Q_ _A_Hangar_Flooring__7.pdf

PDF 94 KB Posted

Attached to
Hangar Floor Repaint Federal contract opportunity
Solicitation number
FA5004-15-B-C007
Issued by
Department of the Air Force Pacific Air Forces

About this file

Q A Hangar Flooring 7

View the file

Other files for this federal contract opportunity

Other files attached to Hangar Floor Repaint, newest first.
File Type Posted
Q__A_Hangar_Floor__5.pdf PDF
JA-0_-_Statement_of_Work_4_June_2015.pdf PDF
Q_ _A_Hangar_Flooring__6.pdf PDF
JA_1_-_Specifications_4_June_2015.pdf PDF
FA5004-15-B-C007-0004.pdf PDF
JA-4_-_AF_Form_66_Schedule_of_Material_Submittals_4_June_2015.xls XLS spreadsheet
FA5004-15-B-C007-0003.pdf PDF
JA-4_-_AF_Form_66_FTQW_15-1021.xls XLS spreadsheet
JA-1_-_Specifications.pdf PDF
JA-0_-_Statement_of_Work.pdf PDF
Amendment__2.pdf PDF
Q_ _A__Hangar_Flooring__4.pdf PDF
Q__A_Hangar_Floor__3.pdf PDF
Site_Visit_Sign_in_Sheet_Hangar_Floor.pdf PDF
Q__A_Hangar_Flooring__2.pdf PDF
Q__A_Hangar_Flooring__1.pdf PDF
FA5004-15-B-C007_Mod_00001.pdf PDF
JA-1_-_Specifications_14_May_2015.pdf PDF
FA5004-15-B-C007_-_Hangar_Floor_IFB.pdf PDF
JA-2_-_Taxiway_and_stationary_line_markings.pdf PDF
JA-4_-_Floorplan.pdf PDF
JA-1_-_Specifications.pdf PDF
JA-6_-_Photos.pdf PDF
JA-0_-_Statement_of_Work.pdf PDF
JA-3_-_ETL_96-5.pdf PDF
JA-7_-_Wage_Determination.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Answers to Questions #7

Project FTQW 15-1021

Repaint Hangar Floor (B1232)

4 June, 2015

Q1. Amendment 3 issued a new spec for a 5 coat fuel resistive system replacing the original 3 coat fuel resistive system. The basis of design product listed in the SOW are still for a 3 coat system and the submittal register refers to a thin film system. The is a big difference between the two, as the five coat system is a ¼ inch (250 mil) troweled epoxy mortar while the 3 coat system is only a 13-20 mil coating system. Can you clarify which system is required?

A1. Yes we are now going with a 5 coat system. Updated SOW and Specifications have been provided.

Q2. Can the patch test be done and approved right prior to the start of work?

A2. Yes the awarded contractor can come up and do a test patch prior to construction start and extend their time in Alaska.