Newspaper Digitization SOW.pdf
PDF 118 KB Posted
- Attached to
- Newspaper Digitization
- Solicitation number
- FA5004SSNewspaper
About this file
This is a Statement of Work (SOW) for the Eielson AFB Historical Newspaper Digitization Project. The Government requires the contractor to digitize approximately 1,952 newspaper volumes spanning 1952-1979 from the Eielson Air Force Base collection, which currently exists only in fragile paper format at high risk of degradation and loss.
The contractor shall provide complete digitization services including scanning all newspapers at minimum 300 dpi resolution in full color and creating three distinct digital file formats for each page: Archival Master Files in uncompressed TIFF format (LZW compression acceptable), Access Files in high-quality JPEG format, and Searchable Document Files as multi-page, searchable PDF/A format with Optical Character Recognition applied. The contractor must deliver the complete digital collection on five separate external hard drives, each containing the entire collection in all three file formats, and securely return all original newspaper volumes in the same archival boxes provided by the Government using trackable shipping methods. The contractor shall provide monthly status reports by the 5th business day of each month and serve as a single point of contact for project management. The Period of Performance is 120 calendar days beginning on the first business day after the contractor confirms receipt of the Government-furnished newspapers. Final acceptance is contingent upon safe return of all original volumes, confirmed receipt of all five hard drives, and successful completion of a quality assurance review within 10 business days of drive delivery, which will include spot-checking files to verify 300 dpi resolution, correct file formats, and searchable text in PDFs.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Eielson AFB Historical Newspaper Digitization Project
1.0 BACKGROUND AND OBJECTIVE
1.1 Background: The Eielson Air Force Base Historian's office maintains a collection of the base newspaper from 1952-2012. This collection is a unique and invaluable historical resource that is currently only available in its original, fragile paper format. Due to age and frequent use, the collection is at high risk of permanent degradation and loss.
1.2 Objective: The objective of this contract is to professionally digitize the most vulnerable part of the collection (approximately 1952-1979) to preserve it and make it accessible to all base personnel. The contractor shall convert the physical newspaper volumes into high-quality, searchable digital formats.
2.0 SPECIFIC TASKS
The contractor shall perform all tasks necessary to provide a complete, turn-key digitization service. The price for this effort shall be inclusive of all pages/surfaces contained within the Government-furnished newspaper collection.
• 2.1 Scanning and Image Processing:
• The contractor shall scan all provided newspaper surfaces at a minimum resolution of 300 dpi in full color.
• For each scanned page, the contractor shall create and save three (3) distinct digital file formats:
1. Archival Master File: Uncompressed TIFF format (LZW compression is acceptable).
2. Access File: High-quality JPEG format.
3. Searchable Document File: A multi-page, searchable PDF/A format file for each complete newspaper issue. Optical Character Recognition (OCR) shall be applied to make the text within the PDFs searchable.
• 2.2 Project Management and Reporting: The contractor shall provide a single point of contact for the project and deliver monthly status reports to the Government.
• 2.3 Delivery of Digital and Physical Assets:
• The contractor shall deliver the complete digital collection on five (5) separate external hard drives. Each hard drive shall contain the entire collection in all three specified file formats (TIFF, JPEG, PDF/A).
• The contractor shall be responsible for the secure, trackable return shipment of all original newspaper volumes in the same archival boxes in which they were sent.
3.0 DELIVERABLES
Eielson Newspaper Digitization SOW
Deliverable PWS Para
Frequency / Due Date
Monthly Status Report (via email)
2.2 Monthly, by the 5th business day of each month.
External Hard Drives (Five) 2.3 Delivered no later than the PoP end date.
Return of Original Newspapers 2.3 Shipped no later than the PoP end date.
Shipment Tracking Information 2.3 Provided to Requirement’s Owner within 24 hours of shipment.
4.0 GOVERNMENT-FURNISHED PROPERTY (GFP)
The Government will provide the full collection of Eielson AFB newspapers from 1952- 1979 for digitization. The Government acknowledges that some portions of the collection may be missing or in a deteriorated condition that impacts final image quality. All original materials will be packed in archival boxes for shipment.
5.0 HANDLING OF GOVERNMENT PROPERTY
The contractor shall handle the fragile, irreplaceable newspaper collection with the utmost care. The original materials shall be returned in the same archival boxes provided by the Government. Both outbound and return shipments must use a trackable shipping method.
6.0 PERIOD OF PERFORMANCE (PoP)
The Period of Performance shall be 120 calendar days, beginning on the first business day after the contractor provides email confirmation of receipt of the government-furnished newspaper collection to the Requirement’s Owner.
7.0 ACCEPTANCE CRITERIA
Final acceptance of this project is contingent upon the Government's verification of the successful completion of all three of the following conditions:
• 7.1 The safe return and confirmed receipt of all original newspaper volumes at Eielson AFB.
• 7.2 The confirmed receipt of all five (5) external hard drives by the designated Government recipients.
• 7.3 The Requirement’s Owner has successfully conducted a quality assurance review of the digital files. This review, to be completed within 10 business days of receiving the hard drives, will consist of spot-checking a random sample of
Eielson Newspaper Digitization SOW files to verify they meet all technical requirements outlined in SOW paragraph 2.1 (e.g., 300 dpi resolution, correct file formats, searchable text in PDFs).
Final acceptance will be documented in writing by the Contracting Officer or Requirement’s Owner.