J&A for Brand Name-Honeywell
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_-_FA500419QA026.pdf | ||
| Vindicator_Upgrade_SOO_190117_(002).docx | DOCX document | |
| Qty_Parts_&_Price_List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Single Source Justification (Simplified Acquisition)
Page 1 of 1Updated: 9 Jun 16
Section A: General Contract Information
Contracting Activity: 354 CONS
Project/Program Name: IDS Upgrade
Purchase Request/Identification Number:
Estimated Contract Cost (including Options): $353,454.95
Section B: Description of the Supplies/Services Required
Replacement of existing Eielson AFB Honeywell / Vindicator IDS equipment that is running non-upgradeable version 5.5 software. The purchase also upgrades software and licensing for existing Honeywell / Vindicator equipment that is currently upgradeable. This is necessary for the base IDS equipment to be fully compatible with all the new Honeywell / Vindicator equipment being installed as part of construction projects related to activation of F-35 squadrons.
Section C: Justification for Soliciting from a Single Source or Brand Name
Subject matter experts state that for equipment to be fully compatible with existing Honeywell / Vindicator systems, all new equipment, software, and protocols require the same brand of equipment as currently installed. The existing base Honeywell / Vindicator equipment cannot accept the amount of information from the new equipment currently being installed in new F-35 facilities. As buildings for the F-35 project come on line, error messages are being received at the annunciating equipment in the Base Defense Operations Center (BDOC). These errors will continue to increase as additional buildings come on-line which will begin to crash the IDS system. An upgraded system will mitigate these errors.
Section D: Efforts to Obtain Competition
Market research has identified multiple vendors capable of upgrading the Honeywell / Vindicator system which will provide price competition, however; brand name components are essential as this equipment must be fully compatible with the existing Honeywell / Vindicator systems located throughout the installation, including all the new secure areas of the F-35 build. If the entire system was replaced for all of Eielson AFB to allow for other brands of IDS systems to participate, it would result in a cost of several million dollars and not meet schedule demands.
Section E: Steps to Preclude Future Single Source or Brand Name Awards
The only way to avoid the brand-name justification for procuring IDS equipment upgrades is to have a retrofit of the system to include every building with existing alarms and all annunciating equipment at the BDOC and Alternate BDOC. As stated above this type of replacement would cost several millions of dollars and result in mass interruptions in protection of all secure facilities on the installation and cause users to watch their facilities 24/7 and jeopardize bed-down of F-35 aircraft.
Section F: Contracting Officer's Determination
I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
Date
17-Apr-2019
Typed Name and Rank/Grade of Contracting Officer
Nicholas P. Rogers, SSgt
Signature of Contracting Officer
Date
18-Apr-2019
Typed Name and Rank/Grade of Chief, Contracting Office
M. McAllister Gentry, Maj
Signature of Chief, Contracting Office
Single Source Justification (Simplified Acquisition) Page of Updated: 9 Jun 16 Section A: General Contract Information Section B: Description of the Supplies/Services Required Section C: Justification for Soliciting from a Single Source or Brand Name Section D: Efforts to Obtain Competition Section E: Steps to Preclude Future Single Source or Brand Name Awards Section F: Contracting Officer's Determination I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
9.0.0.2.20120627.2.874785
| CurrentPage: |
| PageCount: |
| Contract_Activity: 354 CONS |
| Project_Name: IDS Upgrade |
| PR-ID_Number: |
| Estimated_Cost: $353,454.95 |
| TextField1: |
| Date: 17-Apr-2019 |
| Date: 18-Apr-2019 |
| Name: Nicholas P. Rogers, SSgt |
| Name: M. McAllister Gentry, Maj |
| Signature: |
File details come from the government source that posted it.