Statement_of_Work_for_Gaseuos_Nitrogen_12_Sep_18_V4.pdf
PDF 15 KB Posted
- Attached to
- Gaseous Nitrogen 99. 99% Pure
- Solicitation number
- FA515-18-Q-8096
About this file
Version 4: Changes include, return to 45 Bottles needed, added second delivery date, solicitation period has been extended to accommodate changes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined_Synopsis-Solicitation_v4.pdf | ||
| Combined_Synopsis-Solicitation_Nitrogen_V2.pdf | ||
| Statement_of_Work_for_Gaseuos_Nitrogen_11_Sep_18_V3.docx | DOCX document | |
| MIL-PRF-27401.pdf | ||
| Statement_of_Work_for_Gaseuos_Nitrogen_15_Aug_18_V2.docx | DOCX document | |
| Combined_Synopsis-Solicitation_Nitrogen.pdf | ||
| 12_Bottle_Rack_Example.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for Gaseous Nitrogen for
MDA Flight Test Missions FY2019
The Contractor shall provide forty-five (45) 6000-psi (6K) bottles of Nitrogen Gas (GN2) in accordance with MIL-P-27401, Type I, Grade B. Purity shall be 99.99% by volume, minimum. Impurities: 100 ppm by volume, MAX; Water 11.5 ppm, total hydrocarbons as Methane 5 ppm, Oxygen 50 ppm, Argon 20 ppm, Carbon Dioxide 5 ppm, Carbon Monoxide 5 ppm. Each individual bottle shall be tested and certified. Bottles shall be sealed with shrink-wrap after fill. The bottles shall be delivered in fifteen (15) bottle racks. Documentation and certifications for each bottle shall be provided when delivered. The certifications will be provided to the MDA/TCT Forward Staging Area (FSA) Officer in Charge (OIC), MDA Senior Flight Test Engineer or the Hickam POC office as identified at time of delivery. Schedule for delivery is as follows: Thirty (30) Bottles provided Thirty (30) Days ADC and remaining fifteen (15) bottles on 1 July 2019. The first thirty (30) bottles will be transported from Hickam AFB HI to Andersen AFB Guam and returned to Hickam AFB on about 15 Dec 2018 for return to provider. The remaining fifteen (bottles) will be coordinated as soon as mission schedule is known. All bottles utilized for the 6000-psi shall be capable of being transportable by military air and/or commercial air and marked with the appropriate DOT markings. The bottles will have as a minimum a capability of being marked as DOT 3A. (MDA will verify DOT 3A sufficient prior to contract award.)
Schedule for Delivery
Thirty (30) Bottles with Certifications: 30 Days ARO
Fifteen (15) Bottles with Certifications: NLT 1 Jul 2019
File details come from the government source that posted it.