Amendment 2 - Attachment 1 - SOW Demo and Replacement 606.pdf
PDF 697 KB Posted
- Attached to
- Carpet Replacement Building 606
- Solicitation number
- FA500027Q0003
About this file
This is a Statement of Work (SOW) issued by the 773d Civil Engineer Squadron at Joint Base Elmendorf-Richardson, Alaska, dated 11 June 2026, for carpet demolition and replacement at Building 606, A Street, Fort Richardson, AK 99505.
The project requires removal of existing carpet and cove base from the 1st and 2nd floors of an occupied building, followed by floor preparation and installation of new commercial-grade olive drab green nylon plush carpet (60 oz, heavy traffic rated) with cove base. Floor 1 encompasses 1,230 square feet and Floor 2 encompasses 1,477 square feet of carpet installation. Work must be performed during normal building hours while coordinated with facility personnel; weekend hours may be requested. Specific rooms excluded from new flooring are identified on the attached floor plan. The contractor must remove all construction debris off-base at an approved facility and is responsible for all floor preparation to meet building and fire codes. The building has security requirements mandating contractor escort by facility personnel at all times. The contractor must coordinate scheduling with the 773 CES/CEOES office prior to commencing work. The contractor bears full responsibility for repairing any damage to existing real property or grounds resulting from poor workmanship at no cost to the government and must comply with OSHA and AFOSH standards while maintaining a clean, debris-free work site. Contractor must incorporate green procurement principles in accordance with EPA requirements. All commercial warranties provided by manufacturers must be supplied for products installed. Final inspection and acceptance will be conducted with the customer prior to payment authorization. The project manager is Ryan Echon, ryan.echon.1@us.af.mil, 907-552-3252. Liquidated damages will be assessed for work not completed within the scheduled performance period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
773d Civil Engineer Squadron Joint Base Elmendorf-Richardson, AK
11 June 2026
STATEMENT OF WORK
Bldg. 606 Demo and Replace Carpet
SECTION 1: PROJECT INFORMATION
1.1 PROJECT LOCATION: A Street, Bldg 606, Fort Richardson, AK 99505, 1st & 2nd floor on Joint Base Elmendorf-Richardson, AK. Project hours are to be coordinated with the user. Weekend hours may be requested.
1.2 UNIQUE REQUIREMENT: None
1.3 PROJECT DESCRIPTION: Replace existing carpet with a commercial grade carpet
(color: olive drab green, nylon, plush, 60 oz, heavy traffic) and cove throughout the facility (see layout map). Existing carpet and cove base shall be removed. All floors shall receive necessary prep work for new floor finishes. This work will be accomplished while the building is occupied. The building has security requirements that require contractors to be escorted by facility personnel at all times.
SECTION 2: GENERAL REQUIREMENTS
2.1 WORKMANSHIP: All work shall be accomplished in accordance with all applicable building and fire codes. Contractor shall field verify all measurements, quantities, or value stated by the Government. Liquidated damages shall be assessed for work that is not finished within the scheduled performance period.
2.2 WORKSITE: The contractor shall limit the work to the areas indicated by the government. The contractor shall make every effort not to disturb or obstruct portions of the facilities still occupied by the government. The contractor shall make efforts to minimize interference to Government operations. The contractor shall coordinate and schedule work with the 773 CES/CEOES office prior the start of any operation. The contractor shall dispose of all construction debris off base at an approved disposal facility.
2.3 SITE SECURITY AND PROTECTION: The contractor shall make every effort to secure the work site, allowing only authorized personnel to enter the work site. The contractor shall protect the site from damage from weather, vandalism, and/or theft.
2.4 DAMAGE TO EXISTING SITE CONDITIONS: The contractor shall be responsible to repair any and all damage incurred to existing Real Property/Grounds due to poor workmanship at no cost to the government. Contractor shall not park or drive on sidewalk or grassy/snowy areas. Damage incurred shall be repaired at no cost to the government.
2.5 HEALTH/SAFETY: The contractor shall be responsible for compliance with OSHA and AFOSH standards. The contractor shall maintain a clean and debris free site at all times.
The contractor shall keep driveways and entrances into and around the work site clear at all times. The contractor shall not use driveways or entrances as employee parking or storage of materials unless otherwise stated. The contractor shall minimize storage of materials and equipment on site.
2.6 GREEN PROCURMENT: Contractor must incorporate “green procurement” principles into the design of their projects. Specifically, consult the EPA’s web site at https://www.epa.gov/contracts/greening-government-procurement for a listing of the products that have been mandated as green procurement requirements for purchases.
SECTION 3: DESCRIPTION OF WORK AND SPECIAL INSTRUCTIONS
3.1 Requirements & Finishes
3.1.1. Demo cove base
3.1.2. Demo carpet/tile and prep floor for new finishes
3.1.3. Install new carpet (color: Olive Drab Green) and VCT
3.1.4. Install new cove base
SECTION 4: SPECIAL PROVISIONS/NOTES/SPECIFICATIONS
4.1 Rooms that are excluded from new flooring are listed on the floor plan
SECTION 5: ATTACHMENTS
5.1 Floor plan
SECTION 6: PROJECT MANAGER
6.1 Ryan Echon
ryan.echon.1@us.af.mil Phone: 907-552-3252
2.8 FINAL INSPECTION AND ACCEPTANCE: A final walk through will be conducted with the customer prior to acceptance. Upon 100 percent completion and acceptance, contractors shall bill for services using Wide Area Workflow/PIEE. All payments shall be invoiced according to 252.232-7000 citing the DoDAACs for inspector and acceptor.
2.7 WARRANTIES: Contractor shall provide all commercial warranties for product as provided by the manufacturer.
mailto:ryan.echon.1@us.af.mil 1593519895A Cross-Out
Bldg. 606 Carpet Project Layout
Floor 1 = 1230 sq ft of CARPET
Floor 2 = 1477 sq Ft of CARPET
| SOW Replace Carpet Building 606 - 18 Nov 2026.pdf |
| SECTION 1: PROJECT INFORMATION |
| SECTION 2: GENERAL REQUIREMENTS |
| SECTION 3: DESCRIPTION OF WORK AND SPECIAL INSTRUCTIONS |
| SECTION 4: SPECIAL PROVISIONS/NOTES/SPECIFICATIONS |
| SECTION 5: ATTACHMENTS |
| SECTION 6: PROJECT MANAGER |