JA-4_-_AF_Form_66_FTQW_15-1021.xls
XLS spreadsheet 41 KB Posted
- Attached to
- Hangar Floor Repaint Federal contract opportunity
- Solicitation number
- FA5004-15-B-C007
About this file
Revised Material Submittal Register (AF 66)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q__A_Hangar_Floor__5.pdf | ||
| Q_ _A_Hangar_Flooring__7.pdf | ||
| JA_1_-_Specifications_4_June_2015.pdf | ||
| JA-0_-_Statement_of_Work_4_June_2015.pdf | ||
| Q_ _A_Hangar_Flooring__6.pdf | ||
| FA5004-15-B-C007-0004.pdf | ||
| JA-4_-_AF_Form_66_Schedule_of_Material_Submittals_4_June_2015.xls | XLS spreadsheet | |
| FA5004-15-B-C007-0003.pdf | ||
| JA-1_-_Specifications.pdf | ||
| JA-0_-_Statement_of_Work.pdf | ||
| Amendment__2.pdf | ||
| Q_ _A__Hangar_Flooring__4.pdf | ||
| Q__A_Hangar_Floor__3.pdf | ||
| Site_Visit_Sign_in_Sheet_Hangar_Floor.pdf | ||
| Q__A_Hangar_Flooring__2.pdf | ||
| Q__A_Hangar_Flooring__1.pdf | ||
| FA5004-15-B-C007_Mod_00001.pdf | ||
| JA-1_-_Specifications_14_May_2015.pdf | ||
| JA-6_-_Photos.pdf | ||
| FA5004-15-B-C007_-_Hangar_Floor_IFB.pdf | ||
| JA-2_-_Taxiway_and_stationary_line_markings.pdf | ||
| JA-4_-_Floorplan.pdf | ||
| JA-1_-_Specifications.pdf | ||
| JA-0_-_Statement_of_Work.pdf | ||
| JA-3_-_ETL_96-5.pdf | ||
| JA-7_-_Wage_Determination.pdf |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions to Project Manager for Completing the AF 66 | |
| 1 | Save this Template Form 66 in your project folder as "AF 66 - FTQW XX-XXXX." |
| 2 | Enter project number and title/bldg number in the orange cells. |
| 3 | Review the schedule items not highlighted in yellow. If any item is not applicable to your project, select the row number and right-click to delete it. |
| 4 | Do not remove any of the yellow schedule items - these are required for every project. |
| 5 | When you have removed all unneeded schedule items, click on the light green cell. Grab the bottom right corner and "drag" your cursor to the last schedule item. This will re-number the items. |
| 6 | When you are finished, remove the highlighting from the sheet. (Hit Ctrl-A and then select "none" for Fill Color.) |
| 7 | Save your changes and email the file to the CONS administrator when you submit your package. |
AF 66
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT TITLE | SOLICITATION/ CONTRACT NUMBER | |||||||||||||||||||
| FTQW | 15-1021 | Maintain Hangar Floor | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED = | 3 | REQUIRED SUBMISSION DATE | ||||||||||||||||||||
| Line Number | ITEMS OR DESCRIPTION | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CEO/CEOII | EPA | MSDS | OTHER | PLANS | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBER | DATE CONTRACTOR | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||
| OF ITEM, CONTRACT REFERENCE, TYPE OF | NOTIFIED | |||||||||||||||||||||
| SUBMITTAL | APPROVED | DIS-APPROVED | ||||||||||||||||||||
| 1 | Progress Schedule | x | 10 Days Prior to Construction Start | |||||||||||||||||||
| 2 | AF Form 103 | x | 15 Days Prior to Construction Start | |||||||||||||||||||
| 3 | Construction Operation and Safety Plan | x | 10 Days Prior to Construction Start | |||||||||||||||||||
| 4 | Accident Prevention Plan | x | 10 Days Prior to Construction Start | |||||||||||||||||||
| 5 | Safety and Health Program | x | 10 Days Prior to Construction Start | |||||||||||||||||||
| 6 | Joint Sealant | x | x | x | 10 Days Prior to Construction Start | |||||||||||||||||
| 7 | Thin Film Flooring System | x | x | x | 10 Days Prior to Construction Start | |||||||||||||||||
| 8 | White Aluminum Oxide Non-Skid Grit | x | x | 10 Days Prior to Construction Start | ||||||||||||||||||
| 9 | Work Plan | x | 10 Days Prior to Construction Start | |||||||||||||||||||
| 10 | Waste/Borrow Pit Coordination | x | 10 Days Prior to Construction Start | |||||||||||||||||||
| 11 | Construction Drawings | x | 10 Days Prior to Construction Start | |||||||||||||||||||
| 12 | Material Data Sheet (non-hazardous) | x | 10 Days Prior to Construction Start | |||||||||||||||||||
| 13 | Waste Disposal Plan | x | Prior to Construction Start | |||||||||||||||||||
| 14 | Environmental Permit Documentation | x | x | Prior to Construction Start | ||||||||||||||||||
| 15 | Primer | x | Diuring Construcion | |||||||||||||||||||
| 16 | Urethane Topcoat | x | Diuring Construcion | |||||||||||||||||||
| 17 | Patch Test Demonstration | x | Diuring Construcion | |||||||||||||||||||
| 18 | Adhesion Testing | x | Diuring Construcion | |||||||||||||||||||
| 19 | Solid Waste Weight Tickets | x | End of the Month they are Generated | |||||||||||||||||||
| 20 | Hazardous Materials Management | x | x | Quarterly/Upon Project Completion | ||||||||||||||||||
| 21 | Additional Hazardous Material | x | x | 7 Days Prior to bringing on site | ||||||||||||||||||
| 22 | Hazardous Waste Accumulation Log | x | Initial/Quarterly/Final | |||||||||||||||||||
| 23 | Asbestos Waste Manifest | x | x | Prior to Asbestos Removal | ||||||||||||||||||
| 24 | Suspected Hazardours Materials | x | After hazard has been found | |||||||||||||||||||
| 25 | Water Based Alkaline Degreaser | x | 15 Days Prior to Project Close-Out | |||||||||||||||||||
| 26 | Manufacturer Warranty Information | x | 15 Days Prior to Project Close-Out | |||||||||||||||||||
| 27 | As-Built Drawings w/ CD Copy | x | x | 15 Days Prior to Project Close-Out | ||||||||||||||||||
| Schedule of Material Submittals, MAR 05 (SAF/AQCP) / PREVIOUS FORM IS OBSOLETE |