C
O N
S
TR
U C
TI
O
N S
U B
M
IT
TA
LS
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
R E
C O
R D
S
M A
N U
FA
C
TU
R
E R
C A
TA
LO
G D
A
TA
O P
E R
A
TI
O N
, M A
IN
TE
N A
N C
E M
A N
U A
LS
S C
H E
D U
LE
IN
S
TR
U
C
TI
D S
H E
E
TS
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
IN
G
R E
TU
R
N S
U S
P E
N S
E D
A
TE
S U
B M
IT
TA
L N
U M
B E
R S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
16 Section - 32 11 16 BASE COURSE FOR RIGID AND SUBBASES COURSES FOR FLEXIBLE PAVING SD-03 a. Equipment 3
SD-06 a. Sampling and Testing 3
SD-06 b. Field Density Tests 3
17 Section - 32 11 23 AGGREGATE BASE COURSE SD-03 a. Plant, Equipment, and Tools 3
SD-06 a. Sampling and Testing 3
SD-06 b. Field Density Tests 3
18 Section - 32 12 10 BITUMINOUS TACK AND PRIME COATS SD-03 a. Waybills and Delivery Tickets 3
SD-03 b. Local/Regional Materials 3
SD-06 a. Sampling and Testing 3
19 Section - 32 12 15 HOT-MIX ASPHALT (HMA) FOR AIRFIELDS SD-02 a. Placement Plan 3
SD-03 a. Mix Design 3
SD-03 b. Contractor Quanlity Control 3
SD-04 a. Asphalt Cemnet Binder 3
SD-04 b. Agregates 3
SD-06 a. Agregates 3
SD-06 b. QC Monitoring 3
SD-07 a. Asphalt Cement Binder 3
SD-07 b. Test Laboratory 3
20 Section - 32 13 13 03 AIRFIELDS AND HEAVY-DUTY CONCRETE PAVEMENT LESS THAN 10000 CUBIC YARDS SD-03a. Equipment 3
SD-03b. Proposed Techniques 3
SD-05 a. Proportioning Studies 3
SD-06 a. Sampling and Testing 3
SD-06 b. Concrete Slump 3
SD-06 c. Air Content 3
SD-06 d. Pavement Thickness 3
SD-06 e. Flexural Strength 3
SD-06 f. Control Charts 3
SD-07 a. Contractor Quality Control Staff 3
SD-07 b. Laboratory Accreditation 3
21 Section - 32 17 24 00 10 PAVEMENT MARKINGS SD-03 a. Equipment 3
SD-03 b. Composition Requirements 3 3
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER PROJECT TITLE
Airfield/Pavements IDIQ Contract, Misawa Aie Base Japan
SOLICITATION / CONTRACT NO.
FA520517R0006
(To be completed by Project Engineer) (To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
S H
O P
D R
A W
IN
G
S
D E
S
IG
N D
A
TA
S A
M P
LE
S
TE
S
T R
E P
O R
TS
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E R
'S
IN
S
TR
U C
TI
O
N S
P R
O D
U C
T D
A
TA
P R
E C
O N
S
TR
U C
TI
O
N S
U B
M
IT
TA
LS
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
R E
C O
R D
S
M A
N U
FA
C
TU
R
E R
C A
TA
LO
G D
A
TA
O P
E R
A
TI
O N
, M A
IN
TE
N A
N C
E M
A N
U A
LS
S C
H E
D U
LE
IN
S
TR
U
C
TI
D S
H E
E
TS
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
IN
G
R E
TU
R
N S
U S
P E
N S
E D
A
TE
S U
B M
IT
TA
L N
U M
B E
R S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
SD-03 c. Qualifications 3
SD-06 a. Sampling and Testing 3
SD-07 a. Volatile Organic Compund (VOC) 3 22 Section - 32 92 19 SEEDING
SD-03 a. Wood Cellulose Fiber Mulch 3
SD-03 b. Fertilizer 3
SD-06 a. Topsoil Composition Tests 3
SD-07 a. State Certification and Approval for Seed 3
SD-08 a. Erosion Control Materials 3
23 Section - 32 92 23 SODDING SD-03 a. Fertilizer 3
SD-06 a. Topsoil Composition Tests 3
SD-07 a. Sod farm certification for sods 3 24 Section - 33 40 00 STORM DRAINAGE UTILITIES
SD-03 a. Placing Pipe 3
SD-04 a. Pipe for Culverts and Stirm Drains 3
SD-07 a. Resin Certification 3
SD-07 b. Pipeline Testing 3
SD-07 c. Hydrostic Test on Westertight Joints 3
SD-07 d. Determination of Density 3
SD-07 e. Frame and Cover for Gratings 3 25 Section - 33 43 00 00 20 AIRFIELD LIGHTING
SD-02 a. Landing signal officer (LSO) control panel 3
SD-02 b. Approach lighting frangible tower 3
SD-02 c. Each type of airfield lighting fixture installation 3
SD-02 d. Wind cone indicator assembly connection 3
SD-02 e. Wave-Off system 3
SD-03 a. Control cable 3
SD-03 b. Series airfield lighting cable 3
SD-03 c. Isolating transformers 3
SD-03 d. Constant current regulators 3
SD-03 e. Each type of runway and taxiway lighting fixture 3
SD-03 f. Each type of light bases 3
SD-03 g. Frangible couplings 3
SD-03 h. FAA Type P-606 sealant 3
SD-03 i. FAA Type L-823 connectors 3
SD-03 j. Circuit selector cabinets 3
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER PROJECT TITLE
Airfield/Pavements IDIQ Contract, Misawa Aie Base Japan
SOLICITATION / CONTRACT NO.
FA520517R0006
(To be completed by Project Engineer) (To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
S H
O P
D R
A W
IN
G
S
D E
S
IG
N D
A
TA
S A
M P
LE
S
TE
S
T R
E P
O R
TS
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E R
'S
IN
S
TR
U C
TI
O
N S
P R
O D
U C
T D
A
TA
P R
E C
O N
S
TR
U C
TI
O
N S
U B
M
IT
TA
LS
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
R E
C O
R D
S
M A
N U
FA
C
TU
R
E R
C A
TA
LO
G D
A
TA
O P
E R
A
TI
O N
, M A
IN
TE
N A
N C
E M
A N
U A
LS
S C
H E
D U
LE
IN
S
TR
U
C
TI
D S
H E
E
TS
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
IN
G
R E
TU
R
N S
U S
P E
N S
E D
A
TE
S U
B M
IT
TA
L N
U M
B E
R S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
SD-03 k. Pilot relay panel 3
SD-03 l. Control transfer panel 3
SD-03 m. Control panel 3
SD-03 n. Sequenced flashing light system components 3
SD-03 o. Wave-Off system components complete 3
SD-06 a. Counterpoise system test 3
SD-07 a. Installer Qualifications 3
SD-07 b. Construction Outage Plan 3
SD-10 a. Constant current regulators, Data Package 5 3
SD-10 b. Rotating light beacon assembly, Data Package 3 3
SD-10 c. Sequenced flashing light system, Data Package 5 3
SD-10 d. Wave-Off system, Data Package 5 3
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)