Dorm Cameras Q_A List.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Surveillance Camera Equipment and Installation Federal contract opportunity
Solicitation number
FA500424Q0036
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document contains a Question and Answer sheet related to Solicitation FA5004-24-Q-0036 for the installation of a new security camera system at Clear Space Force Station in Alaska. The requirement is to furnish and install Network Video Recorder (NVR) systems with 44 cameras total across 5 buildings (202, 203, 204, 209, and 210). The cameras must be a minimum of 4 megapixels and provide facial recognition capability. The system requires 30-day continuous recording storage and backup power. The solicitation has a 90-day period of performance. The Q&A addresses details such as camera types, cabling, power requirements, building layouts, and whether a centralized system is permitted. The submission date for the solicitation was extended from August 27 to August 30, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Surveillance Camera Equipment and Installation, newest first.
File Type Posted
Solicitation Amendment - FA500424Q0036.pdf PDF
Solicitation Amendment FA500424Q00360001 SF 30.pdf PDF
Attachment 1 - PWS 27 Aug 24 V3.pdf PDF
Blank CSFS VAR.xlsx XLSX spreadsheet
Attachment 3 Building Floor Plans.pdf PDF
Attachment 2 - SCA Wage Determination.pdf PDF
Attachment 1 - PWS 9 Aug 2024.pdf PDF
Solicitation - FA500424Q0036.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Solicitation#FA5004-24-Q-0036
Project Name:Clear Dorm Cameras
Date:26-Aug-24
ITEM #Reference DocumentQuestionsReference DocumentAssignedGovernment ResponseResponse Date
EXAMPLEStatement of Work (SOW)EX:
1SolicitationWhat is the existing system and camera type make and model?SWSCurrently no system in place. This will be a brand-new system.8/21/24 10:27
2SolicitationIs there a preferred manufacturer for the new system?SWSNo manufacturer preference, only performance preference IAW the PWS.8/21/24 10:27
3Performance Work Statement
PWSWhat is the breakdown of number of cameras per location?

A. What kind of cameras are we spec'ing out? Dome, PTZ, etc B. Indoor or Outdoor?

C. If outdoor, wall or pole mount? SWS A.PTZ and/or Dome, 360 degree in the center of Bldg 202, 203, 204 to capture as much of the hallway as possible.

B. All cameras will be indoors.

C. Addressed in B.8/21/24 10:27
4Performance Work Statement
PWSIs the dorm ceilings a drop ceiling for installer ease of access?SWSDorm facilities are drop ceiling (202, 203, 204, and 210),
MWR facility has both hard and drop ceilings.8/21/24 10:27
5Performance Work Statement
PWSThe PWS states, "1.2.3 NVR's will have the capability to record and store data collected on 44 cameras" Does that mean that the SFS wishes for each NVRs in one of the buildings to have the ability to record all 44 cameras from 5 locations?SWSEach facility (Bldg) should be its own system, 5 stand-alone systems, each system only needing to control the cameras for that facility (Bldg). There is a total of 44 cameras. These systems do not need to be tied to one another.8/21/24 10:27
6SolicitationWill this be on a subscription service?SWSNo, CCTV with a 30 day Storage8/23/24 10:25
7SolicitationIs there Fiber running between Buildings?SWSYes, fiber runs between each facility and throughtout the installation.8/23/24 10:25
8SolicitationIs there WiFi?SWSYes8/23/24 10:25
9Performance Work Statement
PWSDo the Cameras need to be connected to the same system?SWSYes, each facility needs to be a stand-alone system, however.8/23/24 10:25
10SolicitationWill a backup power system be required?SWSYes, it will need to last until the generator turns on. (2 minutes)8/23/24 10:25
11Performance Work Statement
PWSDo you want Raceway installed for wiring?SWSNo, if possible utilize openings between floors in each facility where possible.8/23/24 10:25
12Performance Work Statement
PWSDo contractors need to provide switches?SWSIs not anticipated.8/23/24 10:25
13Performance Work Statement
PWSIs there outlets located in 210?SWSYes8/23/24 10:25
14Performance Work Statement
PWSWhat is the Period of Performance?SWS90 days ARO8/23/24 10:25
15Performance Work Statement
PWSIs a FIPS enabled server required?SWSWe do not see a need for a server. We have a small camera system setup in our gym on site with the NVR being connected directly to a computer monitor. If thios standar needs to be adhered to for camera feed transmissions, then cameras need to be purchased to meet the industry standard.8/21/24 14:51
16Performance Work Statement
PWSIs cable management of the networking cabling a requirement to meet fire code standards?SWSNot foreseen at this time, however pending options from questions below could change this requirement. Meaning if there is a centralized location instead of each facility being on a separate network of cameras, there should be some kind of cable management needed.8/21/24 14:51
17SolicitationWould the Government consider performacne objective to be restated for the recording to be record on motion vs 90 days continuous storage? Would 30 days storage with record on motion be acceptable?SWSPWS updated to reflect 30-day storage but continuous reccording IAW PWS.8/21/24 14:51
18Performance Work Statement
PWSIs the Government open to a centralized storage location for cost savings and for future expansion?SWSFuture growth is not needed at this time.8/21/24 14:51
19Performance Work Statement
PWSWould the Government consider connecting all the dormitories together having a head end at one location enterprising all of the other locations to save the Government on costs?SWSThe current PWS does not account for this so will not be supported.8/21/24 14:51
20Performance Work Statement
PWSIs there a specific megapixel requirement for each of the cameras?SWS4 Megapixel min, or a resolution that will provide enough detail to perform facial recognition, per PWS.8/21/24 14:51
21SolicitationThe site SAM.gov and the Plans Room have posted a submission date of Aug 30, 2024. The "Solicitation +-+FA500424Q0036" attachment provided the SF1449, and in Title Block 8 indicates the submission due is Aug 27, 2024. Which is the correct submission date?CONSSolicitation close date was extended.8/23/24 10:25
22SolicitationThe RFQ provided no direction regarding date and time for question submission. Can I forward a few questions today?CONSQuestion Deadline was set for 22 Aug, 20248/23/24 10:25
23Performance Work Statement
PWSAre the affected corridors in all dorms acoustical ceilings?SWSYes, all areas are drop ceilings with acoustical tile. 209 has a mix of both hard ceiling and acoustical tiling.8/23/24 10:25
24Performance Work Statement
PWSAccording to section, 1.3.4 Conduit will be used to house cabling running from the NVR system to the cameras where applicable to minimize exposure to weather elements or tampering. Is it intended that all cabling pathways are to be in conduits when routed above acoustical ceilings?SWSNo, conduit will not be needed above acoustical ceiling.8/23/24 10:25
25Performance Work Statement
PWSAre conduit pathways required to be concealed? Or is surface mounting allowed when required?SWSSurface mount is allowed when required.8/23/24 10:25
26Performance Work Statement
PWSStorage room 210 not shown, where is it located?SWSIn rooms 110/104, whichever is easier.8/23/24 10:25
27Performance Work Statement
PWS202, 203, and 204, are they identical regarding floor layout, as depicted in 204?SWSThat is correct8/23/24 10:25
28Performance Work Statement
PWSBldg. 209 basement, where the bowling alley is located, are any cameras required in this area?SWSYes, drawing was provided to CONS showing location of 1 camerain the basement.8/23/24 10:25
29Performance Work Statement
PWSThere is a concourse between 210 to 209, are cameras required?SWSNo cameras in this area.8/23/24 10:25