Statement of Work Summary
This is a Statement of Work (SOW) for a carpet replacement project at Building 606, Fort Richardson, Alaska, located on Joint Base Elmendorf-Richardson. The project, dated 11 June 2026, requires removal of existing carpet and cove base from the 1st and 2nd floors, followed by installation of commercial-grade carpet (olive drab green, nylon, plush, 60 oz, heavy traffic) and new cove base throughout designated areas. Floor 1 encompasses 1,280 square feet of carpet installation, and Floor 2 encompasses 1,517 square feet, with specific rooms excluded as identified on the floor plan. All work must be completed while the building remains occupied, with contractors required to coordinate schedules with the 773 CES/CEOES office and be escorted by facility personnel at all times due to security requirements.
The contractor is responsible for all floor preparation work, compliance with applicable building and fire codes, OSHA and AFOSH standards, and incorporation of green procurement principles per EPA requirements. The SOW specifies that contractors must field-verify all measurements and quantities, maintain a clean debris-free worksite, secure the site against unauthorized access, and repair any damage to existing property at no cost to the government. Contractors are prohibited from parking on sidewalks or grassy/snowy areas and must dispose of all construction debris at an approved off-base facility. Manufacturer warranties for all products must be provided, and final inspection and acceptance will occur upon 100 percent completion. Project management is handled by Ryan Echon at ryan.echon.1@us.af.mil, 907-552-3252. Liquidated damages will be assessed for work not completed within the scheduled performance period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 2 changes: 3.1.3: verbiage removed: “VCT” Amendment 3 changes: 3.1.3: verbiage removed: “Tile”, floor plans updated on last page
11 June 2026
STATEMENT OF WORK
Bldg. 606 Demo and Replace Carpet
SECTION 1: PROJECT INFORMATION
1.1 PROJECT LOCATION: A Street, Bldg 606, Fort Richardson, AK 99505, 1st & 2nd floor on Joint Base Elmendorf-Richardson, AK. Project hours are to be coordinated with the user.
Weekend hours may be requested.
1.2 UNIQUE REQUIREMENT: None
1.3 PROJECT DESCRIPTION: Replace existing carpet with a commercial grade carpet
(color: olive drab green, nylon, plush, 60 oz, heavy traffic) and cove throughout the facility (see layout map). Existing carpet and cove base shall be removed. All floors shall receive necessary prep work for new floor finishes. This work will be accomplished while the building is occupied. The building has security requirements that require contractors to be escorted by facility personnel at all times.
SECTION 2: GENERAL REQUIREMENTS
2.1 WORKMANSHIP: All work shall be accomplished in accordance with all applicable building and fire codes. Contractor shall field verify all measurements, quantities, or value stated by the Government. Liquidated damages shall be assessed for work that is not finished within the scheduled performance period.
2.2 WORKSITE: The contractor shall limit the work to the areas indicated by the government. The contractor shall make every effort not to disturb or obstruct portions of the facilities still occupied by the government. The contractor shall make efforts to minimize interference to Government operations. The contractor shall coordinate and schedule work with the 773 CES/CEOES office prior the start of any operation. The contractor shall dispose of all construction debris off base at an approved disposal facility.
2.3 SITE SECURITY AND PROTECTION: The contractor shall make every effort to secure the work site, allowing only authorized personnel to enter the work site. The contractor shall protect the site from damage from weather, vandalism, and/or theft.
2.4 DAMAGE TO EXISTING SITE CONDITIONS: The contractor shall be responsible to repair any and all damage incurred to existing Real Property/Grounds due to poor workmanship at no cost to the government. Contractor shall not park or drive on sidewalk or grassy/snowy areas. Damage incurred shall be repaired at no cost to the government.
2.5 HEALTH/SAFETY: The contractor shall be responsible for compliance with OSHA and AFOSH standards. The contractor shall maintain a clean and debris free site at all times.
The contractor shall keep driveways and entrances into and around the work site clear at all times. The contractor shall not use driveways or entrances as employee parking or storage of materials unless otherwise stated. The contractor shall minimize storage of materials and equipment on site.
2.6 GREEN PROCURMENT: Contractor must incorporate “green procurement” principles into the design of their projects. Specifically, consult the EPA’s web site at https://www.epa.gov/contracts/greening-government-procurement for a listing of the products that have been mandated as green procurement requirements for purchases.
2.7 WARRANTIES: Contractor shall provide all commercial warranties for product as provided by the manufacturer.
2.8 FINAL INSPECTION AND ACCEPTANCE: A final walk through will be conducted with the customer prior to acceptance. Upon 100 percent completion and acceptance, contractors shall bill for services using Wide Area Workflow/PIEE. All payments shall be invoiced according to 252.232-7000 citing the DoDAACs for inspector and acceptor.
SECTION 3: DESCRIPTION OF WORK AND SPECIAL INSTRUCTIONS
3.1 Requirements & Finishes
3.1.1. Demo cove base
3.1.2. Demo carpet/tile and prep floor for new finishes
3.1.3. Install new carpet (color: Olive Drab Green) and VCT
3.1.4. Install new cove base
SECTION 4: SPECIAL PROVISIONS/NOTES/SPECIFICATIONS
4.1 Rooms that are excluded from new flooring are listed on the floor plan
SECTION 5: ATTACHMENTS
5.1 Floor plan
SECTION 6: PROJECT MANAGER
6.1 Ryan Echon
ryan.echon.1@us.af.mil Phone: 907-552-3252 https://www.epa.gov/contracts/greening-government-procurement mailto:ryan.echon.1@us.af.mil
Bldg. 606 Carpet Project Layout
Floor 1 = 1,280 sq ft of CARPET
Floor 2 = 1,517 sq Ft of CARPET
161 sq ft 202 sq ft
79 sq ft
579 sq ft
193 sq ft66 sq ft
160 sq ft
204 sq ft 202 sq ft 204 sq ft
407 sq ft
67 sq ft 273 sq ft
| Amendment 3 - Attachment 1 - SOW Demo and Replacement 606.pdf |
| 1.2 UNIQUE REQUIREMENT: None |
| SECTION 2: GENERAL REQUIREMENTS |
| SECTION 3: DESCRIPTION OF WORK AND SPECIAL INSTRUCTIONS |
| 3.1 Requirements & Finishes |
| SECTION 4: SPECIAL PROVISIONS/NOTES/SPECIFICATIONS |
| SECTION 5: ATTACHMENTS |
| SECTION 6: PROJECT MANAGER |
Bldg. 606 Floor Plan.pdf