FA5004-14-B-C006-0001.pdf
PDF 24 KB Posted
- Attached to
- Roadway Painting Federal contract opportunity
- Solicitation number
- FA5004-14-B-C006
About this file
Amendment FA5004-14-B-C006-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5004-14-B-C006-0003_Amendment.pdf | ||
| JA-13_Roadway_Painting_questions_and_answers_1.pdf | ||
| FA5004-14-B-C006-0002_Amendment.pdf | ||
| JA-12_ETL-97-17.pdf | ||
| JA-9_Submittal_Register_FTQW11-2009_(2).pdf | ||
| JA-1_Roadway_Painting_FTQW11-2009_SOW_IFB.pdf | ||
| JA-11_Wage_Determination_AK7.pdf | ||
| JA-10_Current_Road_Paint_Product_Data_Sheet.pdf | ||
| JA-7_Turning_Lane_Marking_Addition.pdf | ||
| JA-5_Road_Map.pdf | ||
| JA-6_Crosswalk_Addition.pdf | ||
| JA-2_AKDOT_Standard_Specs_MMA.pdf | ||
| JA-4_EAFB_Specifications.pdf | ||
| FA5004-14-B-C006_IFB.doc | DOC document | |
| JA-3_Technical_Specifications_Roadway_Painting.pdf | ||
| JA-8_Roadway_Paint_Estimated_Quantities.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FTQW 11-2009
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to:
1. Incorporate Engineering Technical Letter (ETL) 97-17 as attachment JA-12.
2. All other terms and conditions shall remain the same.
3. Point of contact for this amendment is SSgt William Barker, email: w illiam.barker.1@us.af.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Jul-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5004-14-B-C006
X 9B. DATED (SEE ITEM 11)
01-Jul-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jul-2014
CODE
354 CONTRACTING SQUADRON ISSUING OFFICE
2310 CENTRAL AVE, BLDG 2258
LGCA - CONSTRUCTION
EIELSON AFB AK 99702-1801
FA5004 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5004-14-B-C006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The Issued By organization has changed from
354 CONTRACTING SQUADRON ISSUING OFFICE
2310 CENTRAL AVE, BLDG 2258
LGCA - CONSTRUCTION
EIELSON AFB AK 99702-1801
to
354 CONTRACTING SQUADRON -- ISSUING OFFI
2310 CENTRAL AVE, BLDG 2258
LGCB - COMMODITIES/SERVICES
EIELSON AFB AK 99702-1887
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENTS
LIST OF ATTACHMENTS
(All Listed Attachments are at the end of this document.)
FORM
NUMBER
DOCUMENT TITLE
CURRENT
AS OF
NUMBER OF
PAGES
JA-1 Roadway Painting FTQW11-2009 SOW IFB 11 Jun 14 2
JA-2 AKDOT Standard Specs MMA 11 Jun 14 9
JA-3 Technical Specifications Roadway Painting 11 Jun 14 70
JA-4 EAFB Specifications 11 Jun 14 431
JA-5 Road Map 11 Jun 14 1
JA-6 Crosswalk Addition 11 Jun 14 1
JA-7 Turning Lane Marking Addition 11 Jun 14 1
JA-8 Roadway Paint Estimated Quantities 11 Jun 14 1
JA-9 Submittal Register FTQW 11-2009 11 Jun 14 2
JA-10 Current Road Paint Product Data Sheet 11 Jun 14 2
JA-11 Wage Determination AK140006 01032014 AK6 AK20130007 11 Jun 14 8
JA-12 ETL 97-17 21 Jul 14 3
(End of Section J)
FA5004-14-B-C006
(End of Summary of Changes)
File details come from the government source that posted it. Updated .