This document contains questions and answers related to a federal contract opportunity for water and wastewater sample analysis services at Eielson Air Force Base in Alaska.
The key details are:
- The contract covers sampling and analysis for the Eielson Wastewater Treatment Plant (WWTP), WWTP biosolids disposal, Water Treatment Plant (WTP) Filter Backwash Pond, and WTP Total Organic Carbon (TOC) and Perfluorinated Chemical (PFAS) sampling.
- The quantities requested in the price schedule appear to be maximum amounts, differing from the actual permit requirements. Contractors should provide unit pricing per sample.
- For the WWTP, the contract covers 52 primary effluent, 52 final effluent, 52 influent, and 26 volatile suspended solids influent samples per year.
- For the WTP, the contract covers 12 monthly filter backwash pond samples, 2 annual filter backwash pond samples, 4 semi-annual filter backwash pond/receiving water samples, and 8 quarterly GAC TOC and PFAS samples.
- The solicitation number is FA500424Q0006 and responses are due by April 3, 2023 at 12:00pm Alaska Time.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers - FA500424Q00060001.docx | DOCX document | |
| FA500424Q0006 -Waste Water Sample Analysis Amendment 0001.pdf | ||
| FA500424Q0006 -Waste Water Sample Analysis.pdf | ||
| Attachment 3. AKG380000 FnlPrmt.pdf | ||
| Attachment 4. 2018 1127 EAFB WWTP QAPP.pdf | ||
| Attachment 5. WWTP-WTP Sample & Analysis PWS 2023.pdf | ||
| Attachment 8. Pricing Schedule.xlsx | XLSX spreadsheet | |
| Attachment 2. Eielson AFB Biosolids Land Application Permit Renewal, Permit No. SWYA068-19.pdf | ||
| Attachment 6. Wage Determination 15-5683.txt | TXT text file | |
| Attachment 7. 2021 EAFB WATER TREATMENT PLANT QAPP.pdf | ||
| Attachment 1. WWTP Permit 2006DB0045.pdf | ||
| FA500424Q0006 - Waste Water Sample Analysis.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) Attachment 1 for the WWTP permit expired on November 2, 2011. I don't recall running any samples identified in section 1.3 last October, so it appears as if these may not be required or has changed under a current permit. Did the priority pollutants replace these tests?
If these tests are required, should a new CLIN be included on attachment 8 since it does not appear as if there is a current line item for the groundwater monitoring well samples. These tests are also identified in attachment 4 (QAPP Pages 42 and 43), however that document has a similar expiration date of November 2, 2011 even though the QAPP was updated in April of 2018.
ANSWER: The sampling done for the monitoring wells is conducted by an engineering firm under contract through the CE Environmental Flight and are not part of this set of sampling for the water/wastewater plants.
2) Quantity of Wastewater Weekly Samples at 104 for CLIN 0001 and 52 for CLIN 0002. I am assuming the following:
Item 0001:
52 Primary Effluent samples for BOD and TSS 52 Final Effluent samples for BOD, TSS and Fecal Coliform
Item 0002:
52 Influent samples for BOD and TSS 26 Influent samples for TVSS
Are these numbers correct? This reflects the current monitoring that we have been providing for the weekly WWTP testing.
ANSWER: Those are possible maximum amounts that had to be accounted for in case they are needed. That amount differs from what is required per the individual permits for the water/wastewater treatment plants. The max amount of sampling is essentially double the amount than what is required per the discharge permit. Provide a ‘Unit Cost’ per sample.
For the WTP Analysis, it appears as if the quantities are doubled from what is required, but it could be interpreted differently. Does this quote reflect two years of monitoring? Below is a breakdown of what I'm seeing:
3) Item 0008:
Attachment 5 shows the breakdown of samples for the Monthly WTP Filter Backwash Pond. In the previous quote, I provided an estimate for 6 samples since the weir and slough are frozen for half the year. The price schedule (attachment 8) is requesting a quote for 12 samples. I will provide pricing for 12 unless otherwise directed.
ANSWER: Those are possible maximum amounts that had to be accounted for in case they are needed. That amount differs from what is required per the individual permits for the water/wastewater treatment plants. The max amount of sampling is essentially double the amount than what is required per the discharge permit. Provide a ‘Unit Cost’ per sample.
4) Item 0009:
Annual WTP Filter Backwash Pond Sample Analysis. A single sample looks to be required, however a quantity of 2 are requested on the price schedule. I will include pricing for 2 samples unless otherwise directed.
ANSWER: Those are possible maximum amounts that had to be accounted for in case they are needed. That amount differs from what is required per the individual permits for the water/wastewater treatment plants. The max amount of sampling is essentially double the amount than what is required per the discharge permit. Provide a ‘Unit Cost’ per sample.
5) Item 0010:
Semi-Annual Filter Backwash Pond Effluent/Weir Samples. A quantity of 4 samples is requested on the quote. Are these 2 samples for the Filter Backwash Pond and 2 samples for hardness on the Receiving Water or 4 total samples for the Backwash and Receiving Water combined? In 2023 I quoted for just 2 sets of Backwash and Receiving Water. For this quote, I will provide pricing for 4 sets of Backwash/Receiving Water samples unless otherwise directed.
ANSWER: Those are possible maximum amounts that had to be accounted for in case they are needed. That amount differs from what is required per the individual permits for the water/wastewater treatment plants. The max amount of sampling is essentially double the amount than what is required per the discharge permit. Provide a ‘Unit Cost’ per sample.
6) Item 0011:
WTP Quarterly GAC TOC and PFAS samples would be 4 sets per year, but the quantity on the price schedule is requesting 8. I will provide pricing for 8 sets of PFAS/TOC samples unless otherwise directed.
ANSWER: Those are possible maximum amounts that had to be accounted for in case they are needed. That amount differs from what is required per the individual permits for the water/wastewater treatment plants. The max amount of sampling is essentially double the amount than what is required per the discharge permit. Provide a ‘Unit Cost’ per sample.