Answers to Questions #3

Project FTQW 15-1021

Repaint Hangar Floor (B1232)

14 May 2015

Q1. Does the existing joint sealant need to be replaced with new sealant?

A1. Yes. The joint sealant shall be replaced. Contractors may epoxy over the expansion joints.

Q2. Is a NACE Inspector all that is required for the project? Do contractors also require a technical representative?

A2. Yes the NACE inspector is required along with a technical representative. In the ETL 96-5, paragraphs 5.1.2 and 5.1.3 state that it is required for the contractor to have a technical representative.