JA-1_Roadway_Painting_FTQW11-2009_SOW_IFB.pdf
PDF 12 KB Posted
- Attached to
- Roadway Painting Federal contract opportunity
- Solicitation number
- FA5004-14-B-C006
About this file
Attachment JA-1 Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5004-14-B-C006-0003_Amendment.pdf | ||
| FA5004-14-B-C006-0002_Amendment.pdf | ||
| JA-13_Roadway_Painting_questions_and_answers_1.pdf | ||
| JA-12_ETL-97-17.pdf | ||
| FA5004-14-B-C006-0001.pdf | ||
| JA-3_Technical_Specifications_Roadway_Painting.pdf | ||
| JA-8_Roadway_Paint_Estimated_Quantities.pdf | ||
| JA-9_Submittal_Register_FTQW11-2009_(2).pdf | ||
| JA-11_Wage_Determination_AK7.pdf | ||
| JA-10_Current_Road_Paint_Product_Data_Sheet.pdf | ||
| JA-7_Turning_Lane_Marking_Addition.pdf | ||
| JA-5_Road_Map.pdf | ||
| JA-6_Crosswalk_Addition.pdf | ||
| JA-2_AKDOT_Standard_Specs_MMA.pdf | ||
| JA-4_EAFB_Specifications.pdf | ||
| FA5004-14-B-C006_IFB.doc | DOC document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROADWAY PAINTING ATTACHMENT JA-1
EIELSON AFB, ALASKA STATEMENT OF WORK
FTQW 11-2009 SOLICITATION FA5004-14-B-C006
STATEMENT OF WORK
FOR
PROJECT FTQW 11-2009
Roadway Painting
1.0 INTRODUCTION: Eielson Air Force Base (EAFB) is located approximately 23 miles southeast of Fairbanks, AK. The roads that are being striped with this project are the highest trafficked roads on EAFB. The current road markings were painted with Ennis Low V.O.C traffic paint in the summer of 2011.
2.0 SCOPE: Furnish all labor, supplies, parts, transportation, tools, equipment, and facilities necessary to perform work required to complete project FTQW 11-2009 in strict accordance with this Statement of Work, specifications, and the contract.
3.0 DESCRIPTION OF WORK: This project consists of removal of pavement markings that were painted incorrectly and painting pavement markings on EAFB roads. The roads to be painted include: Flightline Avenue, Central Avenue, North Street, Kodiak Street, Quarry Road, Division Street, and Wabash Avenue in their entirety, and Arctic Avenue NOT including from the center of its intersection with French Creek Drive to Transmitter Road, Broadway Street from Flightline Avenue to its intersection with Raven’s Way, and Raven’s Way from with Arctic Avenue to its intersection with Broadway Street. Tab 4 is a map that highlights these roads to be painted.
3.1 Paint 4” extruded MMA lines on roadways as they exist except replacing the broken lines outlined in 3.3 with broken lines that are 10 feet with gaps of 30 feet between segments. The estimated yellow paint is 161,580 LF and the estimated white paint is 98,558 LF. The estimated total paint for 4” lines to be used is 260,138 LF.
3.2 Install extruded MMA as existing for all arrows, lettering, stop bars and cross hatching on the roads to be painted. Add two turning arrows and two “ONLY” lettering on the Flightline Avenue turn off to Central Avenue as specified in Tab 6. Add two crosswalks on Central Avenue at the locations specified in Tab 5. The estimated yellow paint for pavement markings (non- 4” lines) is 733 SF and for white paint for pavement markings (non- 4” lines) is 2886 SF. The estimated total for pavement markings (non- 4” lines) is 3,619 LF.
3.3 Remove the yellow broken lines on Flightline Ave. and Quarry Avenue, as specified in Tab 4, that are not painted in 10 foot segments and gaps of 30 feet between segments. The estimate total for removal of pavement markings is 1,717 SF.
4.0 SUBMITTALS: As indicated in the attached AF Form 66, Schedule of Material Submittals.
5.0 GOVERNMENT FURNISHED MATERIALS: None
ROADWAY PAINTING ATTACHMENT JA-1
EIELSON AFB, ALASKA STATEMENT OF WORK
FTQW 11-2009 SOLICITATION FA5004-14-B-C006
6.0 INSTRUCTIONS TO THE CONTRACTOR:
6.1 Mission priorities take precedence over this work. Scheduling and coordination with the Government must be done to ensure there is no conflict with the mission. This may lead to the potential for non-normal work hours. The Contracting Officer shall be notified of any incidents or issues that may affect the work schedule or contract. On critical issues, oral notification should be made immediately, followed by written notification as soon as practical.
6.2 The Contractor shall keep the work area clean of all debris on a daily basis or more often as required. The Contractor shall keep storage areas clean and orderly at all times.
The Contractor shall dispose of combustible wastes at the end of each work day and under no circumstances allow them to accumulate.
END OF STATEMENT